新型JC70DB交流變頻絞車(chē)的設(shè)計(jì)與研制
[Abstract]:Winch is one of the eight core parts of the drilling rig. During drilling, the winch is not only responsible for drilling tools, casing, controlling drilling pressure, handling downhole accidents, extracting core tubes, oil testing and other operations, but also supporting on land drilling rigs. It is also responsible for the lifting and setting-up of the Derrick and the pedestal. The new type of 7000 meter AC frequency conversion double-gear winch is designed to meet the requirements of 7000-meter well deep drilling in complicated environment such as ocean, desert and mountain area. The winch has the advantages of simple operation, compact structure, convenient maintenance, large market demand and broad prospect. This paper analyzes and studies the general situation of the design and manufacture of the winch both at home and abroad at present. Combined with the daily use needs and customer requirements of the rig winch, the purpose of this paper is to design and develop a drilling rig winch with simple operation, compact structure and convenient maintenance. In this paper, JC70DB two-gear winch is designed as a whole, single axle. Two high-speed, wide-frequency, high-torque AC frequency conversion motors are connected by ball-cage universal coupling and double reducer, and the roller shaft is driven by two-gear helical gear reducer. The main brake adopts double-disc air-cooled hydraulic disc brake, which is combined with the motor energy consumption brake. The braking torque is obtained by the electric control system of the drilling rig to achieve zero-speed hovering. In addition, at the other end of the input side of the reducer of the winch, a 45kW AC variable frequency motor is used to drive the gearbox through the clutch, so that the automatic drilling can be realized and the maximum weight of the drill string can be lifted in emergency. The JC70DB winch is mainly driven by the roller shaft. Left and right gearbox, motor, sliding cage constant speed universal coupling, automatic drilling device, winch, lubrication system, etc. The whole structure of winch is compact and easy to install and maintain.
【學(xué)位授予單位】:東北石油大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:TE92
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 韓華,盧海標(biāo);提升絞車(chē)滾筒的解體方法[J];江蘇煤炭;2001年02期
2 鄭巧;胡衛(wèi)東;;絞車(chē)模擬操作臺(tái)設(shè)計(jì)[J];石油機(jī)械;2010年07期
3 Richard N.Cordrey;周惟英;; 絞車(chē)鉆深能力的確定和應(yīng)用[J];石油礦場(chǎng)機(jī)械;1981年01期
4 錢(qián)月倫;礦井1.2~1.6m絞車(chē)防爆改造初探[J];江蘇煤炭;1989年04期
5 劉忠義;;發(fā)展防爆絞車(chē)和卷筒加寬提升機(jī)探討[J];礦山機(jī)械;1989年05期
6 崔秋玲,陳志新;鑿井用長(zhǎng)繩懸吊抓巖機(jī)絞車(chē)過(guò)卷保護(hù)的改進(jìn)[J];煤礦安全;1992年03期
7 崔秋玲;陳志新;;鑿井抓巖機(jī)絞車(chē)過(guò)卷保護(hù)的改進(jìn)[J];礦山機(jī)械;1992年11期
8 龔鈺晟;滕青;吳占陽(yáng);;大功率變頻絞車(chē)的檔位設(shè)置[J];船舶工程;2013年S2期
9 張玉甫,陳恩堯,周奇純,郝駿;JC30新型石油鉆井絞車(chē)總體方案研究[J];石油礦場(chǎng)機(jī)械;2004年05期
10 閔付松;李炳文;王海燕;;新型運(yùn)輸絞車(chē)的設(shè)計(jì)[J];煤礦機(jī)械;2007年09期
相關(guān)會(huì)議論文 前8條
1 巴川;;絞車(chē)滾筒部分更換工藝分析[A];礦山建設(shè)工程技術(shù)新進(jìn)展——2008全國(guó)礦山建設(shè)學(xué)術(shù)會(huì)議文集(下)[C];2008年
2 付艷霞;王如杰;楊林波;黃海龍;;降低撬裝鉆機(jī)絞車(chē)不合格率[A];第七屆河南省汽車(chē)工程科技學(xué)術(shù)研討會(huì)論文集[C];2010年
3 傅明君;祝秋華;張加鋒;;交流變頻的發(fā)展及在起重機(jī)上的應(yīng)用[A];第二屆水電工程施工系統(tǒng)與工程裝備技術(shù)交流會(huì)論文集(上)[C];2010年
4 陳伯時(shí);;交流變頻傳動(dòng)控制的發(fā)展[A];第一屆變頻器與伺服企業(yè)論壇論文集[C];2003年
5 甘朝暉;陳夏光;廖雪超;;交流變頻矢量控制技術(shù)在高爐探尺系統(tǒng)中的應(yīng)用[A];冶金軋制過(guò)程自動(dòng)化技術(shù)交流會(huì)論文集[C];2005年
6 張玉平;馬永剛;;交流變頻矢量控制技術(shù)在高爐探尺系統(tǒng)中的應(yīng)用[A];河北冶金學(xué)會(huì)煉鐵技術(shù)暨學(xué)術(shù)年會(huì)論文集[C];2006年
7 王清;;1800m~3高爐布料溜槽交流變頻的改造與實(shí)踐[A];全國(guó)冶金自動(dòng)化信息網(wǎng)2009年會(huì)論文集[C];2009年
8 吳瑞金;趙旭平;王冬梅;;交流變頻電動(dòng)橇裝鉆機(jī)總體方案探討[A];2005年石油裝備技術(shù)發(fā)展學(xué)術(shù)交流年會(huì)論文集[C];2005年
相關(guān)重要報(bào)紙文章 前7條
1 本報(bào)通訊員 李慶偉邋張懷標(biāo);煤!吧襻t(yī)”劉志法[N];河南日?qǐng)?bào);2008年
2 廖選勇;長(zhǎng)河煤電絞車(chē)自動(dòng)加油安全裝置試驗(yàn)成功[N];經(jīng)理日?qǐng)?bào);2008年
3 劉衛(wèi)兵;衛(wèi)華集團(tuán)新品起重機(jī)通過(guò)鑒定[N];現(xiàn)代物流報(bào);2008年
4 潘才奎;國(guó)內(nèi)新型交流變頻系列鉆機(jī)在“寶石”研制成功[N];中國(guó)高新技術(shù)產(chǎn)業(yè)導(dǎo)報(bào);2004年
5 權(quán)太峰 王穎 郭芳;國(guó)內(nèi)新型交流變頻系列鉆機(jī)在“寶石”研制成功[N];經(jīng)理日?qǐng)?bào);2004年
6 張衛(wèi)民;交流變頻傳動(dòng)技術(shù)的發(fā)展及應(yīng)用[N];中國(guó)建材報(bào);2004年
7 ;寶雞研制成功新型交流變頻鉆機(jī)[N];今日信息報(bào);2004年
相關(guān)博士學(xué)位論文 前1條
1 戴相富;石油系列絞車(chē)模塊化設(shè)計(jì)與仿真研究[D];中國(guó)石油大學(xué);2009年
相關(guān)碩士學(xué)位論文 前10條
1 黃博文;JC50L-3絞車(chē)傳動(dòng)系統(tǒng)的動(dòng)力學(xué)分析及控制研究[D];揚(yáng)州大學(xué);2016年
2 糾松濤;JC150DB鉆機(jī)絞車(chē)的設(shè)計(jì)研究[D];西南石油大學(xué);2017年
3 劉天浪;作業(yè)絞車(chē)液壓傳動(dòng)系統(tǒng)設(shè)計(jì)與分析[D];大慶石油學(xué)院;2007年
4 李睿明;海洋平臺(tái)9000米絞車(chē)的技術(shù)和研究[D];東北石油大學(xué);2013年
5 楊明旺;石油系列絞車(chē)的數(shù)值分析與可靠性研究[D];中國(guó)石油大學(xué);2007年
6 周海領(lǐng);JC50DB型絞車(chē)傳動(dòng)系統(tǒng)結(jié)構(gòu)的設(shè)計(jì)研究[D];蘭州理工大學(xué);2011年
7 王定亞;3000馬力電驅(qū)動(dòng)齒輪傳動(dòng)絞車(chē)設(shè)計(jì)研究[D];西南石油學(xué)院;2003年
8 梁建成;ZJ40/2250LDB鉆機(jī)絞車(chē)設(shè)計(jì)計(jì)算[D];中國(guó)石油大學(xué);2009年
9 郝志宏;鉆井絞車(chē)開(kāi)槽滾筒加工工藝研究及數(shù)控程序開(kāi)發(fā)[D];東北石油大學(xué);2013年
10 林葦;超深井鉆機(jī)絞車(chē)起升系統(tǒng)研究[D];吉林大學(xué);2013年
,本文編號(hào):2463780
本文鏈接:http://www.sikaile.net/kejilunwen/shiyounenyuanlunwen/2463780.html