折線先張法簡(jiǎn)支T梁施工方案設(shè)計(jì)及應(yīng)用研究
[Abstract]:Zhang Fa is an important form of the first Zhang Fa. The prebending moment diagram is closer to the moment diagram under load by bending and tensioning the prestressed tendons. At the same time, it overcomes the shortcoming that linear pre-Zhang Fa prestressed concrete members can not be applied to large span, and solves the quality hidden trouble of post-Zhang Fa prestressed concrete beams such as unreal grouting and uncontrollable prestress fundamentally. In recent years, there have been many applications in the sea crossing bridges, highways and railway bridges at home and abroad, but the supporting construction technology is still not perfect. The existing research is mainly aimed at the form of double broken lines, that is, the prestressed tendons bend twice. However, the lack of research on the construction of single line reinforced beam becomes the key problem to restrict the popularization and application of Zhang Fa. In this paper, based on the prefabricated construction of Zhang Fa prestressed concrete simply supported T beam in Suining to Guangan high speed bridge construction project, the key contents of the construction are studied. This paper also introduces the construction of pretensioned T beam with single broken line and the application of construction scheme. The main work accomplished in this paper is as follows: (1) the key technical problems in the construction of Zhang Fa prefabricated standard simply supported T-beam are analyzed. Based on the existing pedestal form of tensioning reaction system, a set of explicit transmission force and simple construction are put forward. The reaction system scheme suitable for the integral tension of single broken lines and linear prestressed tendons can be reused. (2) according to the requirements of the current design code, the strength, stiffness, stability design and checking calculation of the components of the proposed reaction system scheme are carried out. The 3D numerical model is established by using the universal finite element software LS-DYNA. The stress condition of the key force transfer site is calculated and analyzed. (3) the Zhang Fa 30m prestressed concrete T beam of the bridge project is constructed by using the tension and reaction system designed in this paper, and the construction process is carried out from the point of view of the construction process. This paper introduces the application of the reaction system from the tensioning program of prestressed tendons, the key points of construction technology of concrete and the tensioning procedure of prestressed tendons.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U445.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉建廣;;先張法預(yù)應(yīng)力混凝土施工技術(shù)研究[J];交通世界;2016年32期
2 王艷;趙志有;章建平;;先張法折線配筋預(yù)應(yīng)力混凝土箱梁施工技術(shù)[J];鐵道科學(xué)與工程學(xué)報(bào);2013年04期
3 徐純治;;真空灌漿技術(shù)在預(yù)應(yīng)力混凝土中的運(yùn)用[J];鐵道建筑技術(shù);2011年07期
4 張勃;羅鴻剛;劉志長(zhǎng);;淺談公路橋預(yù)制梁先張法施工工藝[J];山西建筑;2011年20期
5 郭榮春;;折線力筋先張法箱梁的預(yù)制工藝研究[J];西部探礦工程;2011年03期
6 王曉武;;先張法臺(tái)座設(shè)計(jì)及施工技術(shù)探析[J];技術(shù)與市場(chǎng);2011年02期
7 歐陽(yáng)克武;;35m折線配筋先張梁施工技術(shù)研究和應(yīng)用[J];公路;2010年04期
8 蘇軍;劉靜;;淺談先張法施工[J];黑龍江交通科技;2010年04期
9 李振田;王中倉(cāng);;折線配筋預(yù)應(yīng)力混凝土50m先張T梁施工技術(shù)探討[J];公路交通科技(應(yīng)用技術(shù)版);2009年04期
10 彭曉輝;;錨墩式先張法張拉臺(tái)座結(jié)構(gòu)形式分析研究[J];山西建筑;2008年23期
,本文編號(hào):2195865
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/2195865.html