[Abstract]:In order to study the performance monitoring and evaluation method of long-span cable-stayed bridges during operation, and to establish a stable and efficient health monitoring system, based on summarizing the problems existing in the health monitoring of cable-stayed bridges in the past, The following aspects are studied: 1. Aiming at the characteristics of the large number of sensors in cable-stayed bridge, the topology of the network system is optimized and applied by bus technology. The sensor system is set up as a comprehensive system of fieldbus network structure combined with star network structure, and the layout scheme of cable-stayed bridge based on bus-type fiber-optic sensor network is studied. Especially, the structure optimization scheme based on bus technology and the wireless transmission scheme of system monitoring information are studied. 2. The characteristics of nonlinear vibration of cable-stayed bridge are analyzed, and the nonlinear vibration of cable is analyzed. The nonlinear internal resonance, parametric vibration and vortex vibration are theoretically analyzed and calculated. Based on the analysis results, a method for evaluating the overall vortex-vibration stability of cable system (cable system vortex-induced vibration stability, CSVVS) is proposed. On the basis of wind environment monitoring information and cable frequency information, the operation state of cable is evaluated as a whole and the potential operational risk is forecasted. 3. Based on the existing data analysis software, rain flow counting analysis method is adopted. The fatigue load spectrum of structures and components is statistically analyzed, and the fatigue is evaluated based on the statistical results, and a fitting analysis method based on a small amount of test data is given. It is pointed out that when the test data are complete, the statistical analysis method should be used first, so as to avoid the analysis error caused by missing the isolated amplitude value of the fitting analysis method. An improved rain flow analysis program is developed on the Maple platform. The validity of the algorithm is verified by the human working graph analysis of a set of simulated data. 4. The corrosion of the cable system is considered to be an important factor affecting the durability and safety of the structure. Because the corrosion monitoring of cable system is still in the primary stage, based on the analysis and summary of various monitoring methods, the paper puts forward the anchor video monitoring combined with cable end acoustic emission monitoring. In view of the efficiency of CWT calculation, the discretization of CWT is studied in view of the comprehensive monitoring scheme of self-climbing flux leakage monitoring in the middle part of cable body. Due to the characteristic of repeated calculation of multiple discrete dot products in DWT at present, an algorithm with translation parameter b is proposed, and a DWT algorithm with parameters is compiled on the basis of the general mathematical analysis software Maple. The damage analysis of DWT applied to time-domain test is verified by the established cable-stayed bridge model under selected time-history load conditions. The results show that DWT inherits all the advantages of CWT. This method can effectively identify the structural damage related information contained in the time-history data, at the same time, the computational efficiency is significantly improved compared with the traditional method. 6, in view of the variety of failure forms of cable-stayed bridge, In this paper, several typical failure modes are studied. It is pointed out that the deflection and stress failure of the main beam are the most basic failure modes of cable-stayed bridges based on cable stress failure. The reliability of the structure is analyzed by Monte Carlo random sampling and multi-parameter response surface analysis.
【學位授予單位】:西南交通大學
【學位級別】:博士
【學位授予年份】:2015
【分類號】:U446;U448.27
【相似文獻】
相關(guān)期刊論文 前10條
1 劉揚熙;斜拉橋拉索參數(shù)共振現(xiàn)象的理論分析[J];樂山師范學院學報;2000年03期
2 譚也平,szu.edu.cn;斜拉橋初應變增量索力調(diào)整[J];深圳大學學報;2000年01期
3 樂鵬飛;;低塔斜拉橋[J];海威姆預應力技術(shù);2001年01期
4 高德虎,劉桂鳳,蘇達根;斜拉橋拉索失效分析探討[J];廣東公路交通;2002年04期
5 鄒小燕,黎世彬;《斜拉橋熱擠聚乙烯高強鋼絲拉索技術(shù)條件》的編制及應用[J];公路;2002年11期
6 王伯惠;斜拉橋拉索靜力計算[J];公路;2003年06期
7 王俊義;國內(nèi)第一座部分斜拉橋——漳州戰(zhàn)備大橋設計[J];華東公路;2003年01期
8 王修勇,陳政清中南大學 ,倪一清;斜拉橋拉索風雨振觀測及其控制[J];土木工程學報;2003年06期
9 陳水生,秦鳴,陳勇,孫炳楠;斜拉橋拉索的振動及控制現(xiàn)場試驗[J];長安大學學報(自然科學版);2003年02期
10 經(jīng)柏林,謝華鸞;斜拉橋拉索研究綜述[J];中國市政工程;2003年06期
相關(guān)會議論文 前10條
1 項海帆;史家鈞;;斜拉橋的拉索振動及其控制[A];全國索結(jié)構(gòu)學術(shù)交流會論文集[C];1991年
2 何憲飛;陳艾榮;項海帆;;多跨斜拉橋斜拉索疲勞分析[A];中國土木工程學會橋梁及結(jié)構(gòu)工程學會第十三屆年會論文集(上冊)[C];1998年
3 樂鵬飛;;低塔斜拉橋[A];二○○○年湖北省橋梁學術(shù)討論會論文集(下冊)[C];2000年
4 詹勝;徐幼麟;沈其民;周海俊;;斜拉橋拉索風雨振動試驗新裝置[A];第15屆全國結(jié)構(gòu)工程學術(shù)會議論文集(第Ⅲ冊)[C];2006年
5 李壽英;陳政清;;斜拉橋拉索安裝亮化燈具的風致穩(wěn)定性研究[A];第16屆全國結(jié)構(gòu)工程學術(shù)會議論文集(第Ⅱ冊)[C];2007年
6 李毅佳;陳志華;王小盾;;斜拉橋索的抑振措施研究[A];第六屆全國現(xiàn)代結(jié)構(gòu)工程學術(shù)研討會論文集[C];2006年
7 顧明;黃麟;王國硯;;斜拉橋拉索風雨激振機理的理論研究[A];第八屆全國振動理論及應用學術(shù)會議論文集摘要[C];2003年
8 余康燁;楊文兵;;中跨斜拉橋拉索振動及其抑振研究[A];第二屆湖北省力學學會青年學術(shù)研討會論文集[C];2006年
9 錢雪松;;斜拉橋拉索的減振措施[A];中國公路學會橋梁和結(jié)構(gòu)工程分會2004年全國橋梁學術(shù)會議論文集[C];2004年
10 周亞剛;孫利民;;斜拉橋減振輔助索的參數(shù)分析[A];第八屆全國振動理論及應用學術(shù)會議論文集摘要[C];2003年
相關(guān)重要報紙文章 前2條
1 徐蘭山;激情化作彩虹飛[N];科技日報;2004年
2 李雪林;讓橋梁在大風中巍然屹立[N];文匯報;2008年
相關(guān)博士學位論文 前10條
1 陳向東;輕軌車輛與斜拉橋動態(tài)耦合系統(tǒng)的數(shù)值模擬方法及應用[D];上海交通大學;2009年
2 雷宇;組合梁斜拉橋靜力穩(wěn)定性研究[D];西南交通大學;2009年
3 侯立群;大型斜拉橋基于健康監(jiān)測的模型修正、損傷診斷與預警方法[D];哈爾濱工業(yè)大學;2009年
4 唐濤;斜拉橋結(jié)構(gòu)體系使用安全性評估理論與方法研究[D];同濟大學;2006年
5 趙翔;拉索損傷對斜拉橋結(jié)構(gòu)性能影響的研究[D];東南大學;2005年
6 王福春;預應力混凝土折線塔斜拉橋力學特性的研究[D];東北大學;2011年
7 王修勇;斜拉橋拉索振動控制新技術(shù)研究[D];中南大學;2002年
8 江鋒;薄壁箱梁混合單元及其在斜拉橋雙重非線性分析中的應用研究[D];中南大學;2004年
9 禹見達;磁流變阻尼器對斜拉橋拉索振動控制的理論與試驗研究[D];湖南大學;2007年
10 布占宇;斜拉橋地震響應分析中的索橋耦合振動和阻尼特性研究[D];浙江大學;2005年
相關(guān)碩士學位論文 前10條
1 楊新剛;索力變化對斜拉橋特性及承載能力的影響[D];大連理工大學;2009年
2 周國凱;大跨度組合梁斜拉橋靜力穩(wěn)定性分析[D];西南交通大學;2009年
3 韓福前;天津永定河斜拉橋維修加固關(guān)鍵技術(shù)研究[D];天津大學;2009年
4 李健偉;拉索損傷的斜拉橋靜動力分析和試驗[D];東北林業(yè)大學;2010年
5 高大衛(wèi);斜拉橋結(jié)構(gòu)系統(tǒng)可靠性分析[D];南京林業(yè)大學;2010年
6 閆翔宇;新型斜拉橋和摩天輪組合結(jié)構(gòu)研究[D];天津大學;2004年
7 楊正華;斜拉橋結(jié)構(gòu)體系及力學性能研究[D];西安建筑科技大學;2006年
8 汪波;斜塔無背索部分斜拉橋結(jié)構(gòu)設計計算研究[D];東南大學;2006年
9 王勝;部分斜拉橋的結(jié)構(gòu)行為與設計實踐[D];西南交通大學;2004年
10 扈春霞;斜拉橋三維可視化的研究[D];大連理工大學;2008年