斜井管片結(jié)構(gòu)下方保護(hù)煤柱尺寸設(shè)計(jì)的離散元分析
本文選題:斜井 切入點(diǎn):保護(hù)煤柱 出處:《北京交通大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
【摘要】:目前,我國乃至世界上的大多數(shù)國家主要采用留設(shè)煤柱的方法來保護(hù)煤礦中的各類巷道。然而,此方法雖然可以對(duì)巷道起到良好的保護(hù)作用,但是同時(shí)保護(hù)煤柱的回收卻較為困難,浪費(fèi)了大量的資源。因此,研究護(hù)巷煤柱留設(shè)的寬度,使其既有利于受護(hù)巷道的穩(wěn)定性與安全性,也能盡可能地提高礦區(qū)資源的回采率,具有普遍的經(jīng)濟(jì)效益與社會(huì)意義。 新街礦區(qū)斜井井筒采用TBM工法進(jìn)行施工。本文以新街礦區(qū)的煤層開采設(shè)計(jì)問題為背景,分析煤層開采過程中斜井管片結(jié)構(gòu)的內(nèi)力與位移的變化特征,確定保護(hù)煤柱的合理尺寸。經(jīng)驗(yàn)公式法只籠統(tǒng)地涉及煤層的幾何參數(shù)與力學(xué)性質(zhì),而數(shù)值模擬則可同時(shí)考慮煤層、巖層、斜井結(jié)構(gòu)的幾何特征與力學(xué)特征。 本文采用離散元數(shù)值模擬的方法,主要研究內(nèi)容與成果如下: (1)采用UDEC軟件,選取斜井不同位置的斷面,在3-1煤層中預(yù)先假設(shè)多個(gè)煤柱寬度值,模擬從遠(yuǎn)及近的分步開采過程。針對(duì)不同保護(hù)煤柱寬度,分析斜井結(jié)構(gòu)的受力與變位,在煤柱寬度能使斜井結(jié)構(gòu)滿足安全性與穩(wěn)定性要求的前提下,取其最小值作為斜井保護(hù)煤柱的建議寬度取值。在此過程中,發(fā)現(xiàn)回采工作面與斜井的水平距離越小,斜井結(jié)構(gòu)受力狀態(tài)越不利,變位也越大;斜井與開采煤層的豎向距離越大,斜井結(jié)構(gòu)受力狀態(tài)越有利,變位反而越大。同時(shí),UDEC軟件直接模擬得出煤層開采時(shí),節(jié)理產(chǎn)生滑移的區(qū)域,獲得巖層破裂角δ為76。。 (2)在二維模擬的基礎(chǔ)上,結(jié)合斜井傾角6。,綜合幾何關(guān)系可得煤層工作面與斜井軸線在水平面上的夾角為1.53。,以該角度留設(shè)煤柱,采用與二維模擬分析類似的方法,對(duì)斜井落底處的一個(gè)回采工作面范圍進(jìn)行三維模擬(3DEC)。模擬結(jié)果表明:開采方向取工作面與斜井軸向平行時(shí)(有1.53°的夾角)對(duì)斜井結(jié)構(gòu)的安全與穩(wěn)定較為有利;先后開采的上、下煤層中的煤柱寬度取值之間影響很大,如上層3-1取40m,則下層5-1中最少需留86m,若3-1煤中取50m,則5-1煤中僅需67m。 (3)以三維固體模型為基礎(chǔ),采用完全流固耦合的方法,模擬流體在裂隙中流動(dòng)時(shí)的煤層開采,將流固耦合模擬結(jié)果與三維固體力學(xué)結(jié)果進(jìn)行對(duì)比分析,可以得出由于流體的存在,使得斜井結(jié)構(gòu)受力較無流體時(shí)不利,位移反而變小,但同時(shí)位移不均勻程度加大,最終取代斜井結(jié)構(gòu)的受力成為煤柱寬度取值的控制條件。
[Abstract]:At present, most countries in our country and even in the world mainly adopt the method of keeping coal pillar to protect all kinds of roadways in coal mine. However, although this method can play a good role in protecting the roadway, But at the same time, it is difficult to recover coal pillar and waste a lot of resources. Therefore, the study on the width of coal pillar retaining roadway is not only beneficial to the stability and safety of protected roadway, but also can improve the recovery rate of mining area resources as much as possible. It has universal economic benefit and social significance. The inclined shaft of Xinjie mining area is constructed by TBM method. Based on the design of coal seam mining in Xinjie mining area, the variation characteristics of internal force and displacement of inclined shaft segment structure during coal seam mining are analyzed in this paper. The empirical formula method only deals with the geometric parameters and mechanical properties of coal seam in general, while the numerical simulation can also consider the geometric and mechanical characteristics of coal seam, rock formation and inclined shaft structure. In this paper, the discrete element numerical simulation method is used. The main research contents and results are as follows:. 1) adopting UDEC software, selecting cross section of inclined shaft at different position, presupposing several pillar width values in 3-1 coal seam, simulating step by step mining process from far to near. According to different protection pillar width, the force and displacement of inclined shaft structure are analyzed. On the premise that the width of coal pillar can make the structure of inclined shaft meet the requirement of safety and stability, the minimum value is taken as the recommended width of pillar protection for inclined shaft. In this process, it is found that the horizontal distance between mining face and inclined shaft is smaller. The greater the vertical distance between inclined well and open coal seam, the more favorable the stress state of inclined well structure is, and the greater the displacement is. At the same time, the UDEC software directly simulates the coal seam mining. The fracture angle 未 is 76. 2) on the basis of two-dimensional simulation, combined with inclined angle of inclined shaft, the angle between coal seam face and inclined shaft axis in horizontal plane is 1.53.The coal pillar is set up with this angle, and a method similar to that of two-dimensional simulation analysis is adopted. A 3D simulation of a mining face range at the bottom of a inclined shaft is carried out. The simulation results show that when the mining direction is parallel to the axial direction of the inclined shaft (with an angle of 1.53 擄), the safety and stability of the inclined shaft structure is more favorable; The width of coal pillar in the lower coal seam has a great influence, such as 40m for upper layer 3-1, minimum 86m for lower layer 5-1, and 67m for 5-1 coal if 50m in 3-1 coal. On the basis of three-dimensional solid model, the method of complete fluid-solid coupling is used to simulate coal seam mining when fluid flows in a fissure. The results of fluid-solid coupling simulation are compared with those of three-dimensional solid mechanics. It can be concluded that because of the existence of fluid, the stress of inclined shaft structure is less than that of no fluid, and the displacement becomes smaller, but at the same time, the degree of non-uniformity of displacement is increased, so the stress of inclined shaft structure is replaced by the stress of inclined well structure as the control condition of the width of coal pillar.
【學(xué)位授予單位】:北京交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD822.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王者堯;斜井施工的配套設(shè)施[J];江蘇煤炭;1993年02期
2 張佳文;斜井安全裝置的研究與應(yīng)用[J];西部探礦工程;1994年06期
3 韓靜玉;;磨溝嶺隧道橡子溝斜井施工技術(shù)[J];西部探礦工程;2006年02期
4 張付立;楊進(jìn)軍;張自新;胡亞偉;;明斜井穿越老斜井施工方法[J];建井技術(shù);2012年04期
5 張錦鵬;魏春榮;;斜井施工安全評(píng)價(jià)研究[J];建井技術(shù);2013年02期
6 王劍武;;大坡度斜井施工工藝簡(jiǎn)介[J];西部探礦工程;1993年02期
7 高中山,,朱柏石;斜井施工設(shè)備最優(yōu)配套方案選擇的網(wǎng)絡(luò)方法[J];東北煤炭技術(shù);1994年01期
8 崔增祁,賽云秀;我國斜井施工現(xiàn)狀及存在問題[J];建井技術(shù);1997年01期
9 安永林;勘探斜井施工安全管理體會(huì)[J];西部探礦工程;2005年S1期
10 寧掌玄;馬迎松;馬志明;;東周窯礦斜井施工模擬優(yōu)化研究[J];水利與建筑工程學(xué)報(bào);2011年02期
相關(guān)會(huì)議論文 前10條
1 王建強(qiáng);;長梁山隧道東溝斜井施工計(jì)劃完成進(jìn)度情況分析[A];第九屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅲ卷[C];2000年
2 王怡;王芝銀;馬蘭平;曾志華;;管道穿越黃土陡坡斜井工程穩(wěn)定性分析[A];第二屆中國水利水電巖土力學(xué)與工程學(xué)術(shù)討論會(huì)論文集(一)[C];2008年
3 葛惠永;白鳳忠;申建紅;喬光磊;;斜井施工技術(shù)的發(fā)展與實(shí)踐[A];礦山建設(shè)工程新進(jìn)展——2005全國礦山建設(shè)學(xué)術(shù)會(huì)議文集(下冊(cè))[C];2005年
4 馬棟;黃立新;;長梁山隧道3#斜井快速施工機(jī)械配套技術(shù)[A];第九屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅲ卷[C];2000年
5 劉樹明;;有軌斜井運(yùn)輸安全保障體系研究[A];第九屆海峽兩岸隧道與地下工程學(xué)術(shù)及技術(shù)研討會(huì)論文集[C];2010年
6 王曉建;;深斜井高精度反井施工技術(shù)[A];礦山建設(shè)工程新進(jìn)展——2006全國礦山建設(shè)學(xué)術(shù)會(huì)議文集(上冊(cè))[C];2006年
7 薛模美;胡恒福;白偉;;客運(yùn)專線隧道斜井轉(zhuǎn)正洞施工技術(shù)[A];客運(yùn)專線工程技術(shù)學(xué)術(shù)研討會(huì)論文集(上)[C];2008年
8 張立軍;;烏鞘嶺特長隧道3~#斜井改進(jìn)設(shè)計(jì)與施工[A];鐵路長大隧道設(shè)計(jì)施工技術(shù)研討會(huì)論文集[C];2004年
9 張劍;;談?wù)劄跚蕩X隧道的斜井設(shè)計(jì)[A];甘肅省科協(xié)年會(huì)鐵道分會(huì)場(chǎng)“蘭武二線建設(shè)研討會(huì)”論文集[C];2004年
10 錢永平;王仕虎;;反井鉆機(jī)在惠州抽水蓄能電站長斜井導(dǎo)井施工中的應(yīng)用[A];抽水蓄能電站工程建設(shè)文集2011[C];2011年
相關(guān)重要報(bào)紙文章 前10條
1 馬瑞斌 周吉明 丁寧;三公司西二線東段18標(biāo)段完成斜井施工[N];石油管道報(bào);2010年
2 王顯峰 賈樂;三公司西二線東段斜井穿越順利完成[N];石油管道報(bào);2010年
3 通訊員 向奇志 麻成標(biāo);全球首臺(tái)煤礦斜井掘進(jìn)機(jī)下線[N];中國鐵道建筑報(bào);2013年
4 記者 章盛莉 通訊員 趙嵩;295米斜井助力長株潭城鐵[N];長沙晚報(bào);2011年
5 本報(bào)通訊員 王俊杰 許波;獨(dú)辟蹊徑 柳暗花明[N];石油管道報(bào);2010年
6 王洋;七千里陸橋一洞開[N];中國鐵道建筑報(bào);2004年
7 劉鐵男 記者 趙蘊(yùn)穎;大連地鐵214標(biāo)段增挖斜井[N];大連日?qǐng)?bào);2011年
8 周廣寬;智慧作犁開坦途[N];中國鐵道建筑報(bào);2007年
9 通訊員 朱洪山 周金龍 秦德;貴廣鐵路上興隧道提前勝利貫通[N];中華建筑報(bào);2010年
10 通訊員 朱立鵬 洪曉強(qiáng);十二局集團(tuán)二公司從“金點(diǎn)子”里摳出金子[N];中國鐵道建筑報(bào);2011年
相關(guān)碩士學(xué)位論文 前6條
1 郗征;厚表土長斜井快速施工關(guān)鍵技術(shù)研究[D];西安工業(yè)大學(xué);2012年
2 汪頌暉;斜井穿越松散土層的支護(hù)技術(shù)研究[D];西安工業(yè)大學(xué);2012年
3 章劍;軟弱圍巖斜井轉(zhuǎn)正洞工法動(dòng)態(tài)施工力學(xué)行為分析[D];西南交通大學(xué);2013年
4 楊旭;斜井管片結(jié)構(gòu)下方保護(hù)煤柱尺寸設(shè)計(jì)的離散元分析[D];北京交通大學(xué);2015年
5 李智溢;公路隧道利用斜井快速施工組織研究[D];長安大學(xué);2009年
6 王東洋;大斷面斜井穿越采空區(qū)支護(hù)技術(shù)研究[D];湖南科技大學(xué);2014年
本文編號(hào):1616279
本文鏈接:http://www.sikaile.net/kejilunwen/kuangye/1616279.html