北京市燃氣翻轉內襯工藝實施優(yōu)化研究

發(fā)布時間:2018-03-09 00:17

  本文選題:翻轉內襯 切入點:施工組織 出處:《北京建筑大學》2014年碩士論文 論文類型:學位論文


【摘要】:北京市區(qū)目前有上千公里的燃氣管線,因運行年限過長,腐蝕情況十分嚴重,急需改造。由于北京市近年來城市建設速度較快,道路上機動車數(shù)量猛增,同時地下各綜合管線不斷實施,造成原位開槽換管實施難度加大,各項非開挖修復工藝大量應用在實際改造工程中,其中翻轉內襯修復方式在實際運用過程中體現(xiàn)出了突出的優(yōu)勢。2011年市燃氣集團完成對東三環(huán)華威橋下700多米燃氣高壓管線的翻轉內襯修復。作為試驗段,該工藝經檢測完全適用于老舊高壓燃氣管道的修復工作[1],可以在高壓燃氣管線修復工作中加以推廣,通過試驗擴展了翻轉內襯工藝應用的范圍,解決了高壓管線非開挖修復的難題。然而在翻轉內襯工藝實施過程中由于受到城市管理要求制約,以及不可知因素限制,造成前期手續(xù)辦理周期較長,以及現(xiàn)場條件復雜造成施工降效情況發(fā)生,無法達到消除管線隱患的目的,因此需要對翻轉內襯工藝組織實施過程,尤其是建設單位手續(xù)辦理方面通過優(yōu)化組織機構的方式加以改進,在總結工藝實施流程經驗的基礎上,高效推進工作,確保施工工期的目的。
[Abstract]:At present, there are thousands of kilometers of gas pipelines in Beijing's urban areas. Due to the long service life, the corrosion situation is very serious, and it is in urgent need of renovation. Because of the rapid urban construction in Beijing in recent years, the number of motor vehicles on the roads has increased dramatically. At the same time, the continuous implementation of underground comprehensive pipelines, resulting in in situ slotted pipe change implementation difficulties, various non-excavation repair technology is widely used in the actual transformation project, In 2011, the City Gas Group completed the repair of more than 700 meters of high pressure gas pipeline under Huawei Bridge in East third Ring Road. The process is fully applicable to the repair of old and old high pressure gas pipelines [1], and can be popularized in the repair of high pressure gas pipelines. The scope of application of the reverse liner process is extended through experiments. The problem of non-excavation and repair of high-pressure pipeline is solved. However, due to the restriction of urban management and unknowable factors in the implementation of the overturned lining process, the pre-procedure processing period is longer. And the complex conditions of the site cause the situation of construction efficiency reduction, which can not achieve the purpose of eliminating the hidden danger of pipeline, so it is necessary to organize the implementation process of the overturned lining process. In particular, the procedures of construction units should be improved by optimizing the organizational structure. On the basis of summing up the experience of the process implementation process, the work should be advanced efficiently to ensure the purpose of construction period.
【學位授予單位】:北京建筑大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TU996.8

【參考文獻】

相關期刊論文 前8條

1 張淑潔;王瑞;王歡;;管道修復用管狀紡織復合材料強度的設計原理[J];復合材料學報;2008年02期

2 韓權友;強化施工現(xiàn)場管理促進文明施工的思考[J];建筑管理現(xiàn)代化;2005年02期

3 張一先,張隆;管道煤氣泄漏事故評估的不確定性[J];煤氣與熱力;2000年01期

4 周中;天然氣管道防腐問題的探討[J];煤氣與熱力;2001年03期

5 梁莉嘉;陳榮清;;埋地燃氣管道防腐綜合評價與修復技術分析[J];煤氣與熱力;2009年06期

6 董薊偉;孫明燁;曹國權;翟博;龔明;;非開挖翻轉內襯技術在燃氣管道修復的應用[J];煤氣與熱力;2011年07期

7 王佩建;;淺談建筑施工企業(yè)的文明施工管理[J];建材技術與應用;2007年02期

8 付先波;;建筑企業(yè)文明施工管理探討[J];中州煤炭;2007年01期



本文編號:1586172

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/1586172.html


Copyright(c)文論論文網All Rights Reserved | 網站地圖 |

版權申明:資料由用戶98bb5***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com