中央吸塵設(shè)備安裝工程質(zhì)量控制問(wèn)題研究
本文選題:建設(shè)工程 切入點(diǎn):工程質(zhì)量 出處:《天津大學(xué)》2013年碩士論文 論文類(lèi)型:學(xué)位論文
【摘要】:建筑業(yè)已經(jīng)成為我國(guó)社會(huì)支柱性產(chǎn)業(yè)。建筑工程項(xiàng)目的投資和消耗的人力、物力等都占大部分的比重,所以關(guān)鍵就是工程產(chǎn)品需要一次性建成符合質(zhì)量要求。人民生命和財(cái)產(chǎn)安全體現(xiàn)工程產(chǎn)品的質(zhì)量的好壞,生存發(fā)展同樣也對(duì)建筑業(yè)起著絕對(duì)性作用。所以選擇此為課題進(jìn)行研究具有現(xiàn)實(shí)或者說(shuō)具有重要的意義。 首先,本文對(duì)質(zhì)量控制的基礎(chǔ)性理論進(jìn)行闡述并且對(duì)質(zhì)量和質(zhì)量控制作了清晰地界定,同時(shí)詳細(xì)地闡述對(duì)工程質(zhì)量控制的內(nèi)容、依據(jù)、程序、原則、方法、步驟和要素等。其次,以中央吸塵設(shè)備安裝項(xiàng)目基本情況為基礎(chǔ),總結(jié)出質(zhì)量控制的現(xiàn)狀。通過(guò)對(duì)該項(xiàng)目的進(jìn)一步研究和實(shí)踐,發(fā)現(xiàn)在質(zhì)量控制過(guò)程中存在著諸多問(wèn)題并分析了產(chǎn)生這些問(wèn)題的具體原因,,具體包括:人員素質(zhì)不高、質(zhì)量控制意識(shí)淡薄、質(zhì)量控制技術(shù)落后、制度落實(shí)不嚴(yán)格和責(zé)權(quán)配置不合理等。再次,論文就問(wèn)題提出了對(duì)應(yīng)的改進(jìn)措施及其方法,即:提高施工人員素質(zhì),提高質(zhì)量控制意識(shí),提高改進(jìn)質(zhì)量控制方法、落實(shí)各項(xiàng)管理制度和優(yōu)化質(zhì)量控制體系等。最后,對(duì)論文的研究結(jié)論進(jìn)行了概括并且對(duì)今后的研究方向進(jìn)行展望。
[Abstract]:The construction industry has become a pillar industry in our society. The investment in construction projects and the human and material resources consumed in construction projects account for the majority of the proportion. So the key is that engineering products need to be built at one time to meet the quality requirements. The safety of people's lives and property reflects the quality of engineering products. Survival and development also play an absolute role in the construction industry, so it is of practical or important significance to choose this as the research topic. First of all, the basic theory of quality control is expounded and the quality and quality control are clearly defined. At the same time, the contents, bases, procedures, principles and methods of engineering quality control are elaborated in detail. Secondly, based on the basic situation of the installation project of central dust suction equipment, the present situation of quality control is summarized. Through the further research and practice of the project, Found that there are many problems in the process of quality control and analyzed the specific causes of these problems, including: the quality of personnel is not high, quality control awareness is weak, quality control technology is backward, Thirdly, the paper puts forward the corresponding measures and methods to improve the quality of the construction personnel, raise the consciousness of quality control and improve the methods of quality control. Finally, the conclusion of the paper is summarized and the future research direction is prospected.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:TU712.3;TU758.7
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 許鴻泰;談優(yōu)化設(shè)計(jì)對(duì)三大控制的重要性[J];工程建設(shè)與設(shè)計(jì);2003年12期
2 楊建平;高毛毛;;層次分析法在住宅項(xiàng)目選址中的應(yīng)用[J];工程建設(shè)與設(shè)計(jì);2007年03期
3 徐如良;;建筑工程施工項(xiàng)目管理措施探討[J];廣東建材;2008年08期
4 丁權(quán);;施工過(guò)程中項(xiàng)目的質(zhì)量管理與控制[J];建設(shè)監(jiān)理;2010年07期
5 趙陽(yáng);周志新;;項(xiàng)目可行性研究階段的質(zhì)量控制[J];山西建筑;2007年07期
6 李永成;;淺談工程質(zhì)量監(jiān)理的原則和內(nèi)容及程序[J];山西建筑;2008年04期
7 張潞;;建筑施工中如何對(duì)4M1E進(jìn)行質(zhì)量控制[J];山西建筑;2009年01期
8 曾志偉;;鋼結(jié)構(gòu)工程質(zhì)量通病及質(zhì)量控制[J];山西建筑;2009年19期
9 石云峰;;淺談建筑施工項(xiàng)目的質(zhì)量控制[J];山西建筑;2010年34期
10 胡繁;施工圖設(shè)計(jì)文件審查質(zhì)量控制[J];中國(guó)勘察設(shè)計(jì);2004年06期
本文編號(hào):1560845
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/1560845.html