水電項(xiàng)目 在 工業(yè)經(jīng)濟(jì) 分類中 的翻譯結(jié)果
本文關(guān)鍵詞:水利水電項(xiàng)目經(jīng)濟(jì)風(fēng)險(xiǎn)的模糊分析方法,由筆耕文化傳播整理發(fā)布。
在分類學(xué)科中查詢 所有學(xué)科 工業(yè)經(jīng)濟(jì) 水利水電工程 環(huán)境科學(xué)與資源利用 電力工業(yè) 行政學(xué)及國(guó)家行政管理 投資 歷史查詢
水電項(xiàng)目
Studies on investment environment and policies of quasi-public interest hydropower project
準(zhǔn)公益性水電項(xiàng)目投融資環(huán)境及政策研究
短句來(lái)源
Optimization purchases for hydropower project of World Bank credit
世行貸款水電項(xiàng)目的優(yōu)化采購(gòu)
短句來(lái)源
On Sustainable Strategy of Exploiting Hydropower Project
水電項(xiàng)目開(kāi)發(fā)可持續(xù)發(fā)展措施探析
短句來(lái)源
Carrying out Investment System Reform Decision and Fulfilling Hydropower Project Examination and Approval
貫徹投資體制改革決定 做好水電項(xiàng)目核準(zhǔn)工作
短句來(lái)源
Under the new economic system, Hydropower investors have been exploring newManagement Mode of Hydropower Project in order to get maximum return ofinvestment.
在新的經(jīng)濟(jì)體制下,水電投資者為了獲得最大的投資效益,在不斷地探索新的水電項(xiàng)目管理模式。
短句來(lái)源
更多
Research on investment distribution method for multi-objective hydropower projects
多目標(biāo)水電項(xiàng)目投資分?jǐn)偡椒ㄑ芯?/p>
短句來(lái)源
Fuzzy analysis method for economic risk of water resources and hydropower projects
水利水電項(xiàng)目經(jīng)濟(jì)風(fēng)險(xiǎn)的模糊分析方法
短句來(lái)源
SIMULATION-BASED FINANCIAL RISK ANALYSIS FOR LARGE-SCALE HYDROPOWER PROJECTS
基于模擬技術(shù)的大型水電項(xiàng)目財(cái)務(wù)風(fēng)險(xiǎn)分析
短句來(lái)源
Financing & Capital Operations of Large Hydropower Projects——A Summary Review of Financing Strategies & Practices in Three Gorges Project
大型水電項(xiàng)目融資與資本運(yùn)作——三峽工程10年來(lái)的融資策略及實(shí)踐
短句來(lái)源
Research on Investment-Distribution-Method for Multi-Objective Hydropower Projects
多目標(biāo)水利水電項(xiàng)目費(fèi)用的分?jǐn)傃芯?/p>
短句來(lái)源
更多
A Multi-objective Fuzzy Decision Method for Hydroelectric Power Project Investment
水電項(xiàng)目投資的多目標(biāo)模糊決策方法
短句來(lái)源
Problem of multi objective decision for hydroelectric power project investment is proposed in this paper.
對(duì)水電項(xiàng)目投資方案多目標(biāo)決策問(wèn)題進(jìn)行了研究 .
短句來(lái)源
On the basis of fundamental principle of multi objective fuzzy optimization,this paper advanced a multi objective fuzzy model to optimize hydroelectric power project investment schemes based on the regressive and composite method that analyses the objective importance. Numerical results show availability and effectiveness of multi objective decision for hydroelectric power project investment by an example.
根據(jù)多目標(biāo)模糊優(yōu)化的基本原理 ,結(jié)合目標(biāo)相對(duì)優(yōu)屬度概念 ,給出了多目標(biāo)模糊決策中通過(guò)回歸確定權(quán)重的方法 ,同時(shí)提出了基于權(quán)重回歸組合的水電項(xiàng)目投資多目標(biāo)決策模糊優(yōu)化方法 ,通過(guò)實(shí)例驗(yàn)證了該模型的合理性和有效性
短句來(lái)源
Speed up hydropower development in the western area
調(diào)低水電項(xiàng)目最低資本金比率 加快西部水電開(kāi)發(fā)
短句來(lái)源
Five-year development and new achievement of hydropower construction:Review of investigation and design for West to East Power Transmission Project
五年大開(kāi)發(fā) 水電譜新篇——貴州西電東送工程首批水電項(xiàng)目勘測(cè)設(shè)計(jì)工作回顧
短句來(lái)源
Thinking on the standardization of bidding and tendering for the investigation and design of hydro-engineering projects
水電項(xiàng)目勘測(cè)設(shè)計(jì)招投標(biāo)規(guī)范化問(wèn)題的思考
短句來(lái)源
The Analysis of Risks for WuLing Hydropower Development Corporation
五凌水電項(xiàng)目建設(shè)風(fēng)險(xiǎn)管理研究
短句來(lái)源
The author further gives some recommendations on financing problem dealing with the hydroelectric power industry in Sichuan Province based on the above-mentioned conclusions as follows:
本文共分三個(gè)部分。 第一部分主要是提出問(wèn)題,第二部分對(duì)水電項(xiàng)目在市場(chǎng)條件下融資出路作了理論探討,并以此為基礎(chǔ),對(duì)解決四川水電產(chǎn)業(yè)的融資問(wèn)題提出了三個(gè)層次的對(duì)策。
短句來(lái)源
更多
查詢“水電項(xiàng)目”譯詞為用戶自定義的雙語(yǔ)例句
我想查看譯文中含有:的雙語(yǔ)例句
為了更好的幫助您理解掌握查詢?cè)~或其譯詞在地道英語(yǔ)中的實(shí)際用法,我們?yōu)槟鷾?zhǔn)備了出自英文原文的大量英語(yǔ)例句,供您參考。
hydropower project
Design of high precision horizontal control network for large-scale hydropower project
The application of various criteria and certain new approaches to design is illustrated by the example of the Lower Collierville Pressure Tunnel of the North Fork Stanislaus River Hydropower Project in California.
A background of the toppling slope failures associated with a large hydropower project in China instigated the need for the centrifuge study.
The Green Hydropower project aimed at establishing an environmental product label for hydropower plant operation, which should help overcome these problems.
Assessment of the impact of the Lower Kihansi Hydropower Project on the forests of Kihansi Gorge, Tanzania
更多
hydropower projects
It is proved that air entrainment is one of the efficient measures dealing with cavitation control for the release works of hydropower projects.
Four improved expressions of the emergence angle with weight coefficient were investigated through experimental data of 68 points observed from 12 aerators of 6 hydropower projects, of both model and prototype, on the basis of error theory.
Assessment of man-made and natural hazards in the surroundings of hydropower projects under construction in the beas valley of n
These resources have been supporting enough for the generation of electricity through introducing hydropower projects since the last decade.
Due to the fragile nature of topography and delicacy of ecology of the Himalaya, it results in lot of disturbances because of high degree of human interferences like construction of major hydropower projects.
更多
hydroelectric power project
A segment discusses the issues surrounding the James Bay Hydroelectric Power Project.
t is essential to scientifically account the accumulations provided by hydropower plant for realizing rolling development of hydropower projects.This paper analyzes the British power reform in respect to establishment of power commodity market,realization of power plant into electric network under independent accounting,improvement of power price and establishment of settle accounts.The results show that it is possible to perform independent accounting for hydropower plant.Some suggestions are provided.
科學(xué)地核算水力發(fā)電廠提供的積累是實(shí)現(xiàn)水電項(xiàng)目滾動(dòng)開(kāi)發(fā)的必要條件。本文通過(guò)剖析英國(guó)電力體制改革中如何建立電力商品市場(chǎng).如何實(shí)現(xiàn)發(fā)電商在獨(dú)立核算的條件下競(jìng)爭(zhēng)上網(wǎng).如何改革電價(jià)體制.如何建立結(jié)算制度入手.表明水力發(fā)電廠是可以實(shí)行獨(dú)立核算的。并在此基礎(chǔ)上對(duì)某些觀點(diǎn)提出見(jiàn)解。
In order to study and deal with the exist question of local hydraulic and hydroelectric construction item and accelerate the construction of local hydraclic and hydroelectric item, through the investigation of four important hydraulic and hydroelectric construction item in Fuzhou and Jian Prefecture in Jiangxi province, we can find some generality questions and put forward the measurement.
為研究與解決地方水利水電建設(shè)項(xiàng)目中存在的問(wèn)題,加快地方水利水電項(xiàng)目的建設(shè),通過(guò)對(duì)江西省贛州、吉安兩地區(qū)的4個(gè)省重點(diǎn)水利水電建設(shè)項(xiàng)目的調(diào)查,發(fā)現(xiàn)一些帶有共性的問(wèn)題并提出了解決辦法.
The principles of pricing the electricity in the power network which are stipulated by the State authorities concerned mainly include the peak valley time sharing power tariff principle, power tariff principle during high and low water periods, and the principle for new price for new power. The estimating method of the power tariff for new hydropower project is counter derived on the basis of loan principle and interest repayment during the loan repayment and then calculated based on meeting the needs of...
The principles of pricing the electricity in the power network which are stipulated by the State authorities concerned mainly include the peak valley time sharing power tariff principle, power tariff principle during high and low water periods, and the principle for new price for new power. The estimating method of the power tariff for new hydropower project is counter derived on the basis of loan principle and interest repayment during the loan repayment and then calculated based on meeting the needs of the base benefit rate of power industry after the completion of loan repayment; or is estimated based on the rise trend of power tariff in the power network and the user's affording capacity; or is estimated by the marginal cost method; or is estimated by adopting the rational financial profit rate. For estimating the power tariff of hydropower project with long construction period, all the following factors shall be taken into account, that is, the inflation factor, the loan interest during construction period, the payable profit repayment and the power price during the operation period.
國(guó)家有關(guān)部門規(guī)定的上網(wǎng)電價(jià)確定原則主要包括峰谷分時(shí)電價(jià)原則、豐枯電價(jià)原則和新電新價(jià)原則。水電建設(shè)項(xiàng)目上網(wǎng)電價(jià)的測(cè)算主要有以下幾種方法:還貸期間按歸還貸款本息反推,還清貸款后按滿足本行業(yè)基準(zhǔn)收益率測(cè)算;根據(jù)電網(wǎng)電價(jià)的上漲趨勢(shì)及用戶的承受能力測(cè)算;采用邊際成本法測(cè)算;采用合理的資金利潤(rùn)率測(cè)算。在測(cè)算建設(shè)期較長(zhǎng)的水電項(xiàng)目上網(wǎng)電價(jià)時(shí),要考慮通貨膨脹因素對(duì)上網(wǎng)電價(jià)的影響、建設(shè)期應(yīng)計(jì)利息的劃分、資本金應(yīng)付利潤(rùn)的支付、拉平初期運(yùn)行期電價(jià)等問(wèn)題。
 
本文關(guān)鍵詞:水利水電項(xiàng)目經(jīng)濟(jì)風(fēng)險(xiǎn)的模糊分析方法,由筆耕文化傳播整理發(fā)布。
,本文編號(hào):218426
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/218426.html