呂臨能化千萬噸礦井通風保障技術(shù)研究
本文選題:礦井通風 切入點:資源整合 出處:《遼寧工程技術(shù)大學》2017年碩士論文 論文類型:學位論文
【摘要】:隨著國家經(jīng)濟的快速發(fā)展,全國煤炭產(chǎn)量也達到了歷史的最高點,各大礦局通過資源整合不斷擴大礦井產(chǎn)量,呂臨能化千萬噸礦井的建設(shè)就是其中典型的例子。呂臨能化千萬噸礦井的建設(shè)主要是把龐龐塔礦與千萬噸項目部整合為一個整體,通過擴大現(xiàn)有產(chǎn)量形成千萬噸生產(chǎn)規(guī)模的現(xiàn)代化大型礦井。為了實現(xiàn)整合后的千萬噸礦井能夠有一個可靠、穩(wěn)定的通風系統(tǒng)去保障安全生產(chǎn),本論文針對龐龐塔礦與千萬噸項目部現(xiàn)階段的礦井通風系統(tǒng)運行情況進行分析研究。首先對龐龐塔礦與千萬噸項目部通過750大巷連通為一個整體進行模擬分析與方案制定,找出各個方案的優(yōu)缺點,然后通過對各個貫通方案進行全面比較和綜合分析得出一個最佳的貫通方案。在750大巷以最佳方案貫通后,對龐龐塔礦與千萬噸項目部的通風系統(tǒng)進行全面分析,驗證貫通后千萬噸礦井與750巷道風流的穩(wěn)定性,找出通風系統(tǒng)中的不足,尤其是阻力過大區(qū)域和風量利用情況,提出合理的解決措施。在前兩步的基礎(chǔ)上,為提高整合后的千萬噸礦井抗災變能力,對龐龐塔礦與項目部采區(qū)獨立通風、風機停轉(zhuǎn)、全礦井的反風等進行仿真模擬分析。通過模擬的方法提前預測風機停轉(zhuǎn)、反風后礦井通風系統(tǒng)的變化,從而制定應對井下火災等突發(fā)情況的應急預案。通過對以上三個主要部分的分析研究,要使龐龐塔礦與千萬噸項目部順利貫通后的千萬噸大型現(xiàn)代化礦井有一個穩(wěn)定可靠的通風系統(tǒng),為千萬噸礦井以后的安全生產(chǎn)打下堅實的基礎(chǔ)。
[Abstract]:With the rapid development of the national economy, the national coal production has also reached the highest point in history. The construction of the 10 million ton mine in Lv Lineng is a typical example. The construction of the 10 million ton mine in Lu Lineng is mainly to integrate the Pompangta mine with the 10 million ton project department as a whole. A modern large-scale mine with a production scale of 10 million tons by expanding its existing output. In order to achieve the integration of the 10 million ton mine, there can be a reliable and stable ventilation system to ensure the safety of production. This paper analyzes and studies the operation of ventilation system in Pompangta Mine and 10 million ton Project Department at the present stage. First of all, it simulates, analyzes and formulates the scheme of Pompangta Mine and 10 million ton Project Department through the connection of 750 roadways as a whole. Find out the merits and demerits of each scheme, and then through the comprehensive comparison and comprehensive analysis of each through scheme, we can get the best through plan. After the 750 alleys pass through with the best plan, The ventilation system of Pompangta mine and ten million ton project department is comprehensively analyzed to verify the stability of the ventilation flow in the ten million ton mine and 750 roadway after the completion, and to find out the shortcomings of the ventilation system, especially in the area of excessive resistance and the utilization of air volume. On the basis of the first two steps, in order to improve the disaster resistance ability of the integrated ten million ton mine, the ventilation of Pompangta mine and the mining area of the project department are independently ventilated and the fan stops running. Through the method of simulation, the change of mine ventilation system is predicted in advance after the fan is stopped and the ventilation system is changed after the reverse air. In order to formulate emergency plans to deal with underground fire and other emergencies. Through the analysis and study of the above three main parts, A stable and reliable ventilation system will be established between Pompangta Mine and the ten million ton project department, which will lay a solid foundation for the safety production of the ten million ton mine.
【學位授予單位】:遼寧工程技術(shù)大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:TD72
【參考文獻】
相關(guān)期刊論文 前10條
1 馬恒;倪景峰;劉劍;;礦井通風管理信息系統(tǒng)開發(fā)及其應用[J];華北科技學院學報;2014年08期
2 王海寧;彭斌;彭家蘭;劉成敏;汪光鑫;;大型復雜礦井通風系統(tǒng)的共性問題分析與優(yōu)化實踐[J];安全與環(huán)境學報;2014年03期
3 趙文利;;礦井通風的安全管理探析[J];煤炭技術(shù);2013年05期
4 李春生;;衰老礦井通風系統(tǒng)穩(wěn)定經(jīng)濟運行的對策與措施[J];煤炭科學技術(shù);2012年09期
5 謝和平;王金華;申寶宏;劉見中;姜鵬飛;周宏偉;劉虹;吳剛;;煤炭開采新理念——科學開采與科學產(chǎn)能[J];煤炭學報;2012年07期
6 王海寧;劉菊紅;;金屬礦山熱源散熱影響因子及通風降溫技術(shù)研究[J];礦業(yè)研究與開發(fā);2012年02期
7 薛毅;;關(guān)于中國古代煤炭歷史研究的幾個基本問題[J];中國礦業(yè)大學學報(社會科學版);2012年01期
8 馬恒;尹彬;劉劍;;礦井風流溫度預測分析研究[J];中國安全科學學報;2010年11期
9 程磊;黨海波;吳磊;;礦井通風網(wǎng)絡(luò)分析方法研究現(xiàn)狀與發(fā)展趨勢[J];煤;2010年08期
10 朱華新;魏連江;張飛;李紀洲;蘇松;;礦井通風可視化仿真系統(tǒng)的改進研究[J];采礦與安全工程學報;2009年03期
相關(guān)碩士學位論文 前7條
1 彭斌;大型復雜礦井通風系統(tǒng)優(yōu)化研究[D];江西理工大學;2014年
2 張也弛;中國煤礦企業(yè)安全生產(chǎn)的政府監(jiān)管研究[D];吉林財經(jīng)大學;2014年
3 黃紫彬;擴能礦井的通風系統(tǒng)改造研究[D];江西理工大學;2011年
4 屈世甲;礦井通風基礎(chǔ)數(shù)據(jù)獲取及網(wǎng)絡(luò)圖優(yōu)化方法的研究[D];西安科技大學;2010年
5 史東濤;基于靈敏度的風量異常與風量調(diào)節(jié)的分析研究[D];西安科技大學;2008年
6 賈廷貴;五龍礦通風系統(tǒng)優(yōu)化改造研究[D];遼寧工程技術(shù)大學;2005年
7 邱進偉;礦井通風系統(tǒng)分析與優(yōu)化研究[D];安徽理工大學;2005年
,本文編號:1652575
本文鏈接:http://www.sikaile.net/kejilunwen/anquangongcheng/1652575.html