工程系統(tǒng)的開發(fā)階段,中文例句,英文例句
本文關(guān)鍵詞:系統(tǒng)安全工程在系統(tǒng)開發(fā)階段的應(yīng)用研究,由筆耕文化傳播整理發(fā)布。
1.
initiate stage of the engineering system
工程系統(tǒng)的開發(fā)階段
2.
The Applied Research of System Security Engineering in the System Development Phase;
系統(tǒng)安全工程在系統(tǒng)開發(fā)階段的應(yīng)用研究
3.
EXPOUND THE PRACTICAJ DIRECTION IN CURRENT PERIOD OF THE SYSTEMS ENGINEERING OF ENVIRONMENT
試論環(huán)境系統(tǒng)工程現(xiàn)階段的實踐方向
4.
Development of Financing Control System in the Construction;
公路施工階段投資控制信息系統(tǒng)開發(fā)研究
5.
"Systems analysis: In information processing, a phase of systems engineering."
系統(tǒng)分析:在信息處理之中,系統(tǒng)工程的一個階段。
6.
The Research on Construction Phase Construction Project of Quality Control System
建筑工程項目施工階段質(zhì)量控制的系統(tǒng)研究
7.
The Contract of Building Construction Systems Management;
工程建設(shè)(施工階段)合同系統(tǒng)管理
8.
Two-phase Method of Building Information Model and its Applying in Development of Information System;
兩階段建模方法及其在信息系統(tǒng)開發(fā)中的應(yīng)用
9.
However, this procedure requires central software to connect into legacy systems;this is still in the early stages of development.
但這種過程需要中心軟件,接入已有的舊系統(tǒng),這尚處于開發(fā)的初期階段。
10.
Design and Achievement of the Terdering and Bidding System about Enjerring Project Process Based on the Data Intergration
基于數(shù)據(jù)集成的工程施工階段招投標(biāo)系統(tǒng)的設(shè)計與實現(xiàn)
11.
Study on Expert System for Management s Quality Control of Building Construction in Construction Period;
建筑工程監(jiān)理施工階段質(zhì)量控制專家系統(tǒng)研究
12.
Study on the Applications of Operation Cost Management &Value Engineering in the Stage of Product Development &Design;
作業(yè)成本管理與價值工程在產(chǎn)品開發(fā)設(shè)計階段的應(yīng)用
13.
Real Estate Corporate Public Relations in Construction Phase;
工程建設(shè)階段房地產(chǎn)開發(fā)企業(yè)公關(guān)策略
14.
I&C System Reliability Process Control in Capital Construction Stage
基建階段的熱控系統(tǒng)可靠性過程控制
15.
the highest degree of development of an art or technique at a particular time.
工藝在某一階段發(fā)展的最高程度。
16.
The Application of the ITIL Service Supporting Management in the Information Engineering Operation & Maintenance Supervision;
ITIL服務(wù)支持管理在信息系統(tǒng)工程運行維護(hù)階段監(jiān)理中的應(yīng)用
17.
Should log out when leaving a workstation for an extended period.
為某一延伸階段而離開工作站時應(yīng)退出(系統(tǒng))。
18.
Development on the Curriculum of Manufacturing Adjustment & Maintenance of Electrical Control System Based on the Systemic Working Process
基于“工作過程系統(tǒng)化”的課程開發(fā)
本文關(guān)鍵詞:系統(tǒng)安全工程在系統(tǒng)開發(fā)階段的應(yīng)用研究,由筆耕文化傳播整理發(fā)布。
本文編號:68491
本文鏈接:http://www.sikaile.net/kejilunwen/anquangongcheng/68491.html