石油修井破碎地錨機(jī)的研制
[Abstract]:In the process of using workover, it is often necessary to carry on the ground anchor operation, and the equipment that completes this work is the ground anchor machine. During the workover operation, the Derrick needs to bear the full weight of the pipe string and drilling tools in the well, and when the Derrick is erected because of the small base area, the Derrick height is above 18 meters and the height is higher, if there is no fixing device to fix the Derrick, The Derrick will fall, so it is necessary to tie the anchor with the ground, so that the Derrick is set up at a certain angle to the head of the well, and the part connected with the ground is called the anchor. The freezing time of Liaohe oil field is 4 months per year, and many wells are covered with large stones. The original anchor machine can not break the frozen soil layer in winter, but needs manual pneumatic pick to break the frozen soil layer. It is necessary to excavate large blocks of rock by hand, which has the advantages of high labor intensity and low efficiency. Therefore, a broken ground anchor machine is developed for the above reasons. According to the Dongfeng truck as the carrier and the excavator rotary mode, the anchor bit can rotate 360 degrees in this area, thus expanding the scope of construction. This paper mainly discusses the whole structure of the oil workover ground anchor, according to the design requirements, complete the overall scheme design of the crushing ground anchor, determine the structure and size of the main parts, and carry out simulation modeling and force analysis of the main parts. And use AutoCAD software to draw its main parts and assembly drawing. Finally, the parts and components are processed, manufactured and assembled in the machining workshop and riveting workshop, and the technical requirements for the field operation of the ground anchor machine are carried out. Finally, the field use test of the local anchor machine is carried out.
【學(xué)位授予單位】:東北石油大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TE935
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李劍鋒;新一代鉆裝錨機(jī)組誕生[J];有色金屬(礦山部分);1997年05期
2 徐鎖庚;;國(guó)內(nèi)外掘錨機(jī)組的現(xiàn)狀及發(fā)展趨勢(shì)[J];煤礦機(jī)械;2006年10期
3 平靜;齊遠(yuǎn)智;;退錨機(jī)增壓設(shè)計(jì)[J];中小企業(yè)管理與科技(下旬刊);2011年05期
4 徐鎖庚;;國(guó)內(nèi)外掘錨機(jī)組的現(xiàn)狀及發(fā)展趨勢(shì)[J];鑿巖機(jī)械氣動(dòng)工具;2008年03期
5 姚玉煌,劉會(huì)文;12—20m~2液壓鉆裝錨機(jī)組及其作業(yè)線(xiàn)施工分析[J];江蘇煤炭;1990年04期
6 張勇;;寸草塔煤礦掘錨機(jī)雙巷掘進(jìn)工藝淺析[J];陜西煤炭;2014年02期
7 魏蒼棟;焦敬榜;;新型掘錨機(jī)的研制及應(yīng)用[J];科技資訊;2008年15期
8 伍光東;萬(wàn)學(xué)鋒;;掘錨機(jī)組在羊場(chǎng)灣煤礦的應(yīng)用實(shí)踐[J];煤炭工程;2009年07期
9 馬洪峰;王峗;;掘錨機(jī)后配套形式[J];煤礦機(jī)械;2009年01期
10 ;EBZ160-JM11掘錨機(jī)出廠(chǎng)評(píng)議意見(jiàn)[J];煤礦機(jī)械;2006年12期
相關(guān)會(huì)議論文 前1條
1 吳臻;;由兩起錨泊作業(yè)引發(fā)的一些思考[A];2008船舶安全管理論文集[C];2008年
相關(guān)重要報(bào)紙文章 前2條
1 記者 周升友;以新產(chǎn)品搶占市場(chǎng)制高點(diǎn)[N];中國(guó)船舶報(bào);2003年
2 劉林黃 莉忠華;潤(rùn)達(dá)新型煤礦用鉆裝錨機(jī)組問(wèn)世[N];中國(guó)工業(yè)報(bào);2009年
相關(guān)碩士學(xué)位論文 前4條
1 張東亮;石油修井破碎地錨機(jī)的研制[D];東北石油大學(xué);2015年
2 劉鎏;錨機(jī)支撐結(jié)構(gòu)設(shè)計(jì)方法研究[D];大連理工大學(xué);2013年
3 汪建波;船舶錨機(jī)液壓集成塊設(shè)計(jì)研究[D];大連海事大學(xué);2010年
4 林恩靈;漁船錨機(jī)可視化遠(yuǎn)程控制系統(tǒng)設(shè)計(jì)[D];浙江海洋學(xué)院;2013年
,本文編號(hào):2272239
本文鏈接:http://www.sikaile.net/kejilunwen/shiyounenyuanlunwen/2272239.html