旦八1號(hào)注水站工程項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:The risk management of petroleum engineering project involves many links, departments and levels, and is a complex, comprehensive and dynamic management process. The risk management of water injection station construction project is related to the working quality and safety of water injection station, and it is an important aspect in the construction of water injection project. The construction of water injection station has the characteristics of long cycle, large investment, high technical requirements and so on. There are all kinds of unknown factors and uncertain factors in the whole complex construction process, the existence of these risk factors directly threatens the smooth implementation of the water injection station construction project, in the construction of the project, we must pay attention to the reasonable understanding of the risk factors. Analyze and evaluate, avoid and eliminate the impact and loss of risk as much as possible. On the basis of systematically introducing the general situation of the construction project of Dan VIII Water injection Station, this paper systematically analyzes the potential risk factors existing in the implementation of the project, and divides the main risk factors into social risk, economic risk and technical risk. Management risk and natural risk, and on the basis of objective actual situation and existing risk identification results, the analytic hierarchy process (AHP) is selected to evaluate the risk of the project, and the importance of risk factors is sorted according to the magnitude of risk value. The risk factors are divided into the main influencing factors and the secondary influencing factors. Then the paper puts forward the methods and measures of project risk control from the aspects of the establishment of project risk management system and the application of advanced risk management methods, including: controlling the price of material supply and the allocation of human resources in the process of project implementation. Financial control, construction change and construction quality and safety control. The key points of control are: material price, capital flow, personnel mobility, construction progress, construction quality and safety and construction cost. The executor of risk management should be fully responsible for the work of risk management, and each functional department should actively cooperate with it and formulate the corresponding responsibility system of risk management post, so that the project participants can take the initiative to participate in the risk control activities. Finally, this paper puts forward some countermeasures and suggestions to deal with the problems existing in the process of project risk management from the aspects of owners, construction and supervisors, so as to manage the project risk in an all-round way.
【學(xué)位授予單位】:西安石油大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TE357.6
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 商永濱;;標(biāo)準(zhǔn)化注水站在油田地面工程建設(shè)中的應(yīng)用[J];油氣田地面工程;2010年10期
2 雷曉偉;王春孝;;子長(zhǎng)油田降溝注水站擴(kuò)建改造可行性研究[J];內(nèi)蒙古石油化工;2011年22期
3 ;注水站的設(shè)計(jì)[J];油田設(shè)計(jì);1977年01期
4 單永年;;勝利油田1985年建成71座活動(dòng)注水站[J];油田地面工程;1986年03期
5 王剛;丁曉榮;姚海波;;注水站計(jì)算機(jī)巡控系統(tǒng)研究[J];石油規(guī)劃設(shè)計(jì);2006年03期
6 鄧麗君;;標(biāo)準(zhǔn)化注水站在油田地面工程建設(shè)中的應(yīng)用[J];中國(guó)石油和化工標(biāo)準(zhǔn)與質(zhì)量;2012年15期
7 ;執(zhí)行崗位責(zé)任制一絲不茍[J];勞動(dòng)保護(hù);1977年05期
8 黃遠(yuǎn)其;傅永山;;微機(jī)巡控裝置在大慶南五聯(lián)注水站的應(yīng)用[J];油田地面工程;1993年03期
9 尚福華,蘇桂琴,張力含;注水站最優(yōu)控制原理[J];油氣田地面工程;1998年04期
10 蒲江華;;注水站優(yōu)化運(yùn)行的現(xiàn)場(chǎng)試驗(yàn)[J];油氣田地面工程;2014年04期
相關(guān)會(huì)議論文 前2條
1 張磊;張祥友;;小注水站流程的有關(guān)問題初步探討[A];山東石油學(xué)會(huì)石油天然氣注水及水處理技術(shù)中心站油田注水及水處理技術(shù)研討會(huì)論文集[C];2008年
2 韓勇;劉立;陳東喜;馬彥峰;張皓;;穩(wěn)定性二氧化氯殺菌劑在坪四注注水站的應(yīng)用[A];山東石油學(xué)會(huì)第三屆腐蝕與防護(hù)技術(shù)學(xué)術(shù)交流會(huì)論文集[C];2005年
相關(guān)重要報(bào)紙文章 前10條
1 本報(bào)記者 陳景波 劉暢;北二注水站:那18000多天的堅(jiān)守[N];大慶日?qǐng)?bào);2012年
2 本報(bào)記者 顧威 本報(bào)通訊員 遼宣;把平凡的工作做到極致[N];工人日?qǐng)?bào);2011年
3 記者 楊文禮 通訊員 曹曉斌;聯(lián)通一條線 少建一座站[N];中國(guó)石油報(bào);2014年
4 本報(bào)記者 劉國(guó)安 本報(bào)通訊員 武本凡;異崗交流效應(yīng)[N];中國(guó)石油報(bào);2000年
5 本報(bào)記者 王金法 通訊員 任育;“水滴文化”:名牌隊(duì)的秘密武器[N];中國(guó)石化報(bào);2006年
6 通訊員 張浩;老區(qū)改造重點(diǎn)項(xiàng)目 投產(chǎn)連頭一次成功[N];大慶日?qǐng)?bào);2010年
7 記者 王志田邋通訊員 趙慶梅;應(yīng)用新技術(shù)節(jié)能效果明顯[N];中國(guó)石油報(bào);2007年
8 記者 王志田 通訊員 孫超;注水站改用伴生氣成本降7成[N];中國(guó)石油報(bào);2006年
9 馮永江;三級(jí)聯(lián)動(dòng)保高效平穩(wěn)注水[N];中國(guó)石化報(bào);2010年
10 特約記者 王吉超邋呂茂生;投資40萬元治理注水崗噪音[N];中國(guó)石油報(bào);2008年
相關(guān)碩士學(xué)位論文 前9條
1 陶明東;QWP注水站項(xiàng)目建設(shè)后經(jīng)濟(jì)評(píng)價(jià)研究[D];西安石油大學(xué);2015年
2 王剛;長(zhǎng)慶油田化六注水站建設(shè)項(xiàng)目質(zhì)量管理研究[D];西安石油大學(xué);2015年
3 張輝;旦八1號(hào)注水站工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];西安石油大學(xué);2015年
4 邢明明;永寧雙896注水站建設(shè)工程項(xiàng)目質(zhì)量控制研究[D];西安石油大學(xué);2014年
5 高慧;南泥灣采油廠注水站修建項(xiàng)目風(fēng)險(xiǎn)管理研究[D];西安石油大學(xué);2014年
6 郭哲;注水站庫數(shù)據(jù)采集監(jiān)控系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[D];北京理工大學(xué);2014年
7 朱成斌;延長(zhǎng)油田注水站工程項(xiàng)目施工質(zhì)量控制研究[D];西安石油大學(xué);2014年
8 程巖;永寧采油廠注水站滑坡治理工程優(yōu)化設(shè)計(jì)研究[D];長(zhǎng)安大學(xué);2014年
9 杜會(huì)俠;中原油田注水站系統(tǒng)優(yōu)化技術(shù)研究與應(yīng)用[D];西安石油大學(xué);2012年
,本文編號(hào):2495390
本文鏈接:http://www.sikaile.net/kejilunwen/shiyounenyuanlunwen/2495390.html