高層鋼框架—混凝土核心筒混合結(jié)構(gòu)體系施工監(jiān)測(cè)與分析
本文選題:混合結(jié)構(gòu) + 施工仿真分析 ; 參考:《華南理工大學(xué)》2013年碩士論文
【摘要】:近年來(lái),隨著國(guó)家大劇院、國(guó)家體育場(chǎng)“鳥(niǎo)巢”、CCTV新臺(tái)址、廣州歌劇院以及廣州圖書(shū)館等一批大型復(fù)雜建筑結(jié)構(gòu)建設(shè)的興起,以及施工過(guò)程中日益增多的安全事故,建筑施工過(guò)程中的安全問(wèn)題越來(lái)越受到關(guān)注。因此,對(duì)大型復(fù)雜高層建筑進(jìn)行施工仿真分析和施工監(jiān)測(cè)對(duì)保障其施工過(guò)程的安全是很有必要的。 廣東興業(yè)國(guó)際倉(cāng)儲(chǔ)科研主樓結(jié)構(gòu)建筑造型獨(dú)特,結(jié)構(gòu)形式新穎。本文以該結(jié)構(gòu)為工程實(shí)例,對(duì)其施工過(guò)程中的施工監(jiān)測(cè)進(jìn)行了深入研究,具體工作內(nèi)容如下: 1、在廣泛查閱相關(guān)文獻(xiàn)的基礎(chǔ)上,回顧了高層鋼框架-混凝土核心筒這一混合結(jié)構(gòu)的工程應(yīng)用狀況,簡(jiǎn)單介紹了混合結(jié)構(gòu)的受力特點(diǎn)、施工特點(diǎn)及施工期間的時(shí)變特性。 2、探討了復(fù)雜高層混合結(jié)構(gòu)施工監(jiān)測(cè)原理、方法以及施工過(guò)程力學(xué)理論與實(shí)現(xiàn)方法。 3、利用狀態(tài)變量疊加法,采用大型有限元軟件Midas/Gen對(duì)廣東興業(yè)國(guó)際倉(cāng)儲(chǔ)科研主樓結(jié)構(gòu)安裝過(guò)程進(jìn)行仿真分析,分析出不同施工工況對(duì)結(jié)構(gòu)的影響,并以此科學(xué)合理地指導(dǎo)施工監(jiān)測(cè)。 4、介紹了該結(jié)構(gòu)整個(gè)施工過(guò)程及施工監(jiān)測(cè)過(guò)程,并將實(shí)測(cè)的應(yīng)力、位移數(shù)據(jù)與仿真計(jì)算結(jié)果進(jìn)行對(duì)比分析,保障了施工的安全。并對(duì)監(jiān)測(cè)中誤差的產(chǎn)生原因進(jìn)行討論分析。 本文以廣東興業(yè)國(guó)際倉(cāng)儲(chǔ)科研主樓為背景,對(duì)復(fù)雜高層混合結(jié)構(gòu)施工監(jiān)測(cè)進(jìn)行了研究,得出只有把施工仿真分析與施工監(jiān)測(cè)有機(jī)結(jié)合起來(lái),才能更有效地保障復(fù)雜高層混合結(jié)構(gòu)施工過(guò)程中的安全。
[Abstract]:In recent years, with the rise of the National Grand Theater, the National Stadium "Bird's Nest" and the new site of CCTV, the rise of the Guangzhou Opera House and the Guangzhou Library, and the increasing number of safety accidents in the construction process, More and more attention has been paid to the safety problems in the construction process. Therefore, it is necessary to carry out construction simulation analysis and construction monitoring for large and complex high-rise buildings to ensure the safety of their construction process. Guangdong Xingye International warehousing and Research Building has unique structure and novel structure. Taking the structure as an engineering example, this paper makes a deep study on the construction monitoring in the construction process. The specific work contents are as follows: 1. On the basis of extensive reference to relevant documents, the engineering application of the high-rise steel frame-concrete core-tube composite structure is reviewed, and the mechanical characteristics, construction characteristics and time-varying characteristics of the composite structure during construction are briefly introduced. 2. The construction monitoring principle, method, mechanics theory and realization method of complex high-rise mixed structure are discussed. 3. By using the superposition method of state variables and large scale finite element software Midas/Gen, the structural installation process of Guangdong Xingye International Warehouse and Research main Building is simulated and analyzed, and the influence of different construction conditions on the structure is analyzed. And with this scientific and reasonable guidance construction monitoring. 4. The whole construction process and the construction monitoring process of the structure are introduced, and the measured stress and displacement data are compared with the simulation results to ensure the safety of the construction. The causes of errors in monitoring are discussed and analyzed. Based on the background of Guangdong Xingye International Warehouse and Research Building, this paper studies the construction monitoring of complex high-rise mixed structure, and draws the conclusion that only the construction simulation analysis and construction monitoring can be combined organically. In order to ensure the safety of the complex high-rise hybrid structure more effectively.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:TU974
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 何秀鳳,華錫生,丁曉利,陳永奇,孫永榮;GPS一機(jī)多天線(xiàn)變形監(jiān)測(cè)系統(tǒng)[J];水電自動(dòng)化與大壩監(jiān)測(cè);2002年03期
2 楊?lèi)?ài)玉;丁克偉;;渡江戰(zhàn)役紀(jì)念館主體結(jié)構(gòu)安全性分析[J];工程與建設(shè);2012年01期
3 郭彥林,崔曉強(qiáng);大跨度復(fù)雜鋼結(jié)構(gòu)施工過(guò)程中的若干技術(shù)問(wèn)題及探討[J];工業(yè)建筑;2004年12期
4 郭彥林;劉學(xué)武;;大型復(fù)雜鋼結(jié)構(gòu)施工力學(xué)問(wèn)題及分析方法[J];工業(yè)建筑;2007年09期
5 劉學(xué)武;郭彥林;;鋼結(jié)構(gòu)施工變形預(yù)調(diào)值及分析方法[J];工業(yè)建筑;2007年09期
6 劉學(xué)武;郭彥林;張慶林;劉祿宇;;CCTV新臺(tái)址主樓施工過(guò)程結(jié)構(gòu)內(nèi)力和變形分析[J];工業(yè)建筑;2007年09期
7 王立軍,周江余;CZY無(wú)浮托引張線(xiàn)系統(tǒng)在水電站觀測(cè)上的應(yīng)用[J];華中電力;2004年05期
8 張建林;易和;鄧浩;蔡健;張季超;劉晨;;廣東科學(xué)中心E區(qū)大跨度鋼結(jié)構(gòu)施工模擬分析[J];建筑結(jié)構(gòu);2010年08期
9 李磊,黃奎生,羅永峰;預(yù)應(yīng)力梁弦結(jié)構(gòu)預(yù)應(yīng)力施工控制的非線(xiàn)性分析[J];重慶建筑大學(xué)學(xué)報(bào);2003年04期
10 李瑞禮,曹志遠(yuǎn);高層建筑結(jié)構(gòu)施工力學(xué)分析[J];計(jì)算力學(xué)學(xué)報(bào);1999年02期
相關(guān)博士學(xué)位論文 前2條
1 鄧暉;大跨度空間結(jié)構(gòu)施工監(jiān)測(cè)與分析[D];中南大學(xué);2007年
2 張慎偉;大型鋼結(jié)構(gòu)施工過(guò)程計(jì)算理論與監(jiān)測(cè)技術(shù)[D];同濟(jì)大學(xué);2007年
相關(guān)碩士學(xué)位論文 前4條
1 劉慶梅;高層框架—核心筒混合結(jié)構(gòu)抗震性能研究[D];西安建筑科技大學(xué);2011年
2 孫旭光;網(wǎng)殼結(jié)構(gòu)滑移法施工全過(guò)程分析及監(jiān)測(cè)[D];浙江大學(xué);2005年
3 紀(jì)晗;大跨度網(wǎng)殼結(jié)構(gòu)施工過(guò)程數(shù)值模擬與監(jiān)測(cè)[D];華中科技大學(xué);2006年
4 劉小云;復(fù)雜結(jié)構(gòu)施工監(jiān)測(cè)分析與研究[D];長(zhǎng)安大學(xué);2009年
,本文編號(hào):1819678
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/1819678.html