基于風(fēng)險分擔(dān)的貴陽市城市軌道交通工程施工合同條款優(yōu)化研究

發(fā)布時間:2018-05-27 07:27

  本文選題:城市軌道交通 + 合同條款優(yōu)化; 參考:《天津理工大學(xué)》2013年碩士論文


【摘要】:由于合同的不完備性,許多風(fēng)險因素并不能在合同中完全體現(xiàn),導(dǎo)致實(shí)際實(shí)施過程中出現(xiàn)新的變化時,承發(fā)包雙方會產(chǎn)生糾紛扯皮事件,而合同的不完備性一方面是本身的特點(diǎn)決定的,另一方面則是因?yàn)楹贤侗镜倪m用性較差,貴陽市城市軌道交通工程施工合同采用的《標(biāo)準(zhǔn)施工合同范本》(2007版),在工程實(shí)施過程中出現(xiàn)了一些糾紛事件,導(dǎo)致造價失控,因此,對施工合同進(jìn)行優(yōu)化,盡量對可能遇到的風(fēng)險事件事先預(yù)設(shè)處理機(jī)制,成為本文研究的重點(diǎn),F(xiàn)有對合同優(yōu)化的研究多集中在PPP項(xiàng)目上,,DBB模式下的研究甚為少見,這也正是本文研究的切入點(diǎn)。 由于風(fēng)險分擔(dān)是合同的主要內(nèi)容,本文從風(fēng)險分擔(dān)的視角對貴陽市城市軌道交通工程的施工合同條款進(jìn)行優(yōu)化。風(fēng)險分擔(dān)以合同簽訂為分界點(diǎn),劃分為合同簽訂前初始風(fēng)險分擔(dān)以及合同簽訂以后的風(fēng)險再分擔(dān)過程,本文主要在這兩個階段對貴陽市城市軌道交通工程的施工合同進(jìn)行優(yōu)化。 首先,對貴陽市城市軌道交通工程的施工合同進(jìn)行分析,并通過問卷調(diào)查法確定其實(shí)際風(fēng)險分擔(dān)方案,分析標(biāo)桿城市軌道交通工程的風(fēng)險分擔(dān)方案,并與貴陽市城市軌道交通工程合同的風(fēng)險分擔(dān)方案對比,對其風(fēng)險分擔(dān)方案進(jìn)行合理性分析。確定分擔(dān)不合理的風(fēng)險因素,作為貴陽市城市軌道交通工程施工合同條款優(yōu)化的對象,設(shè)計(jì)這些風(fēng)險因素的專用條款,對合同進(jìn)行優(yōu)化。 其次,從合同履行的視角設(shè)計(jì)了風(fēng)險再分擔(dān)的途徑,通過調(diào)研確定貴陽市城市軌道交通工程在實(shí)施中出現(xiàn)的實(shí)際風(fēng)險因素,并同上述確定的初始分擔(dān)不合理的風(fēng)險因素,共同作為風(fēng)險再分擔(dān)的對象,從風(fēng)險再分擔(dān)的視角確定其再分擔(dān)的方式和重新分配,并引入了開放性條款,據(jù)此設(shè)計(jì)其再分擔(dān)的條款,確定這些風(fēng)險因素的應(yīng)對策略,實(shí)現(xiàn)對合同文本的優(yōu)化,提供風(fēng)險分擔(dān)優(yōu)化的建議。
[Abstract]:Because of the incompleteness of the contract, many risk factors can not be fully reflected in the contract. When there are new changes in the actual implementation process, disputes will arise between the contracting parties. On the one hand, the incompleteness of the contract is determined by its own characteristics, on the other hand, it is because of the poor applicability of the model contract. The Model of Standard Construction contract adopted in the construction contract of Guiyang City Urban Rail Transit Project is the 2007 edition. During the implementation of the project, there are some disputes which lead to the cost losing control. Therefore, the construction contract is optimized. As far as possible, the preset mechanism of risk events is the focus of this paper. Most of the existing researches on contract optimization are focused on PPP projects, which is the breakthrough point of this paper. As risk sharing is the main content of the contract, this paper optimizes the construction contract terms of Guiyang urban rail transit project from the perspective of risk sharing. Risk sharing is divided into the initial risk sharing before the contract signing and the risk re-sharing process after the contract signing. This paper mainly optimizes the construction contract of Guiyang urban rail transit project in these two stages. First of all, the construction contract of Guiyang urban rail transit project is analyzed, and the actual risk sharing scheme is determined by questionnaire, and the risk sharing scheme of benchmark urban rail transit project is analyzed. Compared with the risk sharing scheme of Guiyang urban rail transit project contract, the rationality of the risk sharing scheme is analyzed. As the object of optimizing the construction contract terms of Guiyang urban rail transit project, the special clauses of these risk factors are designed, and the contract is optimized. Secondly, from the perspective of contract performance, the paper designs the way of risk redistribution, determines the actual risk factors in the implementation of Guiyang urban rail transit project through investigation, and shares the unreasonable risk factors with the above identified initial risk factors. As the object of risk redistribution, this paper determines the way and redistribution of risk re-sharing from the perspective of risk re-sharing, and introduces the open clause, according to which the article of re-sharing is designed, and the coping strategies of these risk factors are determined. Optimize the contract text and provide advice on risk sharing optimization.
【學(xué)位授予單位】:天津理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F572.88

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 杜亞靈;尹貽林;;不完全契約視角下的工程項(xiàng)目風(fēng)險分擔(dān)框架研究[J];重慶大學(xué)學(xué)報(社會科學(xué)版);2012年01期

2 李平;;工程項(xiàng)目風(fēng)險分擔(dān)及合同變更的研究[J];重慶建筑;2007年07期

3 楊衛(wèi)華;戴大雙;韓明杰;;污水處理BOT項(xiàng)目特許定價的關(guān)鍵風(fēng)險實(shí)證研究[J];大連理工大學(xué)學(xué)報(社會科學(xué)版);2006年02期

4 張淑敏;王詢;;組織內(nèi)人工設(shè)計(jì)的激勵契約不完備性與履約障礙[J];大連理工大學(xué)學(xué)報(社會科學(xué)版);2006年03期

5 杜亞靈;劉衛(wèi)星;張曉麗;;基于風(fēng)險分擔(dān)的BT項(xiàng)目變更管理研究[J];都市快軌交通;2012年03期

6 朱建華;;論BOT項(xiàng)目的風(fēng)險與風(fēng)險分擔(dān)[J];法制與社會;2010年03期

7 孟憲海,趙啟;EPC模式下業(yè)主和承包商的風(fēng)險分擔(dān)與應(yīng)對[J];國際經(jīng)濟(jì)合作;2004年12期

8 張尚;方志達(dá);;承包商在設(shè)計(jì)—建造項(xiàng)目上的索賠管理[J];國際經(jīng)濟(jì)合作;2010年07期

9 何伯森,萬彩蕓;BOT項(xiàng)目的風(fēng)險分擔(dān)與合同管理[J];中國港灣建設(shè);2001年05期

10 嚴(yán)玲;趙華;;基于項(xiàng)目控制權(quán)的代建項(xiàng)目風(fēng)險分擔(dān)機(jī)制[J];中國港灣建設(shè);2008年05期

相關(guān)博士學(xué)位論文 前5條

1 柯永建;中國PPP項(xiàng)目風(fēng)險公平分擔(dān)[D];清華大學(xué);2010年

2 何濤;基于PPP模式的交通基礎(chǔ)設(shè)施項(xiàng)目風(fēng)險分擔(dān)合理化研究[D];天津大學(xué);2011年

3 周曉宏;R&D項(xiàng)目管理標(biāo)準(zhǔn)化及其策略研究[D];浙江大學(xué);2006年

4 徐勇戈;非對稱信息下政府投資項(xiàng)目實(shí)行代建制的相關(guān)機(jī)制研究[D];西安建筑科技大學(xué);2006年

5 雷新途;不完備財(cái)務(wù)契約締結(jié)和履行機(jī)制研究[D];中南大學(xué);2009年

相關(guān)碩士學(xué)位論文 前6條

1 宋振華;承包商視角下業(yè)主風(fēng)險再分配的應(yīng)對研究[D];天津理工大學(xué);2011年

2 鄭輝;關(guān)系契約:理論構(gòu)建與現(xiàn)實(shí)考量[D];西南政法大學(xué);2011年

3 路菲;內(nèi)容分析與文獻(xiàn)計(jì)量的比較與綜合研究[D];南京理工大學(xué);2004年

4 何龍江;建設(shè)工程合同糾紛解決機(jī)制研究[D];南京林業(yè)大學(xué);2006年

5 陳探;論長期合同調(diào)整[D];清華大學(xué);2007年

6 魯寶智;07標(biāo)準(zhǔn)施工招標(biāo)文件下合同不完備性的度量及補(bǔ)償研究[D];天津理工大學(xué);2012年



本文編號:1941052

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jingjilunwen/jtysjj/1941052.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶ae0f7***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com