外海防波堤大規(guī)模扭王字塊安裝技術(shù)與控制
[Abstract]:It is difficult to control the quality of the writhing block in the offshore breakwater. In the construction process, due to the wind and waves, the surge is greatly affected, the working time is short, and the schedule control is difficult. Especially, the installation of the large-scale writhing block, the quality and schedule are related to the structural safety of the breakwater during the construction process. Taking the coal wharf and embankment project of Hongshan Thermal Power Plant as an example, this paper introduces and summarizes the technology and control measures adopted in the installation of large-scale wrist-wangzhuang block.
【作者單位】: 中交第三航務(wù)工程局有限公司廈門分公司;
【分類號(hào)】:U656.2
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳現(xiàn)榮;扭王字塊制安的質(zhì)量控制[J];水運(yùn)工程;1999年05期
2 鄧鑒;;扭王塊安裝技術(shù)[J];建材與裝飾(中旬刊);2008年06期
3 閆瀟瀚;;遼河油田海南八人工島工程扭王字塊安裝施工技術(shù)[J];科技資訊;2011年18期
4 ;水工建筑物及其維修與擴(kuò)建[J];水路運(yùn)輸文摘;1999年12期
5 沈雪松;大型扭王字塊施工技術(shù)[J];水運(yùn)工程;1998年02期
6 楊志雄,王煒;防波堤護(hù)面扭王字塊定點(diǎn)安放工藝[J];水運(yùn)工程;2002年06期
7 ;水工建筑物及其維修與擴(kuò)建[J];水路運(yùn)輸文摘;1998年06期
8 葉亦林;;珠海港南涇灣防波堤工程管理[J];華南港工;1998年01期
9 ;水工建筑物及其維修與擴(kuò)建[J];水路運(yùn)輸文摘;2000年04期
10 郭文鑫;趙劉群;;對規(guī)范JTJ 298—1998的幾點(diǎn)建議[J];水運(yùn)工程;2011年07期
相關(guān)會(huì)議論文 前3條
1 趙云鵬;李玉成;馬小舟;董國海;;斜向浪作用下斜坡式防波堤上扭王字塊體穩(wěn)定性試驗(yàn)研究[A];第十四屆中國海洋(岸)工程學(xué)術(shù)討論會(huì)論文集(上冊)[C];2009年
2 孫精石;陳漢寶;王占英;;削角王字塊壓頂斜坡堤特點(diǎn)及應(yīng)用[A];第十二屆中國海岸工程學(xué)術(shù)討論會(huì)論文集[C];2005年
3 呂海波;孔令偉;汪稔;;瓊州海峽鐵路輪渡北港防波堤爆破擠淤施工出現(xiàn)的問題及對策[A];2002年中國西北部重大工程地質(zhì)問題論壇論文集[C];2002年
相關(guān)重要報(bào)紙文章 前3條
1 關(guān)林吉;追逐藍(lán)色的夢想[N];中華建筑報(bào);2009年
2 本報(bào)記者 袁曉金;建設(shè)工地?zé)峄鸪?施工進(jìn)度順利推進(jìn)[N];潮州日報(bào);2011年
3 記者 阮冰瑩;亞太碼頭項(xiàng)目完成投資3.44億[N];潮州日報(bào);2011年
,本文編號(hào):2340056
本文鏈接:http://www.sikaile.net/kejilunwen/jiaotonggongchenglunwen/2340056.html