天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 礦業(yè)工程論文 >

數(shù)值模擬分析在提高開采上限研究中的應(yīng)用

發(fā)布時(shí)間:2019-02-24 08:52
【摘要】:我國(guó)人口眾多,煤炭需求量大,能源相對(duì)緊張,最大限度地提高煤炭資源回采率,成為了當(dāng)前迫切的任務(wù)。而合理地縮小防水煤柱,提高煤層的開采上限,可解放大量呆滯煤量,提高資源回收率,對(duì)煤礦生產(chǎn)具有重大意義。 導(dǎo)水裂隙帶發(fā)育高度是影響提高開采上限的主要因素之一。通常長(zhǎng)壁工作面開采后,,頂板一般將破斷并垮落。工作面的空間有限,在深數(shù)百米到上千米的地下,工作面的開挖只有數(shù)米。正是因?yàn)榭臻g的有限,決定了破壞的有限性。為進(jìn)一步研究不同采高的裂隙高度發(fā)育規(guī)律,提高開采上限,采用數(shù)值模擬進(jìn)行計(jì)算比較。 本文以岱莊煤礦43下20工作面為例,在分析工作面水文地質(zhì)特征的基礎(chǔ)上,采用FLAC3D軟件開展提高開采上限數(shù)值模擬分析,研究了工作面覆巖破壞規(guī)律,并確定導(dǎo)水裂隙帶發(fā)育高度。模擬結(jié)果表明:3上煤層開采以后最大導(dǎo)水裂隙帶發(fā)育高度為21m左右,之后3下煤層的4321工作面開采,再采掘43下20工作面,其上部邊界塑性區(qū)的發(fā)育的最高達(dá)到35m,上部仍有約為23m的底部粘土隔水層。最后結(jié)合水文地質(zhì)及工程地質(zhì)條件進(jìn)行綜合評(píng)定,對(duì)工作面局部提高開采上限進(jìn)行可行性論證,證明了43下20工作面提高開采上限是可行的,為設(shè)計(jì)防水煤巖柱提供了參考依據(jù)。
[Abstract]:China has a large population, large demand for coal and relatively tight energy. It is an urgent task to improve the recovery rate of coal resources to the maximum extent. The reasonable reduction of waterproof coal pillar and raising the upper limit of coal mining can liberate a large amount of stagnant coal and increase the recovery rate of resources, which is of great significance to the production of coal mine. The development height of water-conducting fissure zone is one of the main factors affecting the increase of mining upper limit. Usually long-wall face mining, roof will generally break and collapse. Face space is limited, in the depth of hundreds of meters to thousands of meters underground, the face excavation only a few meters. It is because of the limited space that determines the finiteness of destruction. In order to further study the law of fracture height development of different mining heights and raise the upper limit of mining, numerical simulation was used to calculate and compare. In this paper, based on the analysis of the hydrogeological characteristics of the working face, a numerical simulation analysis of raising the upper limit of mining is carried out by using FLAC3D software, and the failure law of overburden rock in the working face is studied by taking the 43 lower 20 working face of Daizhuang Coal Mine as an example. The height of the fracture zone is determined. The simulation results show that: (3) the development height of the maximum water conductivity fissure zone is about 21 m after the mining of upper coal seam, and the maximum development of plastic zone in the upper boundary is 35 m after mining at 4321 working face of 3 lower coal seam and 20 working faces in 43 lower coal seams. In the upper part, there is still a clay barrier at the bottom of about 23 m. Finally, combined with hydrogeological and engineering geological conditions, the feasibility of raising mining upper limit is demonstrated, and it is proved that it is feasible to raise mining upper limit in 43 lower 20 working face. It provides a reference for the design of waterproof coal pillar.
【學(xué)位授予單位】:華北科技學(xué)院
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD823

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 任強(qiáng);劉偉韜;;覆巖采動(dòng)裂隙帶發(fā)育規(guī)律的數(shù)值模擬分析[J];安全與環(huán)境學(xué)報(bào);2006年S1期

2 馮銳,林宣明,陶裕錄,周海南,滕云田,周鶴鳴,郝錦綺;煤層開采覆巖破壞的層析成像研究[J];地球物理學(xué)報(bào);1996年01期

3 王連富,李衛(wèi)東,劉道文,李功;綜放采場(chǎng)覆巖破壞高度的實(shí)測(cè)方法及應(yīng)用[J];礦業(yè)安全與環(huán)保;2005年03期

4 劉增輝;楊本水;;利用數(shù)值模擬方法確定導(dǎo)水裂隙帶發(fā)育高度[J];礦業(yè)安全與環(huán)保;2006年05期

5 葛曉明;;淺析水體下采煤[J];能源與環(huán)境;2011年06期

6 江文武;徐國(guó)元;馬長(zhǎng)年;;FLAC_3D的錨桿拉拔數(shù)值模擬試驗(yàn)[J];哈爾濱工業(yè)大學(xué)學(xué)報(bào);2009年10期

7 疏開生 ,倪宏革;煤層覆巖破壞高度的數(shù)學(xué)分析[J];淮南礦業(yè)學(xué)院學(xué)報(bào);1992年Z1期

8 鄒海,桂和榮,陳兆炎;導(dǎo)水裂隙帶高度預(yù)測(cè)途徑探討[J];江蘇地質(zhì);1997年02期

9 黃樂亭;采場(chǎng)覆巖兩帶高度與覆巖硬度的函數(shù)關(guān)系[J];礦山測(cè)量;1999年01期

10 馬慶云,湯建泉;覆巖運(yùn)動(dòng)與破壞過程的問題探討[J];礦山壓力與頂板管理;2000年02期



本文編號(hào):2429378

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/kuangye/2429378.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶87805***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com