深基坑開挖與臨近既有城際鐵路的相互影響研究
[Abstract]:With the rapid development of high-speed inter-city railway construction in China and the large-scale construction of foundation pit engineering, the problem of interaction between excavation and adjacent intercity railway lines is inevitable in the engineering construction. In this paper, based on the foundation pit project of Xiaohong Mountain passenger Station near the city of Shanghai and Nanjing, the static and dynamic analysis models are established by using the large-scale finite element software ABAQUS, and the interaction between the excavation of deep foundation pit and the inter-city railway is studied. The main research contents and results are as follows: (1) according to the actual conditions of foundation pit engineering in Xiaohong Mountain passenger Station, the finite element model is established. The characteristics of double-row pile supporting structure under excavation and dynamic load of foundation pit and the dynamic response of roadbed are analyzed, and the calculated results are compared with the measured data of foundation pit engineering. The validity of the model is verified. (2) the internal force, horizontal displacement and surface deformation of the support structure under different train speeds are compared and analyzed. (2) the internal force, horizontal displacement and surface deformation of the support structure with the speed of 150 km / h are compared and analyzed. The results show that the bending moment of the double-row pile increases obviously with the increase of the speed of the train, and the value of the bending moment of the double-row pile is obviously increased with the increase of the speed of the train. The horizontal displacement, ground subsidence and uplift of double-row piles are slightly increased. (3) through the analysis of bending moment, horizontal displacement and surface uplift of double-row piles at different distances between inter-city railway and foundation pit, When the distance between them is within 4 times of the depth of foundation pit, the influence of inter-city railway on the supporting structure of foundation pit should be considered in the design of supporting structure. The dynamic response characteristics of roadbed in x direction and y direction show that using double row pile support and soil reinforcement in passive zone can significantly reduce the lateral displacement of subgrade caused by excavation of foundation pit, compared with only adopting double row pile support. (5) the characteristics of subgrade deformation, vibration and dynamic stress under different excavation depth are compared and analyzed. The results show that the influence of excavation depth on subgrade is mainly reflected in increasing the horizontal lateral displacement of subgrade. Vertical settlement, differential settlement of subgrade and increase of tensile stress in X direction of the surface layer of foundation bed.
【學(xué)位授予單位】:南京大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU473.2;U212.22
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李雙洋;張明義;張淑娟;黃志軍;;列車荷載下青藏鐵路凍土路基動力響應(yīng)分析[J];冰川凍土;2008年05期
2 吳璀余;;緊鄰既有鐵路深基坑開挖支護(hù)方案模擬分析與計(jì)算[J];國防交通工程與技術(shù);2010年04期
3 郅友成;;既有鐵路旁基坑開挖對高填方路堤穩(wěn)定性的影響研究[J];公路交通科技;2006年03期
4 李梅芳;肖軍華;宮全美;周順華;;鄰近既有線深基坑開挖過程中的動力響應(yīng)分析[J];華東交通大學(xué)學(xué)報(bào);2011年05期
5 何頤華,楊斌,金寶森,李瑞茹,,譚永堅(jiān),王鐵宏;雙排護(hù)坡樁試驗(yàn)與計(jì)算的研究[J];建筑結(jié)構(gòu)學(xué)報(bào);1996年02期
6 楊德健;王鐵成;尹建峰;;雙排樁支護(hù)結(jié)構(gòu)受力特征與土壓力計(jì)算分析[J];建筑科學(xué);2007年09期
7 黃國銘;熊巨華;;雙排樁支護(hù)結(jié)構(gòu)的工程應(yīng)用與性能研究[J];山西建筑;2008年15期
8 樊宇強(qiáng);;雙排樁基坑支護(hù)在臨近既有線基坑開挖的應(yīng)用[J];山西建筑;2009年16期
9 熊巨華;一類雙排樁支護(hù)結(jié)構(gòu)的簡化計(jì)算方法[J];勘察科學(xué)技術(shù);1999年02期
10 孫鵬,夏景仁,李春國,李燕偉;較大動荷載作用下深基坑的支護(hù)[J];遼寧建材;2005年04期
相關(guān)博士學(xué)位論文 前4條
1 胡萍;高速鐵路無砟軌道密集過渡段路基動力試驗(yàn)與仿真分析[D];中南大學(xué);2010年
2 聶志紅;高速鐵路軌道路基豎向動力響應(yīng)研究[D];中南大學(xué);2005年
3 陳震;高速鐵路路基動力響應(yīng)研究[D];中國科學(xué)院研究生院(武漢巖土力學(xué)研究所);2006年
4 張國亮;緊鄰既有線地鐵車站深基坑工程穩(wěn)定與變形特性研究[D];中南大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 張明瑞;門型抗滑樁支護(hù)滑坡時(shí)受力特性的數(shù)值模擬研究[D];南京大學(xué);2011年
2 李玲英;高速鐵路中小跨度橋梁活載設(shè)計(jì)標(biāo)準(zhǔn)的研究[D];中南大學(xué);2011年
3 許杰;軟土地區(qū)鐵路既有線動力響應(yīng)測試及提速列車—路基動力作用特性研究[D];上海交通大學(xué);2011年
4 孫銘心;高壓旋噴樁工程特性研究[D];大連理工大學(xué);2000年
5 楊靖;考慮尺寸效應(yīng)的雙排樁的有限元分析[D];天津大學(xué);2006年
6 張碧;高速鐵路路基動力響應(yīng)分析[D];長安大學(xué);2007年
7 王俊生;地鐵盾構(gòu)隧道施工與運(yùn)營對城際鐵路路基沉降的影響[D];北京交通大學(xué);2010年
8 范生波;高速鐵路無砟軌道路基動響應(yīng)測試分析[D];西南交通大學(xué);2010年
9 陳鼎;高速鐵路路基動力響應(yīng)及影響因素研究[D];中南大學(xué);2010年
10 田雪梅;雙排樁支護(hù)結(jié)構(gòu)的理論分析及數(shù)值計(jì)算[D];太原理工大學(xué);2012年
本文編號:2214888
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/2214888.html