長江科學院承擔的幾江長江大橋北岸隧道錨巖土專項試驗圓滿完成現(xiàn)場工作
發(fā)布時間:2019-01-08 12:45
【摘要】:正長江科學院重慶巖基研究中心承擔的幾江長江大橋北岸隧道錨巖土專項試驗項目,已于2014年11月初圓滿完成現(xiàn)場工作。該項目得到了委托單位和設(shè)計單位的高度評價。試驗過程中多個相關(guān)單位到現(xiàn)場參觀學習。重慶江津幾江大橋位于長江邊的千年古城江津,江津是聶榮臻元帥故鄉(xiāng),地處重慶"一小時經(jīng)濟圈"核心區(qū)域和成渝經(jīng)濟區(qū)的重要承接點,幾江大橋是重慶市規(guī)劃建設(shè)"一江兩岸"區(qū)域性中心大城市以及"雙百"現(xiàn)代化大城市的關(guān)鍵性工程。幾江大橋全長1 738 m,主跨為600 m的懸索橋,主梁結(jié)構(gòu)采用鋼箱梁。大橋
[Abstract]:The pilot project of anchoring rock and soil in the north bank of the Yangtze River Bridge in Chongqing Rock Foundation Research Center of the Yangtze River Academy of Sciences has been successfully completed in early November 2014. The project was highly evaluated by the entrustment unit and the design unit. During the course of the test, many related units visit and study on the spot. The Qijiang Bridge of Jiang Jin in Chongqing is located in the ancient city of Jiang Jin on the edge of the Yangtze River, which is the hometown of Field Marshal Jiang Jin. It is located in the core region of Chongqing's "one hour economic circle" and an important undertaking point in the Chengdu-Chongqing Economic Zone. Jijiang Bridge is a key project for Chongqing's planning and construction of "one River and two sides" regional center city and "double hundred" modernization city. The main span of Jijiang Bridge is 1 738 m and the main span is 600 m. The main girder structure is steel box girder. Bridge
【分類號】:U448.25;U451.5
本文編號:2404616
[Abstract]:The pilot project of anchoring rock and soil in the north bank of the Yangtze River Bridge in Chongqing Rock Foundation Research Center of the Yangtze River Academy of Sciences has been successfully completed in early November 2014. The project was highly evaluated by the entrustment unit and the design unit. During the course of the test, many related units visit and study on the spot. The Qijiang Bridge of Jiang Jin in Chongqing is located in the ancient city of Jiang Jin on the edge of the Yangtze River, which is the hometown of Field Marshal Jiang Jin. It is located in the core region of Chongqing's "one hour economic circle" and an important undertaking point in the Chengdu-Chongqing Economic Zone. Jijiang Bridge is a key project for Chongqing's planning and construction of "one River and two sides" regional center city and "double hundred" modernization city. The main span of Jijiang Bridge is 1 738 m and the main span is 600 m. The main girder structure is steel box girder. Bridge
【分類號】:U448.25;U451.5
【相似文獻】
相關(guān)重要報紙文章 前7條
1 記者 龍丹梅;今年1100戶居民實現(xiàn)一戶一表[N];重慶日報;2014年
2 潘艷 周其維 黃豁 新華社專稿;江津:入室劫犯牽出私分國資800萬大案[N];新華每日電訊;2004年
3 本報通訊員 王昌旭;守得云開見日出[N];中國氣象報;2011年
4 羅文 張亞飛 劉前;江津濱江新城:重慶二環(huán)線上的一顆璀璨“明珠”[N];重慶日報;2012年
5 華官林 李俊;江津 協(xié)力建設(shè)渝西教育高地[N];重慶日報;2009年
6 記者 周雨 特約通訊員 鄧紹祥 實習生 周娟美;江津努力打造區(qū)域性交通樞紐[N];重慶日報;2006年
7 袁孝春 楊慶宇 王琳琳;江津 濱江新城進入“城熟”新時期[N];重慶日報;2014年
,本文編號:2404616
本文鏈接:http://www.sikaile.net/kejilunwen/jiaotonggongchenglunwen/2404616.html
教材專著