天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 地質論文 >

泊江海子煤礦井工開采引起地表變形的問題研究

發(fā)布時間:2018-03-22 10:15

  本文選題:地表變形 切入點:礦山地質環(huán)境 出處:《中國地質大學(北京)》2015年碩士論文 論文類型:學位論文


【摘要】:煤礦井工開采過程中會產(chǎn)生諸多的礦山地質環(huán)境問題,其中地面塌陷、沉降和裂縫等地表變形破壞,已經(jīng)給人們造成了巨大的經(jīng)濟損失,嚴重制約著礦區(qū)經(jīng)濟和社會的可持續(xù)發(fā)展。為了減少泊江海子煤礦地表變形引起的損失,在其礦山開采過程中,對其變形機理和規(guī)律特點進行研究,且對其變形進行準確預計,是降低和控制地表變形的前提,所以開展泊江海子煤礦井工開采地表變形的機理和預測研究有著重要的理論和現(xiàn)實意義。本文所做的工作和得出的結論具體如下:(1)本文研究了泊江海子煤礦井工開采引起的地表變形移動的機理、影響因素、規(guī)律,并指出了泊江海子煤礦井工開采引起地表移動具有滯后性的特點。因泊江海子煤礦礦層埋深大,礦層的開采厚度中等,覆層巖性為軟弱~半堅硬,所以理論上得出其地表變形在豎直剖面上存在“三帶”,研究區(qū)的地表變形會相對較嚴重的結論。(2)本文采用概率積分法,通過《地表移動與變形預計系統(tǒng)》軟件對研究區(qū)近五年及全井田地下開采引起的地面下沉、傾斜、移動和變形進行了預測計算,對預測結果進行了具體的分析,并對不同時期的地表變形量進行了比較,制作了其地面下沉等值線圖和水平變形等值線云圖,通過分析研究圖形特點,總結了研究區(qū)地表變形的規(guī)律,得到這個圖形中等值線均為閉合橢圓形,并中心變形值最大,變形值由內向外逐漸減小,即采空區(qū)中心豎向對應地面的沉降量最大,水平變形量最小的結論。亦可知不同的工作面采動對上覆巖層的作用是相互影響的,地面同一區(qū)域的地表變形是多個采動工作面引起地表變形相互疊加的結果。(3)結合研究區(qū)地表變形預測結果,本文在地表變形等值線圖中對可能產(chǎn)生裂縫塌陷的區(qū)域作了標記,針對研究區(qū)因井工開采導致塌陷、裂縫等相關地質災害,以災害易發(fā)區(qū)為重點提出了對應的防治工程措施,為降低泊江海子煤礦在未來開采過程中可能發(fā)生的地面塌陷和地裂縫災害等造成的破壞,提供了強有力的防治基礎。
[Abstract]:In the process of mining, there are many geological environment problems in coal mine, including ground subsidence, subsidence and fracture, which have caused huge economic losses to people. In order to reduce the loss caused by surface deformation in Pojianghaizi Coal Mine, the mechanism and characteristics of deformation are studied in the mining process, and the deformation is predicted accurately. Is the premise to reduce and control the deformation of the earth's surface. Therefore, it is of great theoretical and practical significance to study the mechanism and prediction of surface deformation in mining in Pojianghaizi Coal Mine. The work done and the conclusion reached in this paper are as follows: 1) this paper studies the coal miners in Pojianghaizi Coal Mine. The mechanism of surface deformation and movement caused by mining, The influencing factors, rules, and characteristics of surface movement caused by workmanship mining in Pojianghaizi coal mine are pointed out. Because of the large buried depth, medium mining thickness and weak to semi-hard lithology of the overburden, the mining depth of the coal seam is large, the mining thickness of the ore bed is medium, and the lithology of the overburden is weak to semi-hard. Therefore, it is theoretically concluded that there are "three zones" in the vertical section of the surface deformation, and that the surface deformation in the study area will be relatively serious. (2) the probability integral method is used in this paper. The ground subsidence, inclination, movement and deformation caused by underground mining in the study area and the whole mine field are predicted and calculated by the software "Surface Movement and deformation Prediction system", and the prediction results are analyzed concretely. The surface deformation in different periods is compared, the contour map of ground subsidence and the contour cloud map of horizontal deformation are made, and the law of surface deformation in the study area is summarized by analyzing the characteristics of the figure. The results show that the isoline is closed ellipse, and the center deformation value is the largest, and the deformation value decreases gradually from the inside out, that is, the vertical settlement of the center of the goaf is the largest. The conclusion that the horizontal deformation is minimum. It is also known that the action of different mining faces on the overlying strata is mutually affected. The surface deformation in the same area of the ground is the result of the superposition of the surface deformation caused by several mining faces. (3) combined with the prediction result of the surface deformation in the study area, this paper marks the area that may cause the crack collapse in the contour map of the surface deformation. In view of the related geological disasters such as collapse and fracture caused by well mining in the study area, the corresponding prevention and control engineering measures are put forward with emphasis on the disaster-prone areas. In order to reduce the damage caused by surface collapse and ground fissure in the future mining process of Pojianghaizi coal mine, it provides a strong prevention and cure foundation.
【學位授予單位】:中國地質大學(北京)
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TD325;P642.2

【相似文獻】

相關期刊論文 前10條

1 張敬霞;劉超;龍仁波;王建鵬;;礦區(qū)高精度GPS地表變形監(jiān)測體系[J];合肥工業(yè)大學學報(自然科學版);2013年07期

2 董家國;;廣西合山巖溶礦區(qū)地表變形與防治[J];煤田地質與勘探;1979年05期

3 劉迅;;邢臺地震地表變形現(xiàn)象初步分析[J];中國地質科學院地質力學研究所所刊;1981年01期

4 黃靖,陳慧,張清華;采動區(qū)地表變形作用的隨機有限元實現(xiàn)[J];山東科技大學學報(自然科學版);2003年02期

5 譚周地,汪發(fā)武,劉紅軍;撫順市采礦地表變形及防治方針[J];中國地質災害與防治學報;1991年04期

6 虞興福;;管幕工程地表變形的人工神經(jīng)網(wǎng)絡預測研究[J];地下空間與工程學報;2005年05期

7 張勇;;動態(tài)測量方法在煤礦開采引發(fā)地表變形的應用探析[J];科技信息;2011年26期

8 李靜濤;盧毅;焦步青;;煤礦開采巖層與地表變形數(shù)值模擬分析[J];測繪科學;2012年02期

9 張亞民;馬鳳山;王杰;郭捷;閆冬飛;羅爽;;陡傾斷層上下盤開挖引起地表變形的數(shù)值模擬分析[J];中國地質災害與防治學報;2012年03期

10 陳雷英;陳仕祥;吳曉紅;;董家溝煤礦地表變形監(jiān)測研究[J];科技創(chuàng)新導報;2010年14期

相關會議論文 前10條

1 李宏;唐春安;;二氧化碳注入煤層引起地表變形的實例研究[A];第三屆廢物地下處置學術研討會論文集[C];2010年

2 佴磊;;露天及地下采礦對邊坡及地表變形影響特征研究[A];第四屆全國工程地質大會論文選集(三)[C];1992年

3 張亞民;馬鳳山;王杰;郭捷;閆冬飛;羅爽;;陡傾斷層上下盤開挖引起地表變形的數(shù)值模擬分析[A];中國科學院地質與地球物理研究所2012年度(第12屆)學術論文匯編——工程地質與水資源研究室[C];2013年

4 劉富華;;第四紀含水砂層對地表變形的影響[A];全國開采沉陷規(guī)律與“三下”采煤學術會議論文集[C];2005年

5 任清平;豐定祥;谷志孟;傅衛(wèi)東;余景崇;徐國財;;開采急傾斜礦體圍巖地表變形特征及模式分析[A];巖土力學研究與工程實踐[C];1998年

6 趙結君;;地面預注漿對地表變形的影響[A];礦山建設工程技術新進展——2008全國礦山建設學術會議文集(上)[C];2008年

7 肖士澄;谷志孟;;地下采礦和地表回填對地表變形影響的研究[A];巖土力學研究與工程實踐[C];1998年

8 張順峰;胡瑞林;武雄;;淺埋厚煤層開采地表變形動態(tài)預測與排水設計[A];中國科學院地質與地球物理研究所2012年度(第12屆)學術論文匯編——工程地質與水資源研究室[C];2013年

9 石朋飛;烏效鳴;;地下管道施工引起的地表變形分析[A];2011年非開挖技術會議論文集[C];2011年

10 安紅剛;胡向東;;交疊隧道施工地表變形的進化智能預測[A];盛世歲月——祝賀孫鈞院士八秩華誕論文選集[C];2006年

相關博士學位論文 前3條

1 周誠;地鐵盾構施工地表變形時空演化規(guī)律與預警研究[D];華中科技大學;2011年

2 張和生;山區(qū)地下開采引起地表變形對長輸氣管線的影響研究[D];太原理工大學;2013年

3 劉艷華;合成孔徑雷達干涉(InSAR)測量技術測量地表變形的理論與算法研究[D];中國測繪科學研究院;2007年

相關碩士學位論文 前10條

1 趙玉倩;泊江海子煤礦井工開采引起地表變形的問題研究[D];中國地質大學(北京);2015年

2 張志偉;基于基因表達式編程的煤礦地表變形預測研究[D];江西理工大學;2015年

3 岳斌;金川鎳礦充填法開采引起的巖體移動和地表變形研究[D];昆明理工大學;2005年

4 李靜濤;煤礦開采巖層與地表變形數(shù)值模擬分析[D];山東科技大學;2010年

5 李帥;龍X 礦地表變形規(guī)律分析與研究[D];山東理工大學;2014年

6 謝曉龍;采空老區(qū)地表變形及沉陷機理研究[D];合肥工業(yè)大學;2010年

7 欒長青;采空區(qū)的沉陷機理及地表變形破壞的時空預測研究[D];長安大學;2005年

8 龔聲勝;地表變形計算及預計系統(tǒng)設計與實現(xiàn)[D];中南大學;2008年

9 胡華斌;矸石充填開采條件下地表變形監(jiān)測及效果評價方法研究[D];太原理工大學;2013年

10 林健;基于GPS監(jiān)測的地下開采礦山地表變形分析與預測研究[D];中國科學院研究生院(武漢巖土力學研究所);2009年

,

本文編號:1648205

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/diqiudizhi/1648205.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶2fd02***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com