【摘要】:本文基于青島地鐵一期工程(3號線)河西站-河?xùn)|站區(qū)間工程實際,采用理論分析、數(shù)值計算、現(xiàn)場監(jiān)測相結(jié)合的方式分析了砂土地層淺埋暗挖地鐵隧道開挖地層變形規(guī)律以及圍巖穩(wěn)定性,并對施工風(fēng)險進行了評價、預(yù)測,對隧道坍塌機理進行了研究。(1)本文從經(jīng)驗法、解析法、數(shù)值分析法以及模型試驗法四個方面系統(tǒng)總結(jié)了淺埋暗挖地鐵隧道施工誘發(fā)地層變形規(guī)律的國內(nèi)外研究現(xiàn)狀與研究進展,通過對地鐵建設(shè)期安全事故統(tǒng)計分析得出坍塌是地鐵建設(shè)安全事故的主要類型,進而引出對隧道開挖誘發(fā)地層變形規(guī)律以及地層穩(wěn)定性研究的必要性、重要性和迫切性。(2)簡要介紹了青島地鐵的發(fā)展歷程、各線路規(guī)劃,并詳細(xì)介紹了青島地鐵3號線河河區(qū)間的工程地質(zhì)、水文地質(zhì)情況,基于層次分析法對施工風(fēng)險進行分析,指出地質(zhì)情況和復(fù)雜的周邊環(huán)境是最需注意的風(fēng)險因素。基于特爾菲-理想點法選取縱波波速、埋深、跨度、地下水、周邊環(huán)境以及施工單位管理水平六個方面作為影響因素,建立坍塌預(yù)測模型,分析坍塌風(fēng)險,進而提出了一套淺埋暗挖隧道坍塌風(fēng)險預(yù)測評價體系并對河河區(qū)間坍塌風(fēng)險進行預(yù)測,以一起典型坍塌案例對預(yù)測結(jié)果進行了驗證。(3)闡述PECK公式與隨機介質(zhì)理論的適用性,基于現(xiàn)場監(jiān)測數(shù)據(jù),選取典型斷面,利用PECK公式對監(jiān)測數(shù)據(jù)進行擬合分析,探討PECK公式在砂土地層淺埋暗挖地鐵隧道的適用性,針對當(dāng)前隨機介質(zhì)理論極坐標(biāo)解法的不足提出了直角坐標(biāo)解法及其詳細(xì)步驟。(4)利用FLAC3D有限差分軟件對砂土地層淺埋暗挖隧道施工誘發(fā)地層變形進行計算分析,計算結(jié)果表明該地層地表沉降橫向影響范圍約為2~2.5倍洞徑,地表沉降縱向影響范圍約為2倍洞徑,地表最大沉降出現(xiàn)于隧道中線正上方。拱頂沉降變化趨勢與地表沉降變化趨勢整體一致,但數(shù)值與地表沉降相比較大。針對不同核心土長度工況分析其對隧道開挖地層穩(wěn)定性的影響。(5)基于現(xiàn)場監(jiān)測數(shù)據(jù),將監(jiān)測數(shù)據(jù)與數(shù)值計算結(jié)果相對比,分析隧道開挖橫向影響范圍,對地表沉降與拱頂沉降進行對比分析,指出拱頂沉降監(jiān)測中不可避免的弊端,即監(jiān)測的滯后性導(dǎo)致了拱頂沉降的監(jiān)測數(shù)據(jù)僅為實際沉降量的40%左右,進而提出了拱頂沉降預(yù)測理論,并基于粒子群算法對拱頂沉降進行擬合分析,做出拱頂沉降位移全過程曲線。(6)對砂土地層淺埋暗挖地鐵隧道地層坍塌類型進行分類,按照坍塌位置進行劃分,地層坍塌包括掌子面失穩(wěn)和地表塌陷兩類,同時地層坍塌亦包括開挖面土體超出以及小范圍的地表沉陷;按照坍塌時間進行分類,地層坍塌包括掌子面失穩(wěn)與地表塌陷同時發(fā)生和地表塌陷滯后于隧道開挖兩大類。從砂土本身物理力學(xué)性能、施工措施以及隧道埋深三個方面分析坍塌的成因,基于改進的楔形體理論探討了隧道坍塌的力學(xué)機理,并選用PFC2D軟件模擬計算了地層坍塌失穩(wěn)過程,對地層水平位移、豎向位移按照不同橫斷面、縱斷面進行分析。
[Abstract]:In this paper, based on a project of Qingdao subway station (line 3) - east west station interval engineering practice, using theoretical analysis, numerical simulation, field monitoring combination of sand soil layer of Shallow Metro tunnel deformation regularity and stability of surrounding rock excavation, and the construction risk evaluation, prediction of tunnel collapse mechanism is studied. (1) this paper from the empirical method, analytical method, numerical analysis and model test method four aspects summarized current situation and research progress of Shallow Metro Tunnel induced ground deformation law at home and abroad, based on the statistical analysis of subway construction safety accident collapse the main types of safety accidents in subway construction, which leads to the excavation induced deformation regularity and the necessity of research on tunnel ground stability, importance and urgency. (2) a brief introduction of the Qingdao subway The development process of the line planning, and introduces the engineering geology of Qingdao Metro Line 3 river range, hydrogeological conditions, the level of construction risk analysis method based on the geological conditions and points out the complicated surrounding environment is the need to pay attention to the risk factors. The Delphi ideal point method based on wave velocity. Depth, span, groundwater, surrounding environment and the management level of construction units in six aspects as influence factors, the establishment of collapse prediction model, analysis of collapse risk, and proposes a set of shallow buried tunnel collapse risk prediction evaluation system and forecast the river interval risk collapse, with a typical case to predict the result of collapse verified. (3) describes the applicability of PECK equation with stochastic medium theory, based on the monitoring data, selecting the typical section, fitting analysis of monitoring data by using the PECK formula, discuss The applicability of PECK formula in sand soil layer of Shallow Metro tunnel, in view of the current lack of polar coordinate method of stochastic medium theory put forward the Cartesian coordinate solution and detailed steps. (4) by using the FLAC3D finite difference software on sand soil layer in shallow strata induced by tunnel construction deformation were analyzed and calculated, the calculation results show that the formation of surface settlement lateral influence range is about 2 ~ 2.5 times the diameter, the surface subsidence vertical influence range is about 2 times the diameter of the tunnel, the maximum surface subsidence appears in the midline of the tunnel. Just above the vault settlement and ground settlement trend of the overall trend is consistent, but the value and settlement phase for different core soil is relatively large. The length of working conditions and analyses the effect of tunnel excavation formation stability. (5) based on the monitoring data, the monitoring data and numerical comparison, transverse influenced range analysis of tunnel excavation. Compared with the settlement of vault settlement, crown settlement monitoring pointed out shortcomings inevitably, which leads to the lag of monitoring crown settlement monitoring data is only about the actual settlement of the 40%, and then put forward the prediction theory and the settlement of vault crown settlement, particle swarm optimization algorithm based on fitting analysis, make the whole process of settlement curve vault. (6) of sand soil layer of Shallow Metro Tunnel Collapse types are classified, divided according to the collapsed position, including collapse instability of tunnel face and surface collapse in two categories, at the same time also includes the collapse layer beyond the soil of excavation face and surface subsidence range; in accordance with the classification of collapse time. Including the formation collapse instability of tunnel face and surface subsidence and surface subsidence occurred at the same time lag in the tunnel excavation in two categories. From the soil physical and mechanical properties, construction measures to Analysis of collapse of the three aspects and causes of deep tunnel, the improved wedge theory based on the mechanical mechanism of tunnel collapse, and simulate the collapse instability process with PFC2D software, the displacement on the stratigraphic level, vertical displacement according to the different cross-sectional profile were analyzed.

【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U231.3;U452.1

【相似文獻】

相關(guān)期刊論文 前10條

1 陳先國,高波;地鐵近距離平行隧道有限元數(shù)值模擬[J];巖石力學(xué)與工程學(xué)報;2002年09期

2 M.Voerckel,M.Peters;掘進機隧道開挖的最新技術(shù)與未來發(fā)展[J];建筑機械;2002年05期

3 王旭光;隧道縱向裂縫成因分析及控制措施[J];鐵道建筑;2003年08期

4 郝建國,張永闊;巖坑尖隧道開挖控制測量技術(shù)[J];山西交通科技;2003年S1期

5 張云軍;宰金珉;王旭東;常銀生;戚科駿;;隧道開挖對臨近樁基影響的二維數(shù)值分析[J];地下空間與工程學(xué)報;2005年06期

6 澤楷;;不屈的隧道工向吉林[J];中華建設(shè);2007年01期

7 趙文政;;老山隧道原生態(tài)建設(shè)綜述[J];公路交通科技(應(yīng)用技術(shù)版);2007年04期

8 蒯行成;劉偉綱;任畢喬;官邑;;初應(yīng)力法模擬隧道開挖過程的有限元原理及列式[J];中南公路工程;2007年02期

9 吉小明;王宇會;陽志元;;隧道開挖問題中的流固耦合模型及數(shù)值模擬[J];巖土力學(xué);2007年S1期

10 付慧;;如何在隧道開挖時防止坍塌[J];職業(yè)技術(shù);2007年18期

相關(guān)會議論文 前10條

1 陳卓然;何泰源;孫福勝;趙基盛;;巖栓加固對隧道開挖的影響[A];海峽兩岸土力學(xué)及基礎(chǔ)工程地工技術(shù)學(xué)術(shù)研討會論文集[C];1994年

2 莊文任;;選用隧道開挖法之考慮因素表[A];中國土木工程學(xué)會隧道及地下工程學(xué)會第七屆年會暨北京西單地鐵車站工程學(xué)術(shù)討論會論文集(上)[C];1992年

3 張振剛;齊國紅;;隧道開挖作用對地層工程性質(zhì)的影響[A];第十屆全國結(jié)構(gòu)工程學(xué)術(shù)會議論文集第Ⅱ卷[C];2001年

4 曹玉玲;秦峰;韋雁飛;;論鹽壩高速公路大梅沙隧道建設(shè)管理工作[A];2001年全國公路隧道學(xué)術(shù)會議論文集[C];2001年

5 吳宏偉;周小文;J.K.H.Chung;;淺埋平行隧道相互作用離心模型試驗研究[A];中國土木工程學(xué)會第九屆土力學(xué)及巖土工程學(xué)術(shù)會議論文集(下冊)[C];2003年

6 傅剛;張林;;“八一”、“向陽”隧道襯砌開裂分析及治理[A];中國土木工程學(xué)會第十三屆年會暨隧道及地下工程分會第十五屆年會論文集[C];2008年

7 A·Richter;楊輝;;水泥和聚氨酯灌漿在礦山和隧道開挖中的應(yīng)用與效果[A];巖石與混凝土灌漿譯文集[C];1995年

8 董亞東;石云;何錦明;;貴廣鐵路佛山隧道深基坑開挖技術(shù)[A];第二屆全國地下、水下工程技術(shù)交流會論文集[C];2011年

9 田執(zhí)祥;;新松樹灣隧道變形規(guī)律的試驗研究[A];城市地下空間開發(fā)與地下工程施工技術(shù)高層論壇論文集[C];2004年

10 王士民;劉豐軍;葉飛;汪成兵;;隧道塌方研究中的數(shù)值方法發(fā)展現(xiàn)狀[A];中國土木工程學(xué)會第十二屆年會暨隧道及地下工程分會第十四屆年會論文集[C];2006年

相關(guān)重要報紙文章 前10條

1 通訊員 陳薇 郭文清;奎北鐵路巴音努魯隧道月底貫通[N];伊犁日報(漢);2008年

2 本報記者 俞瑩 劉凌;貴金線3號隧道提前貫通[N];貴陽日報;2009年

3 通訊員 鄧?yán)?張雷;貴廣鐵路千米以下隧道全部貫通[N];中國鐵道建筑報;2010年

4 通訊員 李連明 何增旺 牟紹書;安邵高速公路I標(biāo)段隧道開挖突破8000米[N];人民鐵道;2011年

5 本報記者 張愛正;隧道塌方何時了?質(zhì)量監(jiān)察要做好![N];中國貿(mào)易報;2012年

6 石中生 本報通訊員  田冬 張偉;環(huán)保理念貫穿建設(shè)始終[N];中國交通報;2006年

7 唐愛眾邋張君 石治榮;瀏陽河隧道六大技術(shù)難題咋破解?[N];科技日報;2007年

8 徐景明;翔安隧道挺進“最深點”[N];廈門日報;2008年

9 張紀(jì)平邋劉剛;世界跨度最大穿河隧道順利貫通[N];中華建筑報;2008年

10 通訊員趙江平;我國最長高瓦斯隧道動工開挖[N];中國鐵道建筑報;2009年

相關(guān)博士學(xué)位論文 前5條

1 吳翔天;隧道開挖對樁基承載性狀的影響分析及試驗研究[D];西安科技大學(xué);2013年

2 杜煒平;隧道開挖地質(zhì)災(zāi)害規(guī)律與防治對策研究[D];中南大學(xué);2001年

3 張俊峰;軟土地區(qū)基坑對下臥隧道變形的影響與控制研究[D];上海交通大學(xué);2013年

4 萬明富;超大跨公路隧道開挖力學(xué)行為研究[D];東北大學(xué) ;2009年

5 黃強;基于黏彈性理論的隧道圍巖應(yīng)力分析研究[D];武漢理工大學(xué);2012年

相關(guān)碩士學(xué)位論文 前10條

1 徐銳;基于HHT分析的超淺埋隧道下穿民房降振控爆技術(shù)研究[D];西南交通大學(xué);2015年

2 閆茂旺;淺埋暗挖地鐵隧道開挖砂土地層穩(wěn)定性研究[D];山東大學(xué);2015年

3 朱麟晨;窯頭2號隧道進口段斜坡不良地質(zhì)體與隧道相互作用機理的研究[D];西南交通大學(xué);2009年

4 熊雄;基于有限元模擬和貝葉斯網(wǎng)絡(luò)的隧道開挖風(fēng)險分析[D];清華大學(xué);2008年

5 王柱;地鐵隧道開挖對剛性樁基變形影響研究[D];西安理工大學(xué);2005年

6 邢賓;隧道開挖引發(fā)的地表變形對上部建筑物的影響研究[D];青島理工大學(xué);2010年

7 吳邊;長山隧道項目建設(shè)過程管理研究[D];西南交通大學(xué);2011年

8 郭世博;地鐵隧道開挖對鄰近建筑物群樁基礎(chǔ)的影響分析[D];合肥工業(yè)大學(xué);2014年

9 徐建國;礦山法隧道開挖安全性研究[D];華中科技大學(xué);2011年

10 徐德軍;清水隧道蝕變帶圍巖變形機理與控制技術(shù)研究[D];西南交通大學(xué);2012年



本文編號:1452979

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/1452979.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a39e3***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com