Peck公式在合肥地鐵盾構(gòu)施工地面變形監(jiān)測中的適用性分析
發(fā)布時間:2018-07-25 15:41
【摘要】:采用盾構(gòu)法進行隧道施工,難免會引起地層移動而導致不同程度的沉降,而采用Peck公式進行沉降預測時,首先要利用實測數(shù)據(jù)對該公式進行驗證,并給出適合該地域的計算參數(shù)。文章利用合肥軌道交通盾構(gòu)施工中的地表監(jiān)測數(shù)據(jù)對Peck公式進行驗證,同時計算出沉降槽寬度參數(shù)和地層損失率,為該公式在合肥盾構(gòu)施工過程中預測地表沉降值提供了依據(jù)。
[Abstract]:Using shield method in tunnel construction will inevitably cause stratum movement and result in different degrees of settlement. When using Peck formula to predict the settlement, the formula should be verified by the measured data. The calculation parameters suitable for the region are also given. This paper verifies the Peck formula by using the surface monitoring data of Hefei rail transit shield construction, and calculates the parameters of settlement trough width and formation loss rate, which provides the basis for predicting the surface settlement value in the course of shield tunneling construction in Hefei.
【作者單位】: 合肥工業(yè)大學土木與水利工程學院;合肥工業(yè)大學土木工程結(jié)構(gòu)與材料安徽省重點實驗室;
【基金】:國家自然科學基金資助項目(51179043,41402256) 軌道交通建設(shè)工程質(zhì)量安全監(jiān)督站科研資助項目(2015FFCZ0617)
【分類號】:U455.43;U231.3
,
本文編號:2144278
[Abstract]:Using shield method in tunnel construction will inevitably cause stratum movement and result in different degrees of settlement. When using Peck formula to predict the settlement, the formula should be verified by the measured data. The calculation parameters suitable for the region are also given. This paper verifies the Peck formula by using the surface monitoring data of Hefei rail transit shield construction, and calculates the parameters of settlement trough width and formation loss rate, which provides the basis for predicting the surface settlement value in the course of shield tunneling construction in Hefei.
【作者單位】: 合肥工業(yè)大學土木與水利工程學院;合肥工業(yè)大學土木工程結(jié)構(gòu)與材料安徽省重點實驗室;
【基金】:國家自然科學基金資助項目(51179043,41402256) 軌道交通建設(shè)工程質(zhì)量安全監(jiān)督站科研資助項目(2015FFCZ0617)
【分類號】:U455.43;U231.3
,
本文編號:2144278
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/2144278.html