貴都高速二合同項目成本分析及控制
[Abstract]:With the development of market economy, the factors affecting construction cost become more and more complicated and diversified. In such an environment, on the one hand, the difficulty of cost control is increased, on the other hand, the importance and necessity of cost analysis are reflected more. Through the cost analysis of construction project, the management planning of the project process can be strengthened, and the current situation of project cost can be grasped. This paper analyzes and identifies the factors of project cost risk or potential loss, takes measures to reduce and control the risk in time, starts with finding out the cause of cost profit and loss, formulates the corresponding countermeasures, and finds out ways to reduce the construction cost of the project department and reduce the unreasonable consumption. Achieve the goal of reducing project cost. This paper introduces the project cost composition of the second contract of Guidu, analyzes the cost of the project by using the actual data of the project, and analyzes the main cost items and their influence on the total cost by using the method of comparison. The cost of each project is analyzed in detail, and the specific cost is analyzed in detail by means of factor analysis method, target cost method and quota cost method, and the comparison between actual cost and quota cost is carried out. To find out the specific cost changes of the project and its influencing factors, the main factors that lead to the increase of the total cost of the second contract project are: the increase of labor price, the increase of labor quantity, the decrease of work efficiency, the increase of material price, The increase of material unit consumption and material quantity, and the increase of other direct costs due to the construction organization measures and construction organization design, are the main factors leading to the increase of the actual cost of the project. Through revealing the influence of the cost change on the construction cost, the effective control measures to reduce the project cost are put forward. Through the analysis of project cost, this paper aims to reveal the current situation of cost analysis and control in construction enterprises, promote enterprises to set up scientific concept of internal cost management, and strengthen the work of project cost analysis. Ji Xi can promote the construction enterprise cost management to take the standardized, sound and scientific track, and then improve the economic benefits of the construction enterprise.
【學(xué)位授予單位】:長沙理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2012
【分類號】:F542;F285
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 周戒;;關(guān)于工程項目成本管理的探討[J];四川建筑科學(xué)研究;2006年05期
2 鄭豪民;;建筑工程項目成本控制淺析[J];平頂山工學(xué)院學(xué)報;2006年02期
3 龍滿初;;建筑工程項目施工成本控制與管理措施[J];廣東建材;2009年07期
4 涂足珍;;項目施工成本分析和控制[J];廣東科技;2011年06期
5 楊育林;;如何開展施工項目成本分析[J];國際商務(wù)財會;2009年05期
6 張鴻斌;;論施工項目成本控制[J];合作經(jīng)濟(jì)與科技;2009年19期
7 劉文溶;;施工企業(yè)成本管理弱化的原因與對策[J];經(jīng)濟(jì)師;2006年08期
8 彭靜;;淺論施工項目成本控制[J];建筑經(jīng)濟(jì);2009年S1期
9 王永峰;建筑工程項目成本的量化管理[J];建筑施工;2005年02期
10 李雙錄,王春福;論建筑管理的項目控制[J];山西建筑;2002年06期
相關(guān)碩士學(xué)位論文 前5條
1 閻善華;建筑工程項目成本控制研究[D];大連理工大學(xué);2006年
2 李峰;時代集團(tuán)建筑施工項目成本管理研究[D];哈爾濱工程大學(xué);2007年
3 李衛(wèi)國;我國建筑工程項目成本控制研究[D];哈爾濱工程大學(xué);2007年
4 周紹陽;建筑工程項目成本管理研究[D];廣西大學(xué);2008年
5 郭金武;A公司建筑項目成本管理研究[D];北京交通大學(xué);2008年
,本文編號:2201259
本文鏈接:http://www.sikaile.net/jingjilunwen/jtysjj/2201259.html