精益船舶生產(chǎn)計(jì)劃系統(tǒng)研究
本文關(guān)鍵詞:精益船舶生產(chǎn)計(jì)劃系統(tǒng)研究 出處:《上海交通大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 精益船舶生產(chǎn)計(jì)劃 計(jì)劃優(yōu)化模型 改進(jìn)粒子群算法 UML 生產(chǎn)計(jì)劃軟件系統(tǒng)
【摘要】:生產(chǎn)計(jì)劃管理是船廠生產(chǎn)管理的核心,它為船廠組織生產(chǎn)活動(dòng)提供目標(biāo)、指標(biāo)、實(shí)施步驟和預(yù)期成果估計(jì)。現(xiàn)有船舶生產(chǎn)計(jì)劃管理粗放,計(jì)劃管理工具落后,計(jì)劃指導(dǎo)下的生產(chǎn)過(guò)程負(fù)荷不均衡和連續(xù)性差,使得實(shí)際生產(chǎn)過(guò)程中存在大量的生產(chǎn)浪費(fèi),最終導(dǎo)致船舶生產(chǎn)效率低下,造船周期和生產(chǎn)成本難以控制。精益造船正是以消除船舶生產(chǎn)過(guò)程中的各種浪費(fèi)為主要目標(biāo)的生產(chǎn)模式。因此,以精益造船思想來(lái)指導(dǎo)計(jì)劃制定、調(diào)整以及執(zhí)行控制,即推行精益船舶生產(chǎn)計(jì)劃管理,從計(jì)劃層面消除生產(chǎn)過(guò)程中的各種浪費(fèi),可有效提高船廠的生產(chǎn)效率和經(jīng)濟(jì)效益。本文從現(xiàn)有船舶生產(chǎn)計(jì)劃管理過(guò)程中存在的問(wèn)題出發(fā),結(jié)合精益船舶生產(chǎn)計(jì)劃管理流程及特征,構(gòu)建精益船舶生產(chǎn)計(jì)劃優(yōu)化模型,實(shí)現(xiàn)計(jì)劃編制與調(diào)整的智能化高效化,使得計(jì)劃能夠體現(xiàn)消除浪費(fèi)、均衡連續(xù)以及需求拉動(dòng)等精益思想。同時(shí),開(kāi)展生產(chǎn)計(jì)劃管理系統(tǒng)功能分析研究與開(kāi)發(fā)。詳細(xì)內(nèi)容如下:1)分析船舶生產(chǎn)計(jì)劃管理過(guò)程中存在的問(wèn)題,結(jié)合精益造船理念和主要內(nèi)容,構(gòu)建精益船舶生產(chǎn)計(jì)劃管理流程,并研究與分析精益船舶生產(chǎn)計(jì)劃管理過(guò)程中的生產(chǎn)任務(wù)分解結(jié)構(gòu)和計(jì)劃特征。2)針對(duì)精益船舶生產(chǎn)計(jì)劃管理對(duì)計(jì)劃調(diào)整的功能需求,本文從精益船塢搭載計(jì)劃優(yōu)化、精益先行中日程計(jì)劃優(yōu)化、精益后行中日程計(jì)劃優(yōu)化及精益先行加工中日程計(jì)劃優(yōu)化4個(gè)方面構(gòu)建精益船舶生產(chǎn)計(jì)劃優(yōu)化模型。3)針對(duì)計(jì)劃優(yōu)化模型變量離散和非線性問(wèn)題,提出以改進(jìn)的粒子群算法為核心的精益生產(chǎn)計(jì)劃優(yōu)化模型求解流程,以實(shí)際船廠生產(chǎn)計(jì)劃優(yōu)化問(wèn)題為例,對(duì)比分析優(yōu)化前后生產(chǎn)計(jì)劃的性能來(lái)驗(yàn)證模型的高效性。結(jié)果表明,優(yōu)化后生產(chǎn)計(jì)劃可行性更好,生產(chǎn)負(fù)荷更均衡,資源利用率更高。4)利用UML處理復(fù)雜系統(tǒng)的優(yōu)勢(shì),進(jìn)行精益船舶生產(chǎn)計(jì)劃系統(tǒng)的分析與設(shè)計(jì)。初步實(shí)現(xiàn)系統(tǒng)功能,開(kāi)發(fā)系統(tǒng)界面,實(shí)例驗(yàn)證系統(tǒng)運(yùn)行狀況和流程。
[Abstract]:Production planning management is the core of the production management of the shipyard. It provides targets, indicators, implementation steps and expected results for the production activities of the shipyard. The existing ship production plan management, plan management tools behind, plan under the guidance of the production process of load imbalance and poor continuity, the existence of a large number of production waste in the actual production process, resulting in low efficiency of ship production, shipbuilding cycle and production cost is difficult to control. Lean shipbuilding is the production model which aims at eliminating all kinds of waste in the process of ship production. Therefore, guided by lean shipbuilding idea, we should guide the formulation, adjustment and implementation control of the plan, that is, to implement lean ship production plan management and eliminate all kinds of waste in the production process from the planning level, we can effectively improve the production efficiency and economic efficiency of the shipyard. This article is from the existing ship production plan management process, combined with lean ship production plan management process and characteristics, construct the production plan optimization model of lean ship, intelligent planning and adjustment of the plan can reflect the high efficiency, eliminate waste, continuous and balanced demand and lean thinking. At the same time, we carry out the research and development of the function analysis of the production planning management system. The detailed contents are as follows: 1) analysis of the existing ship production plan management process, combined with lean shipbuilding concept and main content of construction of lean ship production plan management process, and the process of research and analysis of lean production plan management in ship production task decomposition structure and plan features. 2) functional requirements for lean production planning and management of ship plan adjustment, this paper from the lean dock equipped with plan optimization, schedule optimization, in advance of lean lean leap in plan optimization and schedule ahead of schedule in the process of Lean Construction Optimization optimization lean ship production plan model 4 aspects. 3) according to the plan optimization model with discrete variables and nonlinear problems, puts forward the optimization plan for lean production process model based on improved particle swarm algorithm as the core, to the actual shipyard production plan optimization problems for example, efficiency comparative analysis of performance before and after optimization of production plan to validate the model. The results show that the optimized production plan is better, the production load is more balanced and the utilization of resources is higher. 4) the analysis and design of lean ship production planning system are carried out by using the advantages of UML to deal with complex systems. The system function is realized preliminarily, the system interface is developed, and the instance verifies the running status and process of the system.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U673
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙清華;;微機(jī)在公司生產(chǎn)計(jì)劃管理中的應(yīng)用[J];一重技術(shù);2006年05期
2 張躍,張明龍,,歸寧;微機(jī)在經(jīng)營(yíng)生產(chǎn)計(jì)劃管理中的應(yīng)用[J];上海汽輪機(jī);1995年01期
3 Oliver Herkommer ,Oliver Schmidt;建立數(shù)字化工廠[J];現(xiàn)代制造;2002年21期
4 陳鈞儒;;新環(huán)境下企業(yè)生產(chǎn)計(jì)劃管理研究[J];科技創(chuàng)新與應(yīng)用;2013年12期
5 趙虹;劉建峰;;“三位一體”加強(qiáng)生產(chǎn)計(jì)劃管理[J];科技視界;2013年14期
6 鄒世濱,劉寧;計(jì)算機(jī)在公司生產(chǎn)計(jì)劃管理中的應(yīng)用[J];一重技術(shù);2002年01期
7 趙虹;;“三位一體”加強(qiáng)生產(chǎn)計(jì)劃管理[J];農(nóng)電管理;2013年S1期
8 李彥滋;;淺談裝備制造業(yè)生產(chǎn)計(jì)劃管理[J];中國(guó)高新技術(shù)企業(yè);2008年19期
9 徐天松 ,錢慧富 ,劉玉峰 ,邱正峰 ,侯龍飛;造船生產(chǎn)計(jì)劃管理的信息化研究[J];上海造船;2004年02期
10 吳洪寶;;多品種小批量的生產(chǎn)計(jì)劃管理[J];民營(yíng)科技;2009年12期
相關(guān)會(huì)議論文 前3條
1 戴園生;;產(chǎn)銷系統(tǒng)中生產(chǎn)計(jì)劃管理系統(tǒng)分析與設(shè)計(jì)[A];中國(guó)計(jì)量協(xié)會(huì)冶金分會(huì)2008年會(huì)論文集[C];2008年
2 戴園生;;產(chǎn)銷系統(tǒng)中生產(chǎn)計(jì)劃管理系統(tǒng)分析與設(shè)計(jì)[A];2008全國(guó)第十三屆自動(dòng)化應(yīng)用技術(shù)學(xué)術(shù)交流會(huì)論文集[C];2008年
3 何詩(shī)興;張吾勝;;APS系統(tǒng)在馬鋼新區(qū)板帶生產(chǎn)中應(yīng)用和分析[A];2011第十六屆全國(guó)自動(dòng)化技術(shù)與應(yīng)用學(xué)術(shù)年會(huì)專輯[C];2011年
相關(guān)重要報(bào)紙文章 前5條
1 李明;一重用信息化推動(dòng)企業(yè)發(fā)展[N];中國(guó)機(jī)電日?qǐng)?bào);2002年
2 李玉山;“管理部”制切實(shí)可行[N];中國(guó)船舶報(bào);2000年
3 通訊員 徐建超;武漢船機(jī)廠信息化建設(shè)見(jiàn)成效[N];中國(guó)船舶報(bào);2002年
4 本報(bào)記者 姜國(guó)華;信息化給“銅牛”帶來(lái)了什么[N];中國(guó)紡織報(bào);2005年
5 廣東省順德市大良區(qū)震德塑料機(jī)械廠有限公司ERP辦公室 向京梅;有機(jī)消化ERP[N];計(jì)算機(jī)世界;2002年
相關(guān)碩士學(xué)位論文 前10條
1 張培靚;基于資源約束的高級(jí)計(jì)劃排程系統(tǒng)設(shè)計(jì)[D];復(fù)旦大學(xué);2013年
2 徐琛;A企業(yè)生產(chǎn)計(jì)劃管理改進(jìn)研究[D];華東理工大學(xué);2016年
3 尚爾斌;精益船舶生產(chǎn)計(jì)劃系統(tǒng)研究[D];上海交通大學(xué);2015年
4 張煥蛟;青島特銳德電氣有限公司生產(chǎn)計(jì)劃管理系統(tǒng)優(yōu)化研究[D];吉林大學(xué);2011年
5 張_";造船企業(yè)生產(chǎn)計(jì)劃管理信息化研究[D];大連海事大學(xué);2010年
6 程亮;旭通科技有限公司生產(chǎn)計(jì)劃管理研究[D];湖南大學(xué);2006年
7 李曉貞;制造企業(yè)生產(chǎn)計(jì)劃管理[D];天津大學(xué);2004年
8 黃國(guó)興;基于實(shí)例推理的生產(chǎn)計(jì)劃管理[D];合肥工業(yè)大學(xué);2005年
9 盧艷芳;H航空企業(yè)生產(chǎn)計(jì)劃管理的研究與應(yīng)用[D];華東理工大學(xué);2015年
10 李錦華;航天十一院科研生產(chǎn)計(jì)劃管理改進(jìn)研究[D];吉林大學(xué);2013年
本文編號(hào):1338497
本文鏈接:http://www.sikaile.net/kejilunwen/chuanbolw/1338497.html