相鄰雙基坑開挖相互影響性狀分析
[Abstract]:Because of the high density of high-rise buildings in urban areas, it is easy to cause intensive foundation pit construction, so it is inevitable that two or more foundation pits will be excavated in the same period. There is great difference between the deformation of surrounding soil and the deformation of surrounding soil caused by adjacent excavation. In the design and construction of foundation pit, the mutual influence caused by adjacent excavation must be considered, and the influence factors are the spacing of adjacent foundation pit. Excavation sequence and support method etc. Due to the mutual influence of adjacent excavation, the force, deformation and surrounding environment of the supporting structure become more complex. In this paper, the excavation behavior of adjacent foundation pit is studied by using finite element software to establish two-dimensional and three-dimensional calculation and analysis models, taking the excavation of the tea pavilion and the Shimao International Center foundation pit as the research object, and using the finite element software to establish the two-dimensional and three-dimensional calculation and analysis models. The main contents are as follows: the two-dimensional model of adjacent excavation is established by using finite element software PLAXIS, and the HS constitutive model is used to analyze the displacement of soil mass, displacement of supporting structure and internal force under the condition of synchronous excavation of adjacent foundation pit. Considering the influence of different spacing and different excavation procedure on the behavior of adjacent foundation pit excavation, the influence range of adjacent foundation pit excavation and the deformation law of foundation pit enclosure structure under different excavation procedures are obtained. The strength reduction method is used to analyze the stability of foundation pit, and the two-dimensional model of adjacent foundation pit excavation is established by using finite element software Phase2. The failure mode of foundation pit is judged according to the calculated displacement shear band. The influences of excavation depth, foundation pit spacing, bolt length, embedded depth of supporting pile, soil strength, supporting method and thickness of soft soil layer on the stability are analyzed in detail. The stress path and rotation of the principal stress axis of soil around the foundation pit during the excavation of adjacent foundation pit are studied, and the rotation of the soil stress path and principal stress axis in the construction area of anchor rod, the active zone in front of the wall and the passive zone behind the wall are analyzed in detail. The soil stress path and rotation rule of principal stress axis in the zone affected by pit and adjacent foundation pit are obtained. The three-dimensional model of adjacent foundation pit excavation is established by using finite element software PLAXIS 3D, and the behavior of adjacent foundation pit excavation under synchronous excavation and different spacing is analyzed, and the influence of corner stiffness effect on excavation behavior is studied. Considering the spatial effect of foundation pit, the result of 3D analysis is closer to reality.
【學位授予單位】:福州大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:TU753
【相似文獻】
相關期刊論文 前10條
1 劉兵;葉敬彬;余曉琳;顏全勝;;基坑開挖對鄰近地鐵影響的計算分析[J];科學技術與工程;2009年23期
2 張雪松;童博;羅天;;連續(xù)基坑開挖對相鄰基坑的變形影響分析[J];廣州大學學報(自然科學版);2012年02期
3 韓玲;土耳其正在進行奇內(nèi)壩基坑開挖[J];水利水電快報;2000年18期
4 梁崗,曹志遠,徐旭;地下工程中基坑開挖施工三維非線性時變計算分析[J];上海大學學報(自然科學版);2001年02期
5 王建勇,孟繁鋒,袁英奇;深基坑開挖采用鋼鈑樁圍堰防護施工的探討[J];西部探礦工程;2001年04期
6 王生力,韓振富,劉唐生,裘平一;基坑開挖圍護設計實例分析及問題探討[J];工程勘察;2003年04期
7 姚念光 ,張良友 ,吳勝軍;寒區(qū)適用的建筑物基坑開挖方法[J];水利天地;2003年09期
8 陳文海;南京河西某大型深基坑開挖與支護技術[J];江蘇建筑;2004年01期
9 滕玉龍;高水位砂礫基坑開挖技術應用[J];甘肅科技;2004年05期
10 朱奎;仇樂民;吳冬虎;;深基坑開挖對鄰近建筑物影響規(guī)律分析[J];工程勘察;2004年06期
相關會議論文 前10條
1 黃明;趙廣強;;某基坑開挖對相鄰高層建筑的影響分析[A];第九屆全國現(xiàn)代結(jié)構工程學術研討會論文集[C];2009年
2 侯悅琪;王建華;;基坑開挖對已有建筑影響分析[A];2010’力學與工程應用學術研討會論文集[C];2010年
3 曾遠;李志高;王毅斌;;基坑開挖對鄰近地鐵車站影響因素研究[A];上海軟土地深基坑技術新進展研討會論文集[C];2005年
4 武法偉;李方明;;基坑開挖與降水引起的周邊地表沉降變形耦合計算[A];第九屆全國工程地質(zhì)大會論文集[C];2012年
5 譚曉恒;徐曉東;;河南省地質(zhì)工程公司辦公樓 深基坑開挖及支護簡述[A];河南省土木建筑學會2010年學術研討會論文集[C];2010年
6 陳觀勝;陳雪仙;鄭旭晨;;深基坑開挖對周圍建筑物的保護施工實踐[A];中國土木工程學會市政工程分會2000年學術年會論文集[C];2000年
7 丁銳;范鵬;焦蒼;徐成家;張文強;;建筑物受深基坑開挖影響的顯式差分分析[A];2005全國地鐵與地下工程技術風險管理研討會論文集[C];2005年
8 陸培炎;曹洪;楊光華;李思平;熊麗珍;陳曉文;方大勇;;廣東深基坑開挖工程實例[A];陸培炎科技著作及論文選集[C];2006年
9 嚴平;龔曉南;李建新;;軟土地基中深基坑開挖圍護的工程實踐[A];中國土木工程學會土力學及基礎工程學會地基處理學術委員會第四屆地基處理學術討論會論文集[C];1995年
10 陳郁;張冬梅;;基坑開挖對下臥隧道隆起的實測影響分析[A];全國城市地下空間學術交流會論文集[C];2004年
相關重要報紙文章 前8條
1 宋政琳邋鄧繼明;南京地鐵河定橋站基坑開挖方案通過論證[N];人民鐵道;2007年
2 張阿五 姚百祥 周長標;嘉興市國際中港城超大型基坑開挖探討[N];中國建設報;2005年
3 本報記者 馮tD 通訊員 徐昭;挑戰(zhàn)“世界難題”[N];寧波日報;2010年
4 符能江 陸文忠;科學施工為潮州供水樞紐工程開路[N];中國水利報;2005年
5 記者 龍舟 和光亞;昆明地鐵3號線開建[N];云南日報;2011年
6 記者 張遙;杭州樓降降 車過樓晃晃[N];新華每日電訊;2010年
7 張曉宏;福田車站:混合型樞紐的挑戰(zhàn)[N];國際商報;2009年
8 馮tD 徐昭 鄧明軍 張繪薇;千丘萬壑春風暖[N];寧波日報;2010年
相關博士學位論文 前8條
1 魏少偉;基坑開挖對坑底已建隧道影響的數(shù)值與離心試驗研究[D];天津大學;2010年
2 馬石城;基坑開挖的彈塑性與流變分析及其應用[D];湖南大學;2001年
3 秦昊;地鐵車站基坑開挖對鄰近地下管線的影響研究[D];中國地質(zhì)大學(北京);2010年
4 宗金輝;深基坑開挖有限元模擬及現(xiàn)場實測研究[D];天津大學;2006年
5 倪才勝;基坑開挖滲流研究及其工程應用[D];中國科學院研究生院(武漢巖土力學研究所);2008年
6 張春會;基坑開挖的數(shù)值模擬及土體本構模型和參數(shù)反演研究[D];中國海洋大學;2007年
7 俞曉;深基坑開挖與支護的模型試驗與ANSYS分析研究[D];武漢理工大學;2005年
8 丁江澍;城市地下結(jié)構施工對鄰近構筑物影響的研究[D];長安大學;2013年
相關碩士學位論文 前10條
1 陸琰;明挖聯(lián)絡通道對既有車站結(jié)構影響分析研究[D];中國地質(zhì)大學(北京);2015年
2 李國龍;基坑開挖對鄰近既有隧道的影響分析[D];青島理工大學;2015年
3 卜佳;基坑開挖對既有地鐵隧道的變形影響研究[D];中國地質(zhì)大學(北京);2015年
4 閆興寶;復雜地層條件下深基坑施工對下臥地鐵隧道結(jié)構影響研究[D];長安大學;2015年
5 賈銀虎;基坑開挖變形數(shù)值模擬研究[D];河北工程大學;2015年
6 趙笑男;深基坑開挖對鄰近既有地鐵隧道影響規(guī)律研究[D];西安建筑科技大學;2015年
7 孫自強;合肥地鐵6號風井開挖對鄰近高速公路的影響[D];安徽建筑大學;2015年
8 林鍵;合肥地鐵西園路基坑開挖對鄰近地下管線的影響分析[D];安徽建筑大學;2015年
9 劉波;復雜條件下偏壓基坑開挖效應分析[D];安徽建筑大學;2015年
10 傅勤安;濱湖新區(qū)軟土基坑內(nèi)撐式排樁支護有限元分析及地面最大沉降預測[D];安徽建筑大學;2015年
,本文編號:2399400
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/2399400.html