原礦倉(cāng)垮塌后的修復(fù)方法研究
[Abstract]:The ore bin is the most important project in metal mines, and it is the throat engineering for the storage and rotation of ore and rock. The stability and safety of the original silo have a great impact on the normal production of the mine. The damage not only affects the production, but also threatens the safety of the whole system. Based on the original silo No. 1 in Xinli Mining area of Sanshandao Gold Mine, the factors of collapse are analyzed and explained, and the technical scheme of restoration and treatment of No. 1 original silo is put forward.
【作者單位】: 山東黃金集團(tuán)有限公司;
【分類(lèi)號(hào)】:TD266
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 黃初皓;石灰礦倉(cāng)隔柵的改進(jìn)[J];礦山機(jī)械;1996年03期
2 蘇蕓;粉礦倉(cāng)除粘破拱的措施[J];礦山機(jī)械;1999年04期
3 劉利勛;相鄰地表礦倉(cāng)的施工[J];建井技術(shù);1991年05期
4 卜盛文;振動(dòng)技術(shù)在細(xì)礦倉(cāng)的應(yīng)用[J];有色金屬(選礦部分);1998年03期
5 吳忠群;李剛;吉萬(wàn)健;;礦倉(cāng)清阻系統(tǒng)的研制與應(yīng)用[J];現(xiàn)代礦業(yè);2012年06期
6 李英武;淺倉(cāng)—抓斗組合式礦倉(cāng)設(shè)計(jì)[J];化工礦山技術(shù);1982年03期
7 鄭淦芳 ,陳文貴;矩形礦倉(cāng)有效容積設(shè)計(jì)計(jì)算問(wèn)題[J];化工礦山技術(shù);1975年06期
8 陳云釗;;坑下破碎礦倉(cāng)設(shè)計(jì)中幾個(gè)問(wèn)題的商榷[J];河北冶金;1981年02期
9 梁艇棟;陳懷利;張海軍;;礦倉(cāng)聯(lián)合加固新技術(shù)[J];金屬礦山;2009年S1期
10 曹躍進(jìn);;某礦山儲(chǔ)礦倉(cāng)破壞及加固[J];現(xiàn)代礦業(yè);2012年01期
相關(guān)會(huì)議論文 前3條
1 童輝;;鋁礦山成品礦倉(cāng)防黏防堵技術(shù)研究與應(yīng)用[A];礦山企業(yè)節(jié)能減排與循環(huán)經(jīng)濟(jì)高峰論壇論文集[C];2010年
2 梁艇棟;陳懷利;張海軍;;礦倉(cāng)聯(lián)合加固新技術(shù)[A];第八屆全國(guó)采礦學(xué)術(shù)會(huì)議論文集[C];2009年
3 焦永富;;主井貯礦倉(cāng)的注漿治水[A];2005年全國(guó)金屬礦山采礦學(xué)術(shù)研討與技術(shù)交流會(huì)論文集[C];2005年
,本文編號(hào):2155216
本文鏈接:http://www.sikaile.net/kejilunwen/kuangye/2155216.html