盾構(gòu)誘發(fā)的地表及鄰近建筑物變形規(guī)律研究
[Abstract]:The purpose of this paper is to use FLAC simulation to predict the deformation law of the ground surface and nearby buildings caused by shield tunneling based on the shield engineering of a certain section of Beijing Metro Line 8. It provides technical support for the determination of reasonable construction parameters and the formulation of on-site monitoring scheme for shield tunnel construction safely through surface buildings. The conclusions are as follows: (1) numerical simulation is used to get the law of surface deformation caused by shield tunneling in Beijing subway tunnel. The lateral settlement curve of the ground surface is symmetrical in the horizontal direction, and the building has a great influence on the surface deformation in the surrounding area. The influence on the surface deformation of the area is relatively small, and the maximum differential settlement is 80.09 mm;. (2) the results of numerical simulation and prediction show that the influence range of the excavation on the surface of the two tunnels is mainly about 36 m each in the center of the two tunnels, and the influence area of the excavating surface is within 24 m in front of the excavating surface and 20 m behind the excavating surface. (3) practice shows that the measured curve is in good agreement with the numerical simulation curve, and the numerical simulation is an effective method to predict the influence of shield construction on the deformation of the surface and adjacent buildings. (4) the research results can be used to formulate the deformation control scheme of the ground adjacent buildings during the shield tunneling construction.
【作者單位】: 西安科技大學(xué);
【基金】:陜西省教育廳自然科學(xué)專項(2010JK667)資助
【分類號】:U455.43
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李宏安;;北京地鐵隧道盾構(gòu)施工的監(jiān)理要點[J];市政技術(shù);2007年06期
2 陳春林;房延利;;盾構(gòu)施工通風(fēng)的初步探討[J];山西建筑;2010年16期
3 成廣謀;;杭州地鐵1號線九—下盾構(gòu)區(qū)間施工技術(shù)[J];山西建筑;2010年11期
4 金花;張碧;孫立功;;天津地鐵二號線盾構(gòu)施工測量技術(shù)的應(yīng)用研究[J];寧夏工程技術(shù);2011年01期
5 李曙光;馮小玲;方理剛;;盾構(gòu)法地鐵隧道施工數(shù)值模擬[J];鐵道標(biāo)準(zhǔn)設(shè)計;2009年03期
6 金磊;;地鐵隧道盾構(gòu)施工質(zhì)量監(jiān)控(上)[J];建筑機械化;2009年06期
7 酈亮;;北京地鐵10號線盾構(gòu)對周邊土體擾動模擬分析[J];施工技術(shù);2010年05期
8 杜建華;沈紅云;;廣州地鐵復(fù)雜地質(zhì)條件下的土壓平衡盾構(gòu)掘進(jìn)技術(shù)研究[J];隧道建設(shè);2006年04期
9 高峰;陳俊林;;道路隧道盾構(gòu)施工對既有地鐵隧道的影響分析[J];現(xiàn)代隧道技術(shù);2008年S1期
10 劉新龍;符敏;付強;;黃土盾構(gòu)施工對周圍土體變形的影響[J];路基工程;2007年06期