火力發(fā)電廠廠級AGC系統(tǒng)設(shè)計與實(shí)現(xiàn)
[Abstract]:The purpose and the main meaning of popularizing and implementing optimal load distribution in power plant is that the AGC automatic power generation control (Automatic Generation Control) of thermal power plant is used to connect the power grid energy management system with the generator unit control system in essence. As an important control system to balance the load of generating set and power grid, factory level AGC can ensure the stability and efficiency of power network, improve the efficiency of power generation, and ensure the coordinated and stable operation of unit equipment. Finally, the sustainable and efficient development of power grid and power plant is realized. This paper analyzes the feasibility of practical application of AGC system in thermal power plant. By consulting the relevant research literature at home and abroad, the feasibility analysis is carried out theoretically, and then the test and simulation environment is established. The data of load distribution of AGC system at plant level are collected through simulation system, and the feasibility of the test is further combined with the actual project to carry out practical demonstration. Finally, it is proved by the actual project that the whole plant mode of AGC can effectively improve the deficiency of the traditional AGC system in dispatching load, which can be used as a powerful assistant to the AGC of power grid and realize the high efficiency and sustainable economic benefit. At the same time, it also shows that the coal consumption curve of the unit must be relatively accurate as the soul of the factory level AGC system. If the accurate coal consumption curve can be combined with the factory level AGC, the win-win situation of energy saving and dispatching of power grid and power plant will be realized.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2016
【分類號】:TP311.52;TM621.6
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 于汀;蒲天驕;劉廣一;李時光;趙聰;田愛忠;;電網(wǎng)AGC與AVC協(xié)調(diào)控制方法[J];電力系統(tǒng)保護(hù)與控制;2015年15期
2 張建斌;;基于智能化的系統(tǒng)集成項(xiàng)目管理探究[J];中國管理信息化;2015年06期
3 崔鵬飛;王明旗;;影響濕法脫硫效率的因素分析[J];電力安全技術(shù);2014年12期
4 付鵬武;周念成;王強(qiáng)鋼;陸巍;;基于時滯模型預(yù)測控制算法的網(wǎng)絡(luò)化AGC研究[J];電工技術(shù)學(xué)報;2014年04期
5 于海;;軟件生產(chǎn)率影響因素分析框架[J];軟件導(dǎo)刊;2014年04期
6 李科;萬文軍;李軍;;廠級AGC工程應(yīng)用關(guān)鍵技術(shù)研究[J];發(fā)電設(shè)備;2014年02期
7 李曉燕;;降低供電煤耗的方法探討[J];價值工程;2013年28期
8 鄢波;齊聰;何鈞;;基于節(jié)能調(diào)度的廠級AGC系統(tǒng)設(shè)計與應(yīng)用[J];熱力發(fā)電;2013年07期
9 許丹;夏少連;丁強(qiáng);馬志民;;基于啟發(fā)式混合整數(shù)規(guī)劃法求解大規(guī)模機(jī)組組合問題[J];電力系統(tǒng)保護(hù)與控制;2012年21期
10 康懿;;計算機(jī)軟件項(xiàng)目管理與計劃[J];科技視界;2012年28期
相關(guān)碩士學(xué)位論文 前1條
1 洪巧巧;燃煤電廠煙氣脫硫脫硝除塵技術(shù)生命周期評價[D];浙江大學(xué);2015年