組合型前板樁高樁承臺(tái)結(jié)構(gòu)研究與應(yīng)用
發(fā)布時(shí)間:2018-05-30 10:04
本文選題:組合型結(jié)構(gòu) + 鋼板樁 ; 參考:《水運(yùn)工程》2017年11期
【摘要】:分析傳統(tǒng)前板樁高樁承臺(tái)結(jié)構(gòu)的優(yōu)缺點(diǎn),針對(duì)混凝土板樁、鋼板樁的耐久性、經(jīng)濟(jì)性等問題,提出了改進(jìn)型方案即組合型前板樁高樁承臺(tái)結(jié)構(gòu)。采用豎向彈性地基梁法建立組合型結(jié)構(gòu)的計(jì)算模型,并采用有限元軟件SAP2000對(duì)混凝土樁身受力的優(yōu)化方法進(jìn)行解釋。以上海某碼頭為例,驗(yàn)證組合型前板樁高樁承臺(tái)結(jié)構(gòu)的實(shí)用性和模型計(jì)算的準(zhǔn)確性。
[Abstract]:Based on the analysis of the advantages and disadvantages of the traditional pile cap structure of the front plate pile and the durability and economy of the concrete plate pile and the steel plate pile, an improved scheme, that is, the composite front plate pile high pile cap structure, is put forward. The calculation model of composite structure is established by using vertical elastic foundation beam method, and the optimization method of concrete pile subjected to force is explained by finite element software SAP2000. Taking a wharf in Shanghai as an example, the practicability and accuracy of model calculation of composite pile cap structure are verified.
【作者單位】: 中交上海航道勘察設(shè)計(jì)研究院有限公司;
【分類號(hào)】:U656.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;計(jì)算高樁承臺(tái)的C法[J];橋梁建設(shè);1974年03期
2 周泳濤;高樁承臺(tái)在實(shí)際工程中的應(yīng)用[J];云南交通科技;1999年06期
3 婁新,朱傳宏;錨固新工藝在深水高樁承臺(tái)施工應(yīng)用[J];湖南交通科技;2005年02期
4 樂云祥,常英;高樁承臺(tái)裂縫有限元分析[J];公路交通科技;2005年02期
5 朱冠e,
本文編號(hào):1954891
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/1954891.html
最近更新
教材專著