山前平原區(qū)沖洪積軟基沉降規(guī)律及處理技術(shù)研究
[Abstract]:With the rapid development of transportation in our country, people's requirements for traffic have gradually changed from simply being able to reach their destination to requiring fast, comfortable, safe, economic and environmental protection. The pursuit of rapidity and safety and comfort makes the drawbacks of the two-way four-lane highway built in our country become more and more prominent. Many of the original two-way four-lane highways are facing reconstruction and expansion, so the thorny problems that need to be solved urgently will be slowly exposed. The settlement of foundation in soft soil area is an important factor affecting the quality of expressway, especially for reconstruction and expansion. The prediction of highway foundation settlement in soft soil area is an urgent technical problem to be solved in highway construction in soft soil area. The research of foundation treatment technology in soft soil area is also a hot field at present. Based on the reconstruction and expansion of Jingshi high speed, the following work has been done in this paper: (1) some research results of soft foundation settlement prediction in China are summarized. This paper introduces the research status of highway reconstruction and expansion at home and abroad. It is the general trend to analyze the significance of Jingshi high speed. (2) the engineering characteristics of soft soil and the distribution and characteristics of soft soil are analyzed. (3) the types of settlement prediction and the mechanism of various fitting curves are briefly described. (4) the numerical simulation of CFG pile net composite foundation is carried out by using PLAXIS software, and the results are compared with the measured values. (5) the hyperbolic method is used to predict the medium-term settlement through the field measured data. The hyperbolic method, the Peel curve method and the exponential curve method are used to predict the late settlement of the foundation, and then the results are compared with the measured values in order to find the optimal method to predict the late settlement. (6) the effects of different foundation treatment methods are compared and studied.
【學(xué)位授予單位】:石家莊鐵道大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U416.1
【二級參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳海珊,胡永深;廣佛高速公路加寬工程的軟基處理[J];廣東公路交通;1998年03期
2 黎志光;高速公路加寬擴(kuò)建工程新老路銜接的處理措施[J];廣東公路交通;2001年02期
3 曾慶軍;廖建春;;基于路面應(yīng)力分析高速公路拓寬工程差異沉降控制標(biāo)準(zhǔn)[J];廣東交通職業(yè)技術(shù)學(xué)院學(xué)報(bào);2006年01期
4 李鎖平,龔成亮;土工格柵砂礫墊層在軟弱地基路基加寬段的應(yīng)用設(shè)計(jì)[J];公路;2001年11期
5 余?;高速公路拓寬工程新老路結(jié)合部施工技術(shù)[J];公路;2004年03期
6 廖榮輝;路基差異沉降引起的路表附加應(yīng)力分析[J];廣西交通科技;2003年06期
7 楊建斌;拓寬道路路面開裂的有限元分析[J];廣西交通科技;2003年06期
8 查旭東;路面結(jié)構(gòu)層模量反算方法綜述[J];交通運(yùn)輸工程學(xué)報(bào);2002年04期
9 周志剛,鄭健龍;舊路拓寬設(shè)計(jì)中的有限元分析[J];力學(xué)與實(shí)踐;1995年05期
10 錢勁松,孫力彤,管旭日;老路拓寬差異沉降計(jì)算的研究[J];蘭州鐵道學(xué)院學(xué)報(bào);2003年04期
相關(guān)博士學(xué)位論文 前1條
1 高翔;高速公路新老路基相互作用分析與處理技術(shù)研究[D];東南大學(xué);2006年
,本文編號:2480843
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/2480843.html