煤礦斜井管片襯砌結(jié)構(gòu)受力分析
[Abstract]:With the rapid development of national economy, the consumption of coal energy increases year by year, many coal mines have entered the stage of deep mining. Using the safe and efficient TBM construction method to enter the mining face quickly in the form of inclined shaft has become the first choice of deep coal mining at present. How to effectively reduce the plastic deformation pressure acting on segment lining and ensure the long-term safety of tunnel in soft rock with significant creep effect when TBM method is used to build inclined shaft in deep soft rock with high ground stress, how to effectively reduce the plastic deformation pressure acting on segment lining. It has become a key problem in the design and construction of inclined wells. In this paper, based on the TBM long distance test inclined shaft project in Shenhua Xinjie Taigemiao mining area, the basic theory of lining structure design of coal mine roadway (inclined shaft) built by TBM under complex condition is combined with the coal joint fund project <. In view of the characteristics of "large buried depth and soft surrounding rock" in inclined well, the elastic-plastic analysis of deep buried soft rock tunnel based on strain softening model, the reasonable grouting lag distance of TBM construction and the long-term safety study under creep effect are carried out respectively. In order to provide a reference for the construction of single shield TBM soft rock section. The main contents and results of this paper are as follows: (1) based on the strain softening model, the analytical solutions of the displacement, stress and plastic zone range of surrounding rock of deep buried circular roadway under the action of non-axisymmetric loads are derived. The results show that the plastic zone radius of the strain softening model is larger than that of the ideal elastoplastic model, but the distribution of the plastic zone is consistent between the two models. On this basis, the FLAC3D strain softening model is used to simulate the surrounding rock of the tunnel. The effects of different degrees of cohesive softening, internal friction angle softening and shear expansion angle softening on the displacement, plastic zone range and segment stress of the surrounding rock after the excavation of the tunnel are studied. The results show that with the increase of softening degree, the displacement of surrounding rock, the range of plastic zone and the stress of segment are all increased. It is very necessary to consider the strain softening effect of rock mass. (2) with the help of FLAC3D strain softening model to simulate the surrounding rock of tunnel, the excavation and supporting tunnel of single shield TBM with segment reserved compressible layer are numerically simulated. The variation of surrounding rock displacement and segment stress with the lag distance of bean-gravel grouting was studied. The results show that the displacement of surrounding rock increases gradually and the stress of segment decreases with the increase of the lag distance of grouting in the pea gravel bed. On this basis, when the maximum of the first principal stress of the segment begins to be less than the design strength of the segment concrete, the minimum lag distance is taken as the minimum lag distance, and the lag distance of the displacement growth rate of surrounding rock is taken as the reasonable lag distance. Therefore, the reasonable grouting lag distance in different buried depth is determined. (3) the long-term creep effect of soft rock tunnel with large buried depth is studied by using FLAC3D built-in Burgers viscoelastic-plastic creep constitutive model. In order to study the long-term safety of tunnel, the variation law of surrounding rock displacement and segment stress with time within 100 years after completion of inclined shaft in coal mine under different buried depth and different lateral pressure coefficient is analyzed.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:TD55
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 郭建新;高永濤;;基于軟破圍巖錨噴支護(hù)位移理論的隧道支護(hù)時(shí)間分析[J];遼寧科技大學(xué)學(xué)報(bào);2009年05期
2 黃運(yùn)飛,楊維懷;地下工程圍巖維護(hù)的新途徑—切縫弱化圍巖法研究[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);1988年03期
3 鞠慶海;弱面對(duì)圍巖穩(wěn)定的影響及圍巖強(qiáng)度的補(bǔ)償[J];煤炭工程師;1990年03期
4 許永吉;陳晶晶;;常用圍巖自撐能力評(píng)判方法探討[J];科技致富向?qū)?2012年06期
5 李政鈞;;錨桿加固圍巖的作用機(jī)理研究[J];西部探礦工程;2006年08期
6 柳軍城,王圣彬;微震動(dòng)爆破技術(shù)在軟弱松散圍巖中的應(yīng)用[J];西部探礦工程;2002年04期
7 費(fèi)文平;張建美;崔華麗;張國(guó)強(qiáng);;深部地下洞室施工期圍巖大變形機(jī)制分析[J];巖石力學(xué)與工程學(xué)報(bào);2012年S1期
8 邱小佩,陳昊;高壓通水隧道混凝土裂縫及圍巖固結(jié)止水處理[J];西部探礦工程;1999年06期
9 賈金剛;王天佑;李珩;董鋒;;大伙房水庫(kù)輸水工程圍巖穩(wěn)定性數(shù)值分析[J];現(xiàn)代礦業(yè);2010年01期
10 趙永川;張正平;;暮底河水庫(kù)輸水隧洞圍巖穩(wěn)定性及對(duì)策[J];資源環(huán)境與工程;2012年05期
相關(guān)會(huì)議論文 前10條
1 齊俊修;劉力;劉克賢;楊國(guó)華;;十三陵抽水蓄能電站排風(fēng)兼安全洞圍巖監(jiān)測(cè)及分析[A];巖土力學(xué)數(shù)值方法的工程應(yīng)用——第二屆全國(guó)巖石力學(xué)數(shù)值計(jì)算與模型實(shí)驗(yàn)學(xué)術(shù)研討會(huì)論文集[C];1990年
2 劉寧;朱維申;于廣明;;基于Mohr-Coulomb準(zhǔn)則的初期支護(hù)與圍巖耦合作用分析[A];第六屆海峽兩岸隧道與地下工程學(xué)術(shù)及技術(shù)研討會(huì)論文集[C];2007年
3 倪國(guó)榮;張涵浩;李從眾;;洞潭水電站球岔設(shè)計(jì)及球穴圍巖穩(wěn)定分析[A];第一屆全國(guó)巖石力學(xué)數(shù)值計(jì)算及模型試驗(yàn)討論會(huì)論文集[C];1986年
4 蘇有財(cái);谷婷;朱勇;白志勇;;模糊理論在隧道施工階段圍巖等級(jí)劃分中的應(yīng)用[A];第三屆全國(guó)巖土與工程學(xué)術(shù)大會(huì)論文集[C];2009年
5 揭雋夫;;應(yīng)用圍巖分類(lèi)法評(píng)價(jià)水工地下洞室圍巖穩(wěn)定的認(rèn)識(shí)[A];地下工程經(jīng)驗(yàn)交流會(huì)論文選集[C];1982年
6 仇文革;;隧道仰拱在支護(hù)與圍巖交互作用中機(jī)理的試驗(yàn)研究[A];第二屆全國(guó)青年巖石力學(xué)與工程學(xué)術(shù)研討會(huì)論文集[C];1993年
7 齊俊修;王連捷;劉風(fēng)成;王薇;董誠(chéng);;張河灣蓄能電站模型洞圍巖位移反分析及預(yù)測(cè)研究[A];第一屆中國(guó)水利水電巖土力學(xué)與工程學(xué)術(shù)討論會(huì)論文集(下冊(cè))[C];2006年
8 徐平;夏銘佑;;大型地下洞室群圍巖穩(wěn)定三維彈塑性分析[A];第一屆海峽兩岸隧道與地下工程學(xué)術(shù)與技術(shù)研討會(huì)論文集(上冊(cè))[C];1999年
9 龐永祥;;關(guān)于圓洞層狀圍巖的極向應(yīng)力[A];地下工程經(jīng)驗(yàn)交流會(huì)論文選集[C];1982年
10 孫文召;王丹;李昕;周晶;;水工高壓引水隧洞圍巖穩(wěn)定分析[A];水與水技術(shù)(第一輯)選編[C];2011年
相關(guān)重要報(bào)紙文章 前1條
1 黃寰;成都理工大學(xué)解開(kāi)圍巖監(jiān)測(cè)難題[N];中國(guó)國(guó)土資源報(bào);2003年
相關(guān)博士學(xué)位論文 前7條
1 崔明;隧洞圍巖體力學(xué)參數(shù)演化規(guī)律及工程應(yīng)用研究[D];北京科技大學(xué);2015年
2 劉永平;隧道脆性—準(zhǔn)脆性圍巖連續(xù)損傷特征研究[D];吉林大學(xué);2005年
3 張國(guó)華;基于圍巖累積損傷效應(yīng)的大斷面隧道施工參數(shù)優(yōu)化研究[D];中國(guó)科學(xué)院研究生院(武漢巖土力學(xué)研究所);2010年
4 李景龍;大型地下洞室群工程穩(wěn)定性風(fēng)險(xiǎn)評(píng)估系統(tǒng)及其應(yīng)用研究[D];山東大學(xué);2008年
5 唐雄俊;隧道收斂約束法的理論研究與應(yīng)用[D];華中科技大學(xué);2009年
6 冷先倫;深埋長(zhǎng)隧洞TBM掘進(jìn)圍巖開(kāi)挖擾動(dòng)與損傷區(qū)研究[D];中國(guó)科學(xué)院研究生院(武漢巖土力學(xué)研究所);2009年
7 邵勇;采空區(qū)多災(zāi)耦合作用下的隧道穩(wěn)定性分析[D];南京大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 劉厚銀;深埋隧洞圍巖及支護(hù)結(jié)構(gòu)穩(wěn)定性研究[D];浙江工業(yè)大學(xué);2015年
2 任明洋;籃家?guī)r隧道洞口段圍巖參數(shù)反分析及施工數(shù)值模擬研究[D];蘭州交通大學(xué);2015年
3 李順波;水平緩傾巖層大斷面隧道安全快速施工技術(shù)研究[D];石家莊鐵道大學(xué);2016年
4 俞凱木;應(yīng)力釋放與孔壓作用下圓隧圍巖黏彈性變形解析理論[D];華僑大學(xué);2016年
5 端寧;深部開(kāi)采擾動(dòng)誘發(fā)圍巖應(yīng)力場(chǎng)及能量場(chǎng)演化規(guī)律研究[D];中國(guó)礦業(yè)大學(xué);2016年
6 李俊駿;基于蒙華鐵路九嶺山隧道現(xiàn)場(chǎng)實(shí)驗(yàn)的圍巖穩(wěn)定性研究[D];西南交通大學(xué);2017年
7 汪冬兵;煤礦斜井管片襯砌結(jié)構(gòu)受力分析[D];西南交通大學(xué);2017年
8 林峰;長(zhǎng)距離輸水隧洞TBM掘進(jìn)過(guò)程圍巖穩(wěn)定性研究[D];浙江工業(yè)大學(xué);2013年
9 劉士雨;地下工程圍巖穩(wěn)定性模糊綜合評(píng)價(jià)及其應(yīng)用研究[D];華東交通大學(xué);2009年
10 周學(xué)良;隧道圍巖變形監(jiān)測(cè)與圍巖參數(shù)的反演分析[D];合肥工業(yè)大學(xué);2007年
,本文編號(hào):2392430
本文鏈接:http://www.sikaile.net/kejilunwen/kuangye/2392430.html