承壓型端錨高預(yù)緊力錨桿支護(hù)技術(shù)研究
[Abstract]:In order to solve the problems existing in the surrounding rock support of deep buried soft tunnel, such as difficult to apply pre-tightening force of anchor rod, low bearing capacity and poor effect of initial active support, In this paper, a new type of bolting support for tunnel surrounding rock is put forward, that is, pressure-bearing end anchor with high pretightening force. In this paper, theoretical derivation, numerical simulation and model experiment are used to study and analyze the anchoring principle, structure form, construction technology and shear stress distribution of high pretension anchor bolt in surrounding rock support. The main conclusions are as follows: 1) the pressure-type end anchor with high pretightening force is a combination of the rapid setting characteristics of resin coils and the good pressure-bearing performance of cement mortar after setting. High strength pretension initial support and a new support technique for sustained stability of anchoring force. 2) the pressure-type end anchor with high pretension bolt has no free adhesion, and the pre-tightening force is significantly increased, and the anchor rod only has to wait about 25 seconds for the resin gelation time. The initial pretightening force can be applied to the initial quick supporting effect of surrounding rock. 3) the bearing capacity of the pressure-type end anchor with high pretension is higher than that of the grouting anchor, and the supporting performance is better than that of the existing grouting anchor. And two kinds of anchors have opposite anchoring position to surrounding rock. 4) the optimum hole diameter of pressure-bearing end anchor with high pretightening force is 75mm. Under this aperture, the anchor rod can not only provide higher bearing capacity, but also guarantee better engineering economic benefit. The Anchorage length of the best resin coils is 0.2 m and the best grouting length is 0.4m ~ 5) the smaller the E _ (a / E) / E / E _ c, the larger the distribution length of shear stress and the lower the peak value of shear stress, and the higher the bearing capacity of bolt is, the better the supporting effect of surrounding rock is.
【學(xué)位授予單位】:中國(guó)礦業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類號(hào)】:U455.71
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王澄溪;;預(yù)緊力隨運(yùn)轉(zhuǎn)條件變化的主軸結(jié)構(gòu)[J];裝備機(jī)械;1980年02期
2 王慶竹;;機(jī)載導(dǎo)彈吊掛預(yù)緊力的確定及其對(duì)內(nèi)力分布的影響[J];戰(zhàn)術(shù)導(dǎo)彈技術(shù);1985年03期
3 苗德華,唐萬(wàn)有,李亞平;自行車車條預(yù)緊力的確定及車條直徑的設(shè)計(jì)方法[J];力學(xué)與實(shí)踐;1992年03期
4 李杰;梁曉慧;李海玄;李峰;吳曉亮;;推力圓柱滾子軸承預(yù)緊力的測(cè)量和計(jì)算[J];制造技術(shù)與機(jī)床;2011年11期
5 付振山;馮顯英;于春玲;;滾珠型弧面分度凸輪機(jī)構(gòu)的預(yù)緊分析[J];北京工業(yè)大學(xué)學(xué)報(bào);2013年04期
6 韋清芳;;螺釘預(yù)緊力對(duì)精密零件裝配變形的影響[J];機(jī)械設(shè)計(jì)與制造;2013年05期
7 郭壽寧;;10000噸多向模鍛水壓機(jī)水平框架預(yù)緊力不足的分析與處理[J];重型機(jī)械;1981年11期
8 陳尚齊;;液壓機(jī)立柱預(yù)緊問(wèn)題的探討[J];重型機(jī)械;1986年10期
9 郭春華;;組合式機(jī)架用立柱、機(jī)架液壓預(yù)緊裝置[J];重型機(jī)械;1987年12期
10 常秋英;楊沛然;;預(yù)緊力對(duì)內(nèi)燃機(jī)排氣凸輪/挺柱間潤(rùn)滑的影響研究[J];潤(rùn)滑與密封;2007年02期
相關(guān)會(huì)議論文 前10條
1 裴瑞光;謝旭輝;陳豪麟;張振;肖毅;;復(fù)合材料緊固件連接的預(yù)緊力松弛行為[A];中國(guó)力學(xué)大會(huì)——2013論文摘要集[C];2013年
2 楊敏;潘亦蘇;黎啟勝;;預(yù)緊雙層環(huán)的粘彈性效應(yīng)分析[A];第15屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅰ冊(cè))[C];2006年
3 周幫友;杜強(qiáng);徐有剛;;不同預(yù)緊力下連接懸臂梁動(dòng)態(tài)特性試驗(yàn)研究[A];第十二屆全國(guó)實(shí)驗(yàn)力學(xué)學(xué)術(shù)會(huì)議論文摘要集[C];2009年
4 王巖祿;;大型水輪發(fā)電機(jī)磁極鐵心片間壓力與受預(yù)緊力關(guān)系[A];水電站機(jī)電技術(shù)2004年年會(huì)論文集[C];2004年
5 李明濤;國(guó)偉;陳彥輝;李菊香;孫小超;;螺栓預(yù)緊型軌道發(fā)射裝置設(shè)計(jì)研究[A];2011中國(guó)電工技術(shù)學(xué)會(huì)學(xué)術(shù)年會(huì)論文集[C];2011年
6 李廣文;;配對(duì)軸承預(yù)緊力分析及測(cè)試方法[A];加入WTO和中國(guó)科技與可持續(xù)發(fā)展——挑戰(zhàn)與機(jī)遇、責(zé)任和對(duì)策(下冊(cè))[C];2002年
7 李偉;王芳;田玉江;王上原;王亞偉;;深水法蘭連接機(jī)具螺栓預(yù)緊方法及裝置研究[A];2012年中國(guó)造船工程學(xué)會(huì)學(xué)術(shù)論文集[C];2012年
8 卓新;裘毅沖;吳飛;;安裝預(yù)緊力對(duì)浮頭式點(diǎn)式玻璃幕墻承載性能的影響[A];施工技術(shù)交流論文集[C];2005年
9 劉宇飛;王琳琳;張健;;單柱立車工作臺(tái)預(yù)緊力試驗(yàn)研究[A];第三屆十省區(qū)市機(jī)械工程學(xué)會(huì)科技論壇暨黑龍江省機(jī)械工程學(xué)會(huì)2007年年會(huì)論文(摘要)集[C];2007年
10 葉慶衛(wèi);汪同慶;葉俊勇;;基于振動(dòng)信號(hào)時(shí)頻熵特征的輕軌在役錨固螺桿預(yù)緊力變化檢測(cè)[A];2006年西南地區(qū)第九屆NDT學(xué)術(shù)年會(huì)暨2006年全國(guó)射線檢測(cè)新技術(shù)研討會(huì)論文集[C];2006年
相關(guān)重要報(bào)紙文章 前2條
1 駐江蘇記者杜小衛(wèi) 通訊員孫峰;南京中材備件簽下越南1200萬(wàn)元采購(gòu)大單[N];中國(guó)建材報(bào);2012年
2 李平;農(nóng)用車保養(yǎng)8誤區(qū)[N];河北農(nóng)民報(bào);2007年
相關(guān)博士學(xué)位論文 前1條
1 董曉傳;大型液壓機(jī)組合部件的臨界預(yù)緊力研究[D];燕山大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 姚陽(yáng);液壓機(jī)組合橫梁臨界預(yù)緊力研究[D];燕山大學(xué);2015年
2 孫錕;空間角接觸球軸承的預(yù)緊載荷演化機(jī)理研究[D];燕山大學(xué);2015年
3 李偉光;汽車發(fā)動(dòng)機(jī)缸體缸蓋結(jié)合面密封性研究[D];長(zhǎng)安大學(xué);2015年
4 吳嘉錕;螺栓預(yù)緊序列與機(jī)床精度保持的相關(guān)性研究[D];大連理工大學(xué);2015年
5 王俊提;新型揭蓋及清掃機(jī)械人結(jié)構(gòu)分析與導(dǎo)輪預(yù)緊力計(jì)算[D];南京理工大學(xué);2016年
6 王立;高速滾珠絲杠副預(yù)緊力喪失對(duì)比試驗(yàn)及綜合性能研究[D];南京理工大學(xué);2016年
7 孫劍波;某型內(nèi)燃機(jī)連桿的可靠性分析[D];燕山大學(xué);2016年
8 胡立;承壓型端錨高預(yù)緊力錨桿支護(hù)技術(shù)研究[D];中國(guó)礦業(yè)大學(xué);2016年
9 孫雪峰;提高錨桿預(yù)緊力技術(shù)及裝置的研究[D];湖南科技大學(xué);2014年
10 金寧寧;角接觸球軸承預(yù)緊力與系統(tǒng)固有頻率關(guān)系的研究[D];河南科技大學(xué);2011年
,本文編號(hào):2198300
本文鏈接:http://www.sikaile.net/kejilunwen/jiaotonggongchenglunwen/2198300.html