  本文選題:隧洞 + 開挖。 參考:《巖土力學》2017年S1期


【摘要】:依托某供水工程輸水隧洞建立三維數(shù)值模型,采用有限差分法和Mohr-Coulomb屈服準則進行施工開挖過程的數(shù)值模擬,研究不同圍巖條件下隧洞支護時機的估算。首先,基于收斂-約束法進行隧洞開挖推進過程中的變形規(guī)律研究,分析監(jiān)測斷面的圍巖變形特征,研究發(fā)現(xiàn)圍巖位移的收斂規(guī)律與圍巖質(zhì)量相關(guān),提出隧洞縱向變形曲線的修正公式。然后,采用一步挖穿分期釋放的模擬方法,研究監(jiān)測斷面位移隨開挖荷載釋放的變化規(guī)律,以相同的位移釋放系數(shù)為出發(fā)點,構(gòu)建,開挖面推進距離與荷載釋放率之間的關(guān)系,并將對應(yīng)的圍巖位移陡增點作為施加支護的推薦時機,得出不同圍巖條件下施加支護與開挖面之間的控制距離。研究結(jié)果表明,提出的縱向變形公式相關(guān)參數(shù)確定過程簡單,擬合效果良好,推薦的支護與開挖面之間的控制距離符合工程實際規(guī)律。
[Abstract]:Based on the three-dimensional numerical model of a water conveyance tunnel in a water supply project, finite difference method and Mohr-Coulomb yield criterion are used to simulate the excavation process in order to estimate the time of tunnel support under different surrounding rock conditions. Firstly, based on the convergence-constraint method, the deformation law during tunnel excavation is studied, and the deformation characteristics of surrounding rock of monitoring section are analyzed. It is found that the convergence law of surrounding rock displacement is related to the quality of surrounding rock. The correction formula of tunnel longitudinal deformation curve is put forward. Then, the simulation method of one-step excavating and releasing by stages is used to study the law of monitoring the variation of cross-section displacement with excavation load release. Taking the same displacement release coefficient as the starting point, the relationship between the advancing distance of excavated face and the load release rate is constructed. The corresponding displacement increase point of surrounding rock is taken as the recommended time to apply support, and the control distance between supporting and excavating surface under different surrounding rock conditions is obtained. The research results show that the proposed longitudinal deformation formula is simple to determine the parameters and the fitting effect is good. The recommended control distance between support and excavating surface accords with the actual engineering law.
【作者單位】: 武漢大學水資源與水電工程科學國家重點實驗室;
【基金】:國家自然科學基金項目(No.51579194) 國家重點研發(fā)計劃(No.2016YFC0401803)~~
【分類號】:TV554

【參考文獻】

相關(guān)期刊論文 前10條

1 張常光;曾開華;;收斂約束法中隧道開挖面空間效應(yīng)方法比較[J];巖土力學;2016年05期

2 蘇凱;崔金鵬;張智敏;;隧洞施工開挖過程初次支護時機選擇方法[J];中南大學學報(自然科學版);2015年08期

3 吳順川;耿曉杰;高永濤;趙國軍;李健;嚴瓊;;基于廣義Hoek-Brown準則的隧道縱向變形曲線研究[J];巖土力學;2015年04期

4 喬麗蘋;劉杰;李術(shù)才;王者超;姜彥彥;王子豪;;地下工程開挖面空間效應(yīng)特征研究及應(yīng)用[J];巖土力學;2014年S2期

5 徐明;謝永寧;;盾構(gòu)隧道開挖三維數(shù)值模擬方法研究[J];武漢理工大學學報;2012年02期

6 楊靈;韓立軍;蔚立元;;基于虛擬支撐力的隧道合理支護時機探討分析[J];現(xiàn)代隧道技術(shù);2012年01期

7 孫元春;尚彥軍;;巖石隧道圍巖變形時空效應(yīng)分析[J];工程地質(zhì)學報;2008年02期

8 李煜,

本文編號:1944840


資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1944840.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c990a***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com