【摘要】:項(xiàng)目后評(píng)價(jià)工作在整個(gè)項(xiàng)目周期中占據(jù)著重要的位置,國(guó)內(nèi)各行業(yè)對(duì)項(xiàng)目后評(píng)價(jià)工作越來(lái)越重視,不斷加強(qiáng)項(xiàng)目后評(píng)價(jià)理論方法的研究和應(yīng)用。2004年底,中國(guó)石油天然氣集團(tuán)公司為提高慶鐵線擴(kuò)能改造項(xiàng)目的項(xiàng)目管理水平和投資收益,提出了開(kāi)展項(xiàng)目后評(píng)價(jià)工作的要求。但是在當(dāng)前的石油企業(yè)中,很多企業(yè)開(kāi)展的項(xiàng)目后評(píng)價(jià)工作都是簡(jiǎn)化后評(píng)價(jià),沒(méi)有對(duì)項(xiàng)目進(jìn)行深入分析評(píng)價(jià)。本文旨在以慶鐵線擴(kuò)能安全改造工程為例,首先構(gòu)建一套完整的慶鐵線擴(kuò)能安全改造工程后評(píng)價(jià)指標(biāo)體系,然后對(duì)慶鐵線擴(kuò)能安全改造工程開(kāi)展詳細(xì)后評(píng)價(jià),發(fā)現(xiàn)問(wèn)題,為后期管道建設(shè)工程提供借鑒。在對(duì)項(xiàng)目后評(píng)價(jià)工作相關(guān)理論進(jìn)行深入研究的基礎(chǔ)上,結(jié)合慶鐵線擴(kuò)能安全改造工程的實(shí)際情況,本文構(gòu)建了慶鐵線擴(kuò)能安全改造工程后評(píng)價(jià)指標(biāo)體系。在該套項(xiàng)目后評(píng)價(jià)指標(biāo)體系中,設(shè)定了前期工作、建設(shè)實(shí)施、生產(chǎn)運(yùn)行、投資與財(cái)務(wù)效益、影響與持續(xù)性五個(gè)一級(jí)評(píng)價(jià)指標(biāo),每一個(gè)一級(jí)評(píng)價(jià)指標(biāo)下又設(shè)立了多項(xiàng)二級(jí)評(píng)價(jià)指標(biāo),通過(guò)利用層次分析法確定了各指標(biāo)的權(quán)重。以構(gòu)建的慶鐵線擴(kuò)能安全改造工程后評(píng)價(jià)指標(biāo)體系為依據(jù),本文對(duì)慶鐵線擴(kuò)能安全改造工程進(jìn)行了詳細(xì)后評(píng)價(jià),并利用成功度模糊綜合評(píng)價(jià)法對(duì)慶鐵線擴(kuò)能安全改造工程進(jìn)行了綜合后評(píng)價(jià)。通過(guò)對(duì)后評(píng)價(jià)結(jié)果的分析,總結(jié)慶鐵線擴(kuò)能安全改造工程開(kāi)發(fā)、建設(shè)、運(yùn)營(yíng)過(guò)程中存在的諸多問(wèn)題,提煉出有代表性的問(wèn)題,為后期管道工程的建設(shè)提供借鑒,從而提高管道工程的投資收益。
[Abstract]:Post-project evaluation occupies an important position in the whole project cycle. The domestic industries pay more and more attention to the post-project evaluation, and strengthen the research and application of the theory and method of post-project evaluation. In order to improve the project management level and investment income of the project, CNPC put forward the requirements of post-project evaluation. However, in the current petroleum enterprises, many enterprises carry out the post-project evaluation work is simplified post-evaluation, there is no in-depth analysis and evaluation of the project. The purpose of this paper is to set up a complete evaluation index system of Qingtie railway line expansion safety reconstruction project, and then to carry out detailed post-evaluation and find out the problems, taking the Qingqing railway line capacity expansion safety reconstruction project as an example. It can be used for reference in the later stage of pipeline construction. On the basis of deep research on the relevant theory of post-evaluation work, combined with the actual situation of the QingyingRailway line capacity expansion and reconstruction project, this paper constructs the post-evaluation index system of the QingyingRailway line expansion safety reconstruction project. In the post-evaluation index system of the project, five primary evaluation indexes, namely, pre-work, construction implementation, production operation, investment and financial benefit, impact and sustainability, are set. Several secondary evaluation indexes are set up under each evaluation index, and the weight of each index is determined by using the analytic hierarchy process (AHP). Based on the post-evaluation index system of Qingtie railway line capacity expansion and reconstruction project, this paper makes a detailed post evaluation on the Qingtie railway line expansion safety reconstruction project. The fuzzy comprehensive evaluation method of degree of success is applied to the comprehensive post-evaluation of the project of capacity expansion and reconstruction of Qing-tie railway line. Based on the analysis of the post-evaluation results, this paper summarizes the problems existing in the development, construction and operation of the Qingqing Railway Line's capacity expansion and transformation project, extracts the representative problems, and provides a reference for the later construction of pipeline engineering. Thus, the investment income of pipeline engineering is improved.
【學(xué)位授予單位】:中國(guó)石油大學(xué)(華東)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TE973

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 段云龍;周靜斌;申曉靜;;基于熵權(quán)TOPSIS法的房地產(chǎn)項(xiàng)目后評(píng)價(jià)模型研究[J];項(xiàng)目管理技術(shù);2011年09期

2 孫慧;范志清;孫曉鵬;;基于模糊綜合評(píng)價(jià)的BOT高速公路建設(shè)項(xiàng)目后評(píng)價(jià)[J];統(tǒng)計(jì)與決策;2011年04期

3 牛東曉;李建青;;基于物元可拓模型的火電廠建設(shè)項(xiàng)目過(guò)程后評(píng)價(jià)研究[J];華北電力大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年06期

4 高軍;高穎;;對(duì)成品油銷(xiāo)售網(wǎng)絡(luò)投資項(xiàng)目后評(píng)價(jià)指標(biāo)體系構(gòu)建的探討[J];國(guó)際石油經(jīng)濟(jì);2010年07期

5 方興君;趙連增;杜敏;高軍;丁世強(qiáng);;對(duì)改進(jìn)投資項(xiàng)目后評(píng)價(jià)方法體系的探討[J];國(guó)際石油經(jīng)濟(jì);2010年04期

6 黃旭楠;李華啟;王錫柱;;油氣勘探項(xiàng)目后評(píng)價(jià)指標(biāo)體系與定量化評(píng)價(jià)[J];國(guó)際石油經(jīng)濟(jì);2010年01期

7 杜靜;;對(duì)汶川震后恢復(fù)重建項(xiàng)目后評(píng)價(jià)工作的探討[J];科技進(jìn)步與對(duì)策;2009年21期

8 關(guān)永;蹇瑞紅;劉景武;;項(xiàng)目后評(píng)價(jià)工作實(shí)踐探討[J];當(dāng)代化工;2009年03期

9 丁海潮;陳惠玲;管殿聆;張偉;;城市基礎(chǔ)設(shè)施建設(shè)項(xiàng)目施工階段后評(píng)價(jià)及案例分析[J];建筑經(jīng)濟(jì);2009年04期

10 王尊先;;基于成功度綜合評(píng)價(jià)模型的水電工程施工后評(píng)價(jià)[J];南水北調(diào)與水利科技;2008年05期

相關(guān)博士學(xué)位論文 前1條

1 楊文升;油氣田產(chǎn)能建設(shè)項(xiàng)目后評(píng)價(jià)研究[D];哈爾濱工程大學(xué);2009年

相關(guān)碩士學(xué)位論文 前5條

1 張程;東北電力市場(chǎng)試點(diǎn)項(xiàng)目的后評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2010年

2 王寶光;LB地區(qū)原油勘探項(xiàng)目技術(shù)經(jīng)濟(jì)后評(píng)價(jià)研究[D];吉林大學(xué);2010年

3 高芳;中石大青島校區(qū)一期工程建設(shè)項(xiàng)目后評(píng)價(jià)研究[D];中國(guó)石油大學(xué);2009年

4 文俊;青龍路加油站工程建設(shè)項(xiàng)目后評(píng)價(jià)[D];重慶大學(xué);2008年

5 趙雪;高速公路項(xiàng)目過(guò)程后評(píng)價(jià)研究及應(yīng)用[D];南京航空航天大學(xué);2007年

,

本文編號(hào):2331991

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/shiyounenyuanlunwen/2331991.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶35ec6***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com