天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 鑄造論文 >

PC50型數(shù)控鏜銑床升級改造

發(fā)布時(shí)間:2018-07-23 19:48
【摘要】:PC50型數(shù)控鏜銑床是西安煤機(jī)公司從美國進(jìn)口的數(shù)控機(jī)床,是公司加工搖臂、牽引部、連接架等部件的主要設(shè)備。經(jīng)過二十多年使用,機(jī)床可靠性和加工精度降低,控制系統(tǒng)老化,故障高。本文在西安煤機(jī)公司PC50型數(shù)控鏜銑床升級改造專項(xiàng)支持下,對升級改造的關(guān)鍵技術(shù)進(jìn)行研究,使機(jī)床恢復(fù)到同類型新購設(shè)備相同的加工能力。本文主要從以下三個方面對機(jī)床升級改造過程進(jìn)行論述:(1)檢測PC50型數(shù)控鏜銑床技術(shù)參數(shù)現(xiàn)狀,綜合分析,制定升級技術(shù)要求,完成總體機(jī)床升級改造整體方案設(shè)計(jì)。在此基礎(chǔ)上,確定詳細(xì)的機(jī)械單元維修、電氣改造、升級改造方案。(2)研究制定詳細(xì)的機(jī)床伺服驅(qū)動、數(shù)控系統(tǒng)升級改造方案,完成驅(qū)動電機(jī)、滾珠絲杠、軸承、測量等關(guān)鍵部件選型設(shè)計(jì),選擇合適的數(shù)據(jù)系統(tǒng)并開發(fā)調(diào)試。(3)針對機(jī)床升級技術(shù)要求,根據(jù)選配的全新數(shù)控、電氣硬件,對機(jī)床電氣控制部分進(jìn)行設(shè)計(jì),分析原有機(jī)床動作順序與流程,完成機(jī)床輔助動作、保護(hù)裝置、液壓系統(tǒng)等功能單元的控制程序開發(fā)工作。本文所研究的升級改造技術(shù),有效提升了PC50型數(shù)控鏜銑床的功能和加工精度,達(dá)到了預(yù)期目標(biāo),也為西安煤機(jī)公司后續(xù)設(shè)備升級改造積累了經(jīng)驗(yàn)。
[Abstract]:PC50 type NC boring and milling machine is imported from the United States by Xi'an Coal Machine Co., Ltd. It is the main equipment of the company to process rocker arm, traction part, connecting frame and so on. After more than 20 years of use, the machine tool reliability and machining accuracy are reduced, the control system is aging, and the fault is high. With the support of PC50 type NC boring and milling machine of Xi'an Coal Machine Company, the key technology of upgrading and transformation is studied in this paper, so that the machine tool can be restored to the same processing capacity as the same type of newly purchased equipment. This paper mainly discusses the upgrading process of machine tool from the following three aspects: (1) detecting the status quo of technical parameters of PC50 type NC boring and milling machine, synthetically analyzing, formulating the upgrade technical requirements, and completing the overall scheme design of upgrading and upgrading of the overall machine tool. On this basis, the detailed mechanical unit maintenance, electrical transformation and upgrading scheme are determined. (2) the detailed machine tool servo drive, numerical control system upgrade plan, drive motor, ball screw, bearing, The key parts such as measurement are selected, the suitable data system is selected and the debugging is developed. (3) according to the new NC and electrical hardware, the electrical control part of the machine tool is designed according to the technical requirements of the machine tool upgrade. This paper analyzes the sequence and flow of the original machine tool, and completes the development of the control program of the function unit of the machine tool auxiliary action, protection device, hydraulic system and so on. The upgrading technology studied in this paper has effectively improved the function and machining accuracy of PC50 type NC boring and milling machine, achieved the expected goal, and accumulated experience for the subsequent equipment upgrading and transformation of Xi'an Coal Machine Company.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TG659

【參考文獻(xiàn)】

相關(guān)期刊論文 前5條

1 曹宏;;數(shù)控機(jī)床改造方案的選擇[J];電子世界;2013年04期

2 徐濱士;;再制造工程的現(xiàn)狀與前沿[J];材料熱處理學(xué)報(bào);2010年01期

3 廖紹華;陳時(shí)權(quán);李國龍;劉飛;;機(jī)床綜合再制造服務(wù)模式及實(shí)踐[J];金屬加工(冷加工);2009年20期

4 田國富;陳寶慶;張輝;張金興;鄭尚龍;;我國工程機(jī)械實(shí)施再制造的可行性分析[J];中國表面工程;2006年S1期

5 徐正平;西門子840D數(shù)控系統(tǒng)[J];機(jī)電一體化;1998年03期

相關(guān)碩士學(xué)位論文 前1條

1 丁卓;我國數(shù)控機(jī)床行業(yè)關(guān)鍵成功因素分析[D];清華大學(xué);2009年

,

本文編號:2140461

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/jiagonggongyi/2140461.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶4b9e4***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com