風(fēng)電輔機(jī)建設(shè)項(xiàng)目質(zhì)量管理方法研究
本文選題:風(fēng)電場(chǎng)建設(shè) 切入點(diǎn):質(zhì)量管理方法 出處:《華北電力大學(xué)》2013年碩士論文
【摘要】:隨著能源和環(huán)境問(wèn)題的日益嚴(yán)重,人類開(kāi)始大規(guī)模開(kāi)發(fā)利用可再生清潔能源,風(fēng)能作為一種綠色無(wú)污染的可再生能源,是當(dāng)今最具開(kāi)發(fā)前景的新能源之一。近年來(lái),風(fēng)電場(chǎng)建設(shè)項(xiàng)目眾多,建設(shè)過(guò)程中質(zhì)量管理問(wèn)題凸顯,工程質(zhì)量問(wèn)題不僅關(guān)系到工程的適用性和投資效果,而且關(guān)系到人們的生命財(cái)產(chǎn)安全,因此。本文以金紫山風(fēng)電場(chǎng)項(xiàng)目質(zhì)量管理體系為研究對(duì)象,通過(guò)對(duì)風(fēng)電輔機(jī)建設(shè)過(guò)程中出現(xiàn)問(wèn)題的研究,在學(xué)習(xí)了全面質(zhì)量管理體系的知識(shí)后,對(duì)風(fēng)電輔機(jī)項(xiàng)目的質(zhì)量管理體系提出了改進(jìn)措施,對(duì)以后的風(fēng)電輔機(jī)工程建設(shè)提供了經(jīng)驗(yàn)和借鑒。 本文首先簡(jiǎn)單介紹了當(dāng)前風(fēng)電項(xiàng)目建設(shè)現(xiàn)狀,從項(xiàng)目特點(diǎn)到項(xiàng)目具體要求等做了簡(jiǎn)要分析,對(duì)國(guó)內(nèi)外對(duì)質(zhì)量管理方法的研究現(xiàn)狀及趨勢(shì)做了調(diào)研研究,同時(shí)指出風(fēng)電輔機(jī)項(xiàng)目建設(shè)是風(fēng)電場(chǎng)建設(shè)過(guò)程中尤其重要的環(huán)節(jié),它的高質(zhì)量完成將對(duì)整個(gè)風(fēng)電項(xiàng)目質(zhì)量起決定性作用。針對(duì)實(shí)際風(fēng)電輔機(jī)項(xiàng)目建設(shè)過(guò)程中出現(xiàn)的質(zhì)量管理問(wèn)題進(jìn)行了分析探討。運(yùn)用項(xiàng)目質(zhì)量管理和質(zhì)量保證原理的相關(guān)知識(shí)對(duì)其問(wèn)題進(jìn)行了分析研究,并指出了問(wèn)題產(chǎn)生的原因,通過(guò)對(duì)風(fēng)電輔機(jī)項(xiàng)目建設(shè)過(guò)程中實(shí)際問(wèn)題的歸納總結(jié),運(yùn)用全面質(zhì)量管理方法的相關(guān)知識(shí)對(duì)現(xiàn)有的質(zhì)量管理體系提出了改進(jìn)措施,并得到了詳細(xì)的管理方法應(yīng)用步驟。 文章最后一部分對(duì)論文進(jìn)行了總結(jié)。全面質(zhì)量管理方法在風(fēng)電輔機(jī)項(xiàng)目建設(shè)過(guò)程的良好實(shí)施對(duì)于風(fēng)電項(xiàng)目建設(shè)的高質(zhì)量完成具有一定實(shí)際意義,對(duì)實(shí)際風(fēng)電輔機(jī)項(xiàng)目建設(shè)中質(zhì)量保證問(wèn)題具有一定參考價(jià)值。
[Abstract]:With the increasingly serious problems of energy and environment, people begin to develop and utilize renewable clean energy on a large scale. Wind energy, as a kind of green and pollution-free renewable energy, is one of the most promising new energy sources in recent years. There are many wind farm construction projects, the quality management problems in the construction process highlight, the project quality issues not only related to the applicability of the project and investment results, but also related to the safety of people's lives and property. Therefore, this paper takes the project quality management system of Jinzishan wind farm as the research object, through the research on the problems in the process of wind power auxiliary construction, after studying the knowledge of the total quality management system, The improvement measures for the quality management system of the wind power auxiliary project are put forward, and the experience and reference for the construction of the wind power auxiliary machine project in the future are provided. Firstly, this paper briefly introduces the current situation of wind power project construction, from the characteristics of the project to the specific requirements of the project and makes a brief analysis, and makes a survey and research on the research status and trend of the quality management methods at home and abroad. At the same time, it is pointed out that the construction of wind power auxiliary equipment project is a particularly important link in the process of wind farm construction. Its high quality completion will play a decisive role in the quality of the whole wind power project. This paper analyzes and discusses the problems of quality management in the construction process of the actual wind power auxiliary equipment project. The application of project quality management and quality assurance is discussed. The relevant knowledge of theory has analyzed and studied its problems, The causes of the problems are pointed out. By summarizing the practical problems in the construction of wind power auxiliary equipment project, the author puts forward the improvement measures for the existing quality management system by using the relevant knowledge of the total quality management method. And got the detailed management method application steps. In the last part of the paper, the conclusion is given. The good implementation of TQM in the construction process of wind power auxiliary equipment project has certain practical significance for the high quality completion of wind power project construction. It has certain reference value to the quality assurance problem in the actual wind power auxiliary machine project construction.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU712.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孔繁榮;TQC創(chuàng)始人菲根堡姆博士創(chuàng)建的“質(zhì)量?jī)r(jià)值鏈”介紹[J];電子質(zhì)量;2000年03期
2 張榮生,李偉;正向工程質(zhì)量行為是工程實(shí)體質(zhì)量的保證[J];工程質(zhì)量;2005年03期
3 李偉,黃微;淺析合同條件下的工程項(xiàng)目質(zhì)量管理[J];工業(yè)技術(shù)經(jīng)濟(jì);2003年01期
4 陳志海;;如何提高企業(yè)管理體系運(yùn)行的有效性[J];廣西電業(yè);2007年06期
5 何昌茂;;淺談風(fēng)電場(chǎng)施工建設(shè)安全管理[J];能源與環(huán)境;2012年05期
6 李會(huì)敏;李浩;張凈;;核電工程建設(shè)質(zhì)量管理體系研究[J];核標(biāo)準(zhǔn)計(jì)量與質(zhì)量;2010年04期
7 應(yīng)關(guān)水;金崇明;張文琦;;企業(yè)質(zhì)量管理體系與項(xiàng)目質(zhì)量管理體系的比較研究[J];建筑;2006年14期
8 王凱;郭漢丁;;強(qiáng)化建設(shè)工程質(zhì)量的政府監(jiān)督管理[J];基建優(yōu)化;2006年05期
9 王雪聰,唐曉青;虛擬企業(yè)質(zhì)量管理系統(tǒng)體系結(jié)構(gòu)研究[J];制造業(yè)自動(dòng)化;2001年11期
10 卜煒瑋;繆青;朱宏亮;;工程建設(shè)標(biāo)準(zhǔn)體制的問(wèn)題與對(duì)策[J];建筑經(jīng)濟(jì);2006年S1期
相關(guān)碩士學(xué)位論文 前5條
1 胡仲春;基于關(guān)鍵利益相關(guān)方的施工項(xiàng)目質(zhì)量保證體系研究[D];山東大學(xué);2006年
2 劉立新;通信工程項(xiàng)目質(zhì)量管理研究[D];北京郵電大學(xué);2008年
3 胡志波;長(zhǎng)源荊門2×600MW擴(kuò)建工程質(zhì)量管理研究[D];華北電力大學(xué)(北京);2008年
4 楊杰;西柏坡電廠建設(shè)項(xiàng)目質(zhì)量管理研究[D];華北電力大學(xué)(河北);2009年
5 張皎;全面質(zhì)量管理在捷宸太陽(yáng)能項(xiàng)目管理中的應(yīng)用研究[D];吉林大學(xué);2010年
,本文編號(hào):1654638
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/1654638.html