天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 施工技術論文 >

工程建設報建階段進度控制研究

發(fā)布時間:2018-11-01 13:35
【摘要】:隨著我國經(jīng)濟建設的高速發(fā)展,建設工程類項目如何有效管理,使建設項目在運用新型科學技術的前提下,真正做到維護民生、統(tǒng)一城市規(guī)劃以及自然資源可持續(xù)循環(huán)利用。這些正是國家和人民群眾所關心的重大問題。 目前,建設部對建筑工程等類似項目頒布了相應的管理條例。同時當?shù)卣墙Y合了當?shù)氐木唧w情況,對建設工程的各環(huán)節(jié)項目制定出更為細致的規(guī)定,便于有效地開展工程報建工作,及時完成建設工程前期報建手續(xù)。其中施工許可證的順利取得正是保證按時完成建設工程項目的重要環(huán)節(jié)。 本文通過具體分析研究在建設工程項目前期報建階時段所產(chǎn)生的各種問題,并利用項目管理中工作分解結構、關鍵路徑法、網(wǎng)絡圖法等方法,將報建階段的工作進行梳理總結,從而創(chuàng)建出3W模型。 本文創(chuàng)建的3W模型,通過將報建階段中的具體工作分成三個方面:設計、招標、審批工作內(nèi)容,進行工作分解,資源分配,項目進度安排,得出項目關鍵路徑。 3W模式的運用不僅提高了報建工作效率,縮短整個建設工程項目的時間,而且能更有效地使用企業(yè)有限的資源,控制整個項目成本。
[Abstract]:With the rapid development of our country's economic construction, how to manage the construction project effectively so that the construction project can maintain the people's livelihood, unify the urban planning and the sustainable recycling of natural resources under the premise of using the new science and technology. These are the major issues of concern to the state and the masses of the people. At present, the Ministry of Construction of similar projects such as construction promulgated the corresponding regulations. At the same time, the local government has made more detailed regulations on each link of the construction project in combination with the local specific conditions, which is convenient to carry out the project report and construction work effectively, and to complete the construction procedure of the early stage of the construction project in time. The smooth acquisition of construction license is an important link to ensure the timely completion of construction projects. In this paper, through the concrete analysis and study of various problems arising in the pre-construction stage of the construction project, and by using the methods of work breakdown structure, critical path method, network diagram and so on in project management, the paper summarizes the work in the stage of application and construction. Thus the 3W model is created. The 3W model which is created in this paper is divided into three aspects: design, bidding, examination and approval of work content, work decomposition, resource allocation, project schedule arrangement, and get the key path of the project. The application of 3W mode not only improves the efficiency of construction application, shortens the time of the whole construction project, but also effectively uses the limited resources of the enterprise and controls the whole project cost.
【學位授予單位】:復旦大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:TU722

【參考文獻】

相關期刊論文 前5條

1 屠海英;建設工程項目前期報建工作理論探討[J];大眾科技;2005年07期

2 胡綺紅;;淺談建筑工程前期報建工作[J];消費導刊;2008年12期

3 王偉前;;工業(yè)企業(yè)規(guī)劃報建管理創(chuàng)新[J];工業(yè)建筑;2008年S1期

4 胡明東;鄭成德;張奎;朱慶妮;;談房地產(chǎn)項目報建中的經(jīng)驗與體會[J];建設科技;2006年07期

5 田系久;;工程項目各階段實施內(nèi)部控制制度探析[J];財會通訊(理財版);2007年04期



本文編號:2304073

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/2304073.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶25b2f***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com