淄博齊悅國際城項(xiàng)目建設(shè)質(zhì)量管理研究
[Abstract]:With the economic development of our country, the quality of life of the people is improving constantly, and the requirement of the quality of residence is higher and higher. Therefore, it is of great theoretical and practical significance to deeply study how to provide high quality residential buildings for people to live in, so as to maintain the safety of people's life and property and the reputation and economic benefits of the construction enterprises themselves. Zibo Qiyue International City project as a typical residential building construction project, with the deepening of the construction process, the quality management of the project in construction operations exposed some problems that can not be ignored. The analysis of the project quality management of Zibo Qiyue International Residential Building is helpful to study and solve the problems existing in the current project construction quality management, and is also helpful to solve the problems existing in the current domestic construction project quality management. From the view of the construction quality management of Zibo Qiyue International City residential building project, the construction unit has done a lot of basic work. A quality management responsibility system has been established within the construction enterprise, including the general manager of the enterprise, the deputy general manager in charge of quality management, the technical person in charge of the project, and through the quality supervision department set up by the company, The supervision organization of quality management has been established by the full-time quality inspector of the project department. In addition, a set of quality management process and the reward and punishment mechanism of quality management have also been established. However, in the construction process of each link of the project, because of the weak consciousness of quality management, the phenomenon of violating the regulation of quality management occurs from time to time. From the point of view of the construction staff, the overall quality of the construction team is on the low side, and the level of the management personnel is mixed, so they cannot be managed according to the construction standards. In terms of the management and use of construction materials, individual materials are not purchased and inspected in accordance with the design requirements, and there is also an inappropriate place for the storage and use of construction materials. The materials are mixed and stacked, and the materials are liable to misuse. The change of strength and stiffness of engineering entity. From the point of view of construction machinery management, mechanical equipment is old and out of service, which results in the deterioration of mechanical performance, which affects the quality of engineering. At the same time, the lack of reasonable configuration, construction machinery and equipment combined operation efficiency is not ideal. From the point of view of construction method, the technological innovation of enterprises is not enough at present, the exploration of new technology is still lagging behind, and simple quality problems can not be solved well. Based on the analysis of the existing problems and their causes in Zibo Qiyue International City Residential Building Project, this paper puts forward some measures to further strengthen the construction quality management of the project. These measures mainly include strengthening the management of construction personnel and establishing a perfect incentive system. Strengthen the quality management of construction materials, strengthen the management of construction equipment, strengthen the quality management of key construction procedures, etc. These measures can guarantee the construction quality of the project and provide some reference for the construction quality management in the future.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU712.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 楊富春;;建筑施工項(xiàng)目質(zhì)量管理研究[J];經(jīng)營管理者;2009年15期
2 吳姜浩;;論施工企業(yè)如何加強(qiáng)質(zhì)量管理[J];山西建筑;2008年33期
3 李志民;;建筑施工項(xiàng)目質(zhì)量保證體系建立的研究[J];科技經(jīng)濟(jì)市場;2006年05期
4 寧連旺;;淺談建設(shè)工程項(xiàng)目質(zhì)量管理[J];科技情報(bào)開發(fā)與經(jīng)濟(jì);2007年05期
5 賈桂榮;;淺談工程項(xiàng)目質(zhì)量管理[J];遼寧師專學(xué)報(bào)(自然科學(xué)版);2006年01期
6 沈良峰,李啟明;層次分析法(AHP)在建筑工程項(xiàng)目評標(biāo)中的應(yīng)用[J];施工技術(shù);2005年02期
7 劉萬里,雷治軍;關(guān)于AHP中判斷矩陣校正方法的研究[J];系統(tǒng)工程理論與實(shí)踐;1997年06期
8 黎娟;;工程項(xiàng)目質(zhì)量管理現(xiàn)狀及對策[J];科技咨詢導(dǎo)報(bào);2007年16期
9 李芳;;工程項(xiàng)目建設(shè)過程中的質(zhì)量控制方法初探[J];中小企業(yè)管理與科技(下旬刊);2010年03期
相關(guān)碩士學(xué)位論文 前2條
1 楊軍峰;即墨市實(shí)驗(yàn)高級中學(xué)建設(shè)項(xiàng)目質(zhì)量管理體系研究[D];哈爾濱工程大學(xué);2010年
2 董國安;康城春天里項(xiàng)目質(zhì)量管理現(xiàn)狀分析及改進(jìn)對策研究[D];吉林大學(xué);2011年
,本文編號:2403420
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/2403420.html