大型船舶物資補(bǔ)給搬運(yùn)順序規(guī)劃問題研究
[Abstract]:As a very important subsystem of logistics system, material handling system has been paid more and more attention. In the design and management of this kind of system, the main purpose to be considered is to reduce the handling time and cost. The goal of material supply material handling optimization for large ships is to reduce the handling time in order to improve the maneuverability of large ships. In order to achieve the optimization goal, it can be considered from two aspects: material handling path planning and material handling sequence planning. Both material handling path planning and material handling sequence planning are NP-hard problems. At present, there is no in-depth study on material handling sequence planning. However, in essence, the problem of material handling sequence planning is a kind of scheduling problem, which is very similar to the production scheduling problem to a certain extent. Based on the research on material handling path planning and workshop scheduling at home and abroad, and considering the particularity of material handling sequence planning, this paper makes a systematic study on material handling sequence planning for large ships. The material handling sequence planning problem is abstracted and simplified as a descriptive problem with certain hypothetical conditions. combined with the modeling method of workshop scheduling problem and the characteristics of material handling sequence planning, the material can be transported in parallel in the process of material handling. The uncertainty of material handling sequence caused by the separation and handling of the same material and the existence of mutual exclusion between materials is caused by the uncertainty of material handling sequence. The handling scheduling strategy is designed when the material can be transported in parallel under multiple handling tools. A mathematical model is established to minimize the handling time as the optimization goal. Through the analysis of scheduling algorithm, genetic algorithm is proposed to solve the optimization model, and real number coding is used for chromosome coding. Taking the sequence planning of material supply and transportation of a certain ship as an example, the algorithm is applied to solve the problem. The results show that the results of different handling sequences are different, and the consistency with the simulation results also proves the effectiveness of the algorithm.
【學(xué)位授予單位】:華中科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U676
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳明,宇可,張海洋;船舶海上錨泊并靠貨物補(bǔ)給裝置研制[J];機(jī)電設(shè)備;2005年02期
2 王紹杰;;古帆船模型制作系列文章之十六 古帆船模型的小艇設(shè)備及其制作[J];現(xiàn)代艦船;2000年09期
3 郗望;賈英彬;楊志國;;系統(tǒng)動(dòng)力學(xué)在戰(zhàn)役物資補(bǔ)給運(yùn)輸中的應(yīng)用[J];汽車運(yùn)用;2006年04期
4 朱海;;日本新型訓(xùn)練支援艦[J];現(xiàn)代艦船;2000年06期
5 段雯娟;;驚心動(dòng)魄:“雪龍”號(hào)南極大營救[J];地球;2014年02期
6 ;[J];;年期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
相關(guān)會(huì)議論文 前1條
1 孫明;陶慧賢;劉星伯;;基于符號(hào)定向圖的物資補(bǔ)給過程定性仿真[A];第十屆中國科協(xié)年會(huì)論文集(一)[C];2008年
相關(guān)重要報(bào)紙文章 前4條
1 黃林高 特約記者周彥濤;軍區(qū)航務(wù)軍代處15次為護(hù)航編隊(duì)物資補(bǔ)給[N];戰(zhàn)士報(bào);2011年
2 蔡偉紅 特約記者 孟曉飛;海上物資補(bǔ)給準(zhǔn)確到位[N];中國國防報(bào);2012年
3 記者 袁于飛;“雪龍”號(hào)船上物資補(bǔ)給充足[N];光明日?qǐng)?bào);2014年
4 梁忠春 于春光 特約記者 杜善國;“信息補(bǔ)給”確保戰(zhàn)場裝備保障準(zhǔn)確高效[N];解放軍報(bào);2009年
相關(guān)碩士學(xué)位論文 前1條
1 胡陳;大型船舶物資補(bǔ)給搬運(yùn)順序規(guī)劃問題研究[D];華中科技大學(xué);2014年
本文編號(hào):2494934
本文鏈接:http://www.sikaile.net/kejilunwen/chuanbolw/2494934.html