天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

淄博市淄川區(qū)工業(yè)園區(qū)水土保持方案編制分析

發(fā)布時(shí)間:2018-06-08 23:14

  本文選題:淄博市 + 工業(yè)園區(qū) ; 參考:《山東大學(xué)》2015年碩士論文


【摘要】:隨著科學(xué)技術(shù)的快速發(fā)展,開(kāi)發(fā)建設(shè)項(xiàng)目如雨后春筍般快速增多,而工業(yè)園區(qū)項(xiàng)目也在全國(guó)各地積極籌建,且發(fā)展勢(shì)頭良好。工業(yè)園區(qū)已成為促進(jìn)地方經(jīng)濟(jì)迅猛發(fā)展的重要力量。與此同時(shí),工業(yè)園區(qū)的建設(shè)將大面積擾動(dòng)原地貌,破壞植被,對(duì)區(qū)域環(huán)境和生態(tài)平衡都會(huì)造成不良影響。為此,編制工業(yè)園區(qū)水土保持方案意義重大,是貫徹國(guó)家法律法規(guī)的體現(xiàn),是控制工業(yè)園區(qū)項(xiàng)目建設(shè)引起水土流失的有效途徑。工業(yè)園區(qū)項(xiàng)目屬于典型的點(diǎn)型工程,園區(qū)占地面積大,上馬項(xiàng)目多,基礎(chǔ)建設(shè)內(nèi)容多,工程施工擾動(dòng)地面面積大,建設(shè)工期長(zhǎng),開(kāi)挖土石方較大是該類(lèi)工程的主要特點(diǎn)。本文在編制過(guò)程中,分以下幾個(gè)重要部分:工業(yè)園區(qū)水土保持現(xiàn)狀及存在的問(wèn)題、項(xiàng)目基本情況、土石方平衡、水土流失預(yù)測(cè)、水土保持監(jiān)測(cè)、工程設(shè)計(jì)和防治效果分析。通過(guò)水土流失預(yù)測(cè),確定工業(yè)園區(qū)重點(diǎn)防治時(shí)段、區(qū)域、監(jiān)測(cè)點(diǎn)位和監(jiān)測(cè)時(shí)段。根據(jù)工程建設(shè)分期實(shí)施方式,將項(xiàng)目分為2個(gè)一級(jí)分區(qū);根據(jù)分期實(shí)施的布局,將項(xiàng)目分為8個(gè)二級(jí)分區(qū);根據(jù)建設(shè)功能、建設(shè)內(nèi)容、、擾動(dòng)和破(損)壞地面的程度、采取不同的防治措施等因素,將項(xiàng)目區(qū)分為33個(gè)三級(jí)分區(qū)。項(xiàng)目開(kāi)挖土石方和表土剝離量較大,根據(jù)現(xiàn)狀地形地貌,做到區(qū)內(nèi)土石方平衡。在施工過(guò)程中,減少占地、減少擾動(dòng)面積、避開(kāi)雨季和大風(fēng)天氣施工,合理布設(shè)水土保持防治措施,減少工程建設(shè)產(chǎn)生的水土流失。本論文的研究成果為工業(yè)園區(qū)水土保持方案編制提供了理論依據(jù)和技術(shù)支持,有效的控制了工程建設(shè)過(guò)程產(chǎn)生的水土流失,根據(jù)園區(qū)水土流失特點(diǎn),提出了綜合防治體系,真正起到為開(kāi)發(fā)建設(shè)項(xiàng)目保駕護(hù)航的作用。
[Abstract]:With the rapid development of science and technology, the development and construction projects have mushroomed rapidly, and the industrial park projects are also actively prepared and developed in all parts of the country. The industrial park has become an important force to promote the rapid development of the local economy. At the same time, the construction of industrial parks will greatly disturb the original landforms and destroy the vegetation. Therefore, it is of great significance to the regional environment and ecological balance. Therefore, it is of great significance to compile the water and soil conservation scheme in the industrial park. It is the embodiment of the national laws and regulations and the effective way to control the soil erosion in the industrial park project. The industrial park project belongs to the typical point type project, the area is large and the project is many. There are many basic construction contents, large ground area of construction disturbance, long construction period and large soil and stone excavation, which are the main characteristics of this kind of project. In this paper, the following important parts are divided into several important parts: the status and existing problems of soil and water conservation in Industrial Park, the basic situation of the project, the balance of earth and stone, the prediction of soil and water loss, and the monitoring of soil and water conservation. Test, engineering design and prevention and control effect analysis. Through the prediction of soil erosion, the key prevention and control period, area, monitoring point and monitoring period of industrial park are determined. According to the construction stage implementation mode, the project is divided into 2 first level zoning. According to the layout of the stages, the project is divided into 8 two level zoning; according to the construction function, the construction content is based on the construction function. The project is divided into 33 three level zoning, with the degree of disturbance and breaking (damaged) the bad ground. The project is divided into 33 three grade zones. The research results of this paper provide theoretical basis and technical support for the establishment of water and soil conservation scheme in the industrial park, effectively control the soil erosion caused by the construction process, and put forward a comprehensive control system based on the characteristics of the water and soil loss in the park. Play a role in protecting the development and construction projects.
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:S157.2

【參考文獻(xiàn)】

相關(guān)期刊論文 前4條

1 于寶良;張春萍;;淺談治理水土流失的水土保持工程措施[J];民營(yíng)科技;2011年03期

2 馮紹元,丁躍元,姚彬;用人工降雨和數(shù)值模擬方法研究降雨入滲規(guī)律[J];水利學(xué)報(bào);1998年11期

3 石生新;高強(qiáng)度人工降雨條件下地面坡度、植被對(duì)坡面產(chǎn)沙過(guò)程的影響[J];山西水利科技;1996年03期

4 張小林;;對(duì)加強(qiáng)工業(yè)園區(qū)水土保持方案編報(bào)管理的思考[J];中國(guó)水土保持;2013年07期

,

本文編號(hào):1997632

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/nykj/1997632.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶(hù)81a1d***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com