公路工程總承包項(xiàng)目投標(biāo)決策研究
[Abstract]:With the social and economic development of our country, the development and construction of highway engineering project plays an increasingly important role in the national strategy. In recent years, more and more attention has been paid to the advantages of the general contracting mode in shortening the construction period, improving the quality and saving the cost, and has been applied well in the fields of electric power, petroleum, chemical industry, etc. However, in the field of highway engineering, it is still in the stage of exploration, especially in the decision-making of bidding for general contracting projects of highway projects, and the relevant theoretical studies are still very weak. Therefore, it is of practical significance to study the bidding decision of highway general contracting project. From the point of view of highway engineering general contracting enterprise, this paper makes a thorough study on two issues, namely, pre-bid decision and bidding quotation decision, in order to provide theoretical guidance for the general contracting enterprise to improve the competitive power of bidding. First of all, through the study of highway engineering general contracting theory, the scope of highway engineering general contract project mentioned in this paper is defined as the general contract project from the initial design. Based on the analysis of the bidding decision theory of highway engineering general contracting project, the bidding decision of highway general contract project is divided into two stages: early bidding decision stage and late bidding decision stage. Secondly, the paper analyzes the influencing factors of the pre-tender decision from three aspects: the general contracting enterprise, the general contract project and the external main body of the general contracting enterprise. The SWOT qualitative analysis method and quantitative analysis method are combined to establish a simple model of pre-bidding decision. Thirdly, based on the analysis of the work content in the late stage of highway engineering general contracting project bidding, and based on the characteristics of highway engineering general contracting mode, this paper puts forward the strategy of general contracting enterprise to compile technical scheme, management scheme and commercial plan. In the bidding strategy of commercial scheme, based on the characteristics of bill of quantities pricing mode in China, the bidding price is divided into engineering cost and high price, and it is proposed that the general contracting enterprise should adopt the method of estimating the cost and profit risk cost. Finally, on the basis of previous studies, the paper establishes the set of profit influencing factors and the risk and fee influencing factors set from the composition of elevation gold, and establishes the decision model of elevation gold by using the analytic hierarchy process of network and the fuzzy comprehensive evaluation method. It provides decision basis for bidding quotation of general contracting enterprise. At the end of the thesis, the conclusion of this paper is summarized, and the direction of further research is put forward.
【學(xué)位授予單位】:長安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:F426.92
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊會(huì)云;徐紅玲;;模糊綜合評(píng)價(jià)在EPC總承包投標(biāo)風(fēng)險(xiǎn)中應(yīng)用[J];低溫建筑技術(shù);2009年08期
2 高一平;;淺談公路工程投標(biāo)報(bào)價(jià)的編制與策略[J];廣東建材;2012年04期
3 廖泉榮;公路工程招投標(biāo)中的工程量清單計(jì)價(jià)[J];廣東交通職業(yè)技術(shù)學(xué)院學(xué)報(bào);2004年03期
4 卞藝杰;李開運(yùn);;投標(biāo)中可靠性報(bào)價(jià)策略模型[J];河海大學(xué)學(xué)報(bào);1991年03期
5 緒軍;胡意華;;推行設(shè)計(jì)——施工總承包招標(biāo)的思考[J];機(jī)電信息;2008年20期
6 彭軍龍;張起森;;一種工程項(xiàng)目報(bào)價(jià)決策的新定量模型研究[J];重慶建筑大學(xué)學(xué)報(bào);2006年01期
7 李佑蓮;謝大勇;;熵權(quán)理論在工程投標(biāo)項(xiàng)目決策中的應(yīng)用[J];基建優(yōu)化;2007年02期
8 劉萬琳;張國志;;模糊綜合評(píng)價(jià)下的標(biāo)高金確定模型[J];森林工程;2011年02期
9 屈秀山;姚省院;;解析電力工程總承包風(fēng)險(xiǎn)及如何規(guī)避[J];通訊世界;2014年22期
10 陶亦軍;;基于SWOT分析的企業(yè)投標(biāo)決策探討[J];現(xiàn)代商業(yè);2010年06期
相關(guān)碩士學(xué)位論文 前6條
1 鄭叢旭;基于博弈論的公路工程項(xiàng)目投標(biāo)報(bào)價(jià)研究[D];長沙理工大學(xué);2010年
2 郭聰林;公路工程投標(biāo)策略及報(bào)價(jià)技巧研究[D];長安大學(xué);2011年
3 梁麗華;工程總承包風(fēng)險(xiǎn)控制體系構(gòu)建及其應(yīng)用研究[D];華北電力大學(xué);2011年
4 王俊霞;公路建設(shè)項(xiàng)目投標(biāo)策略研究[D];河北工業(yè)大學(xué);2006年
5 許薇;設(shè)計(jì)施工總承包招標(biāo)資格預(yù)審條件研究[D];武漢理工大學(xué);2013年
6 郭建桂;公路總承包項(xiàng)目全過程設(shè)計(jì)管理研究[D];長安大學(xué);2014年
,本文編號(hào):2214407
本文鏈接:http://www.sikaile.net/qiyeguanlilunwen/2214407.html