天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 路橋論文 >

貴陽七沖村二號淺埋偏壓大跨度隧道施工力學(xué)特性研究

發(fā)布時間:2018-04-24 12:23

  本文選題:淺埋偏壓大跨度隧道 + 力學(xué)特性; 參考:《中國地質(zhì)大學(xué)(北京)》2017年碩士論文


【摘要】:近年來,我國的公路隧道從起初的雙向四車道、雙向六車道,發(fā)展到今天的雙向八車道,隧道斷面面積變得越來越大,隧道的開挖跨度也在不斷增大。隧道開挖跨度增大,若保持一般隧道的扁平率,開挖的斷面面積會過大,成本會大幅增加,為了確保一定的成本,我國的大跨度隧道還是保持一樣的高度,造成隧道的扁平率減小,隧道圍巖和支護(hù)結(jié)構(gòu)的受力變得更加復(fù)雜,提高了隧道的施工風(fēng)險和隧道安全的不確定性。因為其結(jié)構(gòu)受力的不確定性和自然災(zāi)害的影響,不斷有大跨度公路隧道出現(xiàn)塌方事故和其他隧道災(zāi)害,所以必須加強(qiáng)對大跨度隧道開挖過程中圍巖和支護(hù)結(jié)構(gòu)受力的研究,了解其特性,確保隧道施工安全和后期的穩(wěn)定性。本文采用數(shù)值模擬的方法對兩車道、三車道、四車道三種不同跨度隧道的圍巖壓力特性進(jìn)行分析,并結(jié)合查閱的相關(guān)資料可以得出淺埋偏壓大跨度隧道開挖圍巖壓力的基本特征。本文還依托淺埋偏壓大跨度巖溶隧道施工關(guān)鍵技術(shù)研究項目,以貴陽黔春大道七沖村二號隧道為工程背景,對其整個施工過程中的隧道圍巖受力和支護(hù)結(jié)構(gòu)受力進(jìn)行實時監(jiān)測,其主要包括:圍巖與初襯間壓力監(jiān)測、鋼拱架應(yīng)變監(jiān)測、初襯與二襯間壓力監(jiān)測、二襯混凝土應(yīng)變監(jiān)測等。通過對監(jiān)測數(shù)據(jù)的分析,掌握特大跨度小矢跨比巖溶隧道三臺階法施工時隧道圍巖和支護(hù)結(jié)構(gòu)的受力變化規(guī)律。同時利用GTS NX有限元軟件對七沖村二號隧道進(jìn)行三維數(shù)值模擬,提取其結(jié)果繪制成變化規(guī)律曲線,與現(xiàn)場監(jiān)測數(shù)據(jù)對比分析,加深對貴陽七沖村淺埋偏壓大跨度隧道施工力學(xué)的了解。開展對施工動態(tài)下圍巖受力和支護(hù)結(jié)構(gòu)受力規(guī)律的研究,能夠不斷完善淺埋大跨度隧道圍巖壓力理論體系,對實際工程進(jìn)行指導(dǎo),為我國未來的大跨度隧道建設(shè)提供經(jīng)驗依據(jù),對提高我國高速公路隧道的整體水平具有實際意義。本文還總結(jié)了一些常用于計算淺埋大跨度隧道開挖圍巖壓力的方法,并進(jìn)行分析比較,得出相對適用于計算淺埋大跨度隧道圍巖壓力的方法,并在此基礎(chǔ)上得出適用于淺埋偏壓大跨度隧道圍巖壓力的計算公式。
[Abstract]:In recent years, the highway tunnel in our country has developed from four lanes and six lanes to eight lanes. The cross-section area of the tunnel has become larger and larger, and the excavation span of the tunnel is also increasing. If the tunnel excavation span is enlarged, if the flat rate of the general tunnel is maintained, the section area will be too large and the cost will increase substantially. In order to ensure a certain cost, the long-span tunnel in our country will maintain the same height. As a result, the flat rate of tunnel is reduced, and the stress of surrounding rock and supporting structure becomes more complex, which increases the construction risk and the uncertainty of tunnel safety. Because of the uncertainty of the structural force and the influence of natural disasters, there are continuous collapse accidents and other tunnel disasters in the large-span highway tunnel, so it is necessary to strengthen the study on the surrounding rock and supporting structure forces during the excavation of the long-span tunnel. Understand its characteristics to ensure tunnel construction safety and later stability. In this paper, the characteristics of surrounding rock pressure of two lanes, three lanes and three different span tunnels are analyzed by numerical simulation. The basic characteristics of surrounding rock pressure in excavation of long span tunnel with shallow-buried bias pressure can be obtained by combining the relevant data. This paper also relies on the key technology research project of shallow buried bias pressure large span karst tunnel construction, taking Qianchun Avenue Qichong Village No. 2 Tunnel in Guiyang as the engineering background, and carries on the real-time monitoring to the surrounding rock force and the support structure force of the tunnel during the whole construction process. It mainly includes: pressure monitoring between surrounding rock and initial liner, strain monitoring of steel arch frame, pressure monitoring between initial lining and second liner, strain monitoring of concrete with second liner, etc. Based on the analysis of monitoring data, the law of stress variation of surrounding rock and supporting structure of large span karst tunnel with small rise-to-span ratio is grasped. At the same time, GTS NX finite element software is used to simulate Qichongcun No. 2 Tunnel, and the results are drawn into the changing law curve, and compared with the monitoring data. To deepen the understanding of construction mechanics of long span tunnel with shallow buried bias pressure in Qichong Village, Guiyang. The research on the stress of surrounding rock and the force law of supporting structure under dynamic construction can improve the theoretical system of surrounding rock pressure of shallow long span tunnel, guide the actual project, and provide the experience basis for the construction of long span tunnel in our country in the future. It is of practical significance to improve the overall level of highway tunnel in China. This paper also summarizes some methods which are often used to calculate the surrounding rock pressure of shallow long span tunnel excavation, and makes an analysis and comparison, and obtains a method which is relatively suitable for calculating the surrounding rock pressure of shallow long span tunnel. On this basis, a formula for calculating the surrounding rock pressure of long span tunnel with shallow burying bias pressure is obtained.
【學(xué)位授予單位】:中國地質(zhì)大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U455.4

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 萬波;;大跨度隧道施工問題研究[J];科技資訊;2008年17期

2 馬紅利;淺埋破碎地層大跨度隧道穿越方法[J];科技資訊;2005年27期

3 郝哲,李偉,劉斌;韓家?guī)X大跨度隧道開挖過程數(shù)值模擬研究[J];西部探礦工程;2005年02期

4 郝哲,李偉,萬明富;對大跨度隧道開挖中若干問題的思考[J];公路;2005年04期

5 鄧寄生;許人平;吳從師;丁祖德;王憲孟;;大跨度隧道施工方法探討[J];公路與汽運(yùn);2007年06期

6 邵國明;;淺談群洞中的穹頂大跨度隧道施工技術(shù)[J];科技資訊;2009年33期

7 馮子洲;;大跨度隧道臨時支撐拆除的動力學(xué)分析[J];建筑;2011年23期

8 左言志;高勁松;;大跨度隧道環(huán)形開挖上臺階合理高度探討[J];交通標(biāo)準(zhǔn)化;2013年01期

9 卜慶寶,史玉新;用“眼鏡法”處理大跨度隧道坍方的嘗試[J];鐵道建筑;1987年11期

10 卿偉宸;章慧健;朱勇;;基于壓力拱理論的大跨度隧道深淺埋劃分研究[J];石家莊鐵道大學(xué)學(xué)報(自然科學(xué)版);2013年S2期

相關(guān)會議論文 前10條

1 趙東平;王明年;;大跨度隧道施工方法比較[A];鐵路客運(yùn)專線建設(shè)技術(shù)交流會論文集[C];2005年

2 劉軍;張本茂;張正君;;大跨度隧道施工過程中圍巖變形特征的數(shù)值模擬[A];第2屆全國工程安全與防護(hù)學(xué)術(shù)會議論文集(上冊)[C];2010年

3 盛仁聲;;穿越古城墻大跨度隧道修建技術(shù)的應(yīng)用[A];第一屆海峽兩岸隧道與地下工程學(xué)術(shù)與技術(shù)研討會論文集(上冊)[C];1999年

4 余旭俊;姜濤;張福宏;;軟弱圍巖大跨度隧道施工方法[A];2001年全國公路隧道學(xué)術(shù)會議論文集[C];2001年

5 夏才初;;DDA在節(jié)理巖體大跨度隧道穩(wěn)定性分析中的應(yīng)用[A];中國力學(xué)大會——2013論文摘要集[C];2013年

6 梁巍;黃明利;;大跨度隧道CRD法穿越含水軟弱層沉降變形控制[A];湖北省公路學(xué)會自然科學(xué)優(yōu)秀學(xué)術(shù)論文匯編(2008年——2013年)[C];2014年

7 邢厚俊;徐禎祥;;大管棚在超淺埋暗挖大跨度隧道工程中的應(yīng)用[A];第一屆海峽兩岸隧道與地下工程學(xué)術(shù)與技術(shù)研討會論文集(下冊)[C];1999年

8 何川;;地形偏壓隧道的模型試驗研究[A];第二屆全國青年巖石力學(xué)與工程學(xué)術(shù)研討會論文集[C];1993年

9 魯光宏;許云躍;;對偏壓隧道施工方法的初探[A];礦井建設(shè)與巖土工程技術(shù)新發(fā)展[C];1997年

10 王聯(lián);鄧剛;;都汶路淺埋偏壓隧道設(shè)計[A];中國公路學(xué)會2004年學(xué)術(shù)年會論文集[C];2004年

相關(guān)重要報紙文章 前3條

1 本報通訊員 莊民群;頂起大跨度隧道的脊梁[N];人民鐵道;2011年

2 通訊員 劉慶 張鵬 徐麗霞;振科技之翼 攬九天風(fēng)云[N];中國交通報;2010年

3 本報記者 陳樹青;十三局用科技打造地鐵品牌[N];中國鐵道建筑報;2001年

相關(guān)碩士學(xué)位論文 前10條

1 蘇運(yùn)基;貴陽七沖村二號淺埋偏壓大跨度隧道施工力學(xué)特性研究[D];中國地質(zhì)大學(xué)(北京);2017年

2 陳遠(yuǎn)志;大跨度隧道圍巖及支護(hù)體系受力特征研究[D];長沙理工大學(xué);2013年

3 邊翔;大跨度隧道施工方法數(shù)值模擬與動力響應(yīng)分析研究[D];武漢理工大學(xué);2005年

4 王林;黃(山)塔(嶺)高速公路大跨度隧道施工技術(shù)研究[D];長安大學(xué);2008年

5 徐懷仁;三線鐵路大跨度隧道圍巖力學(xué)響應(yīng)研究[D];西南交通大學(xué);2007年

6 李園園;大跨度隧道施工力學(xué)響應(yīng)及地表沉陷預(yù)計[D];中南大學(xué);2008年

7 潘曉明;淺埋軟巖大跨度隧道開挖方法研究[D];山東科技大學(xué);2008年

8 劉長祥;山區(qū)軟弱砂巖地區(qū)大跨度隧道穩(wěn)定性研究[D];同濟(jì)大學(xué);2007年

9 江濤;山區(qū)軟巖大跨度隧道變形神經(jīng)網(wǎng)絡(luò)預(yù)測及其工程應(yīng)用[D];同濟(jì)大學(xué);2007年

10 袁小龍;基于應(yīng)變軟化模型的扁平大跨度隧道開挖過程穩(wěn)定性分析[D];鄭州大學(xué);2012年

,

本文編號:1796577

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/1796577.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c0819***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com