佛山西站樞紐新城配電網(wǎng)規(guī)劃研究
[Abstract]:As the most developed area in the west coast of Pearl River Estuary and Guangdong Province, the demand for electricity load in Nanhai District of Foshan City is increasing rapidly. In recent years, the scale of grid investment has lagged behind the economic development, resulting in the bottleneck of economic growth in the South China Sea. As a terminal connected with users, 10kV distribution network is the most important part of the whole grid. Therefore, through the structure of the distribution network, the distribution points are continuously optimized to meet the needs of the new load to the greatest extent, which has become a key issue in the research of power technology in recent years. Based on the analysis of the existing substation and power grid in Foshan West Railway Station, combined with the report and installation of all the large users, the government carried out the load forecasting for the detailed planning of the area. In order to determine the planning and design plan of the medium and low voltage distribution network of Foshan West Railway Station hub, form the comprehensive project database of the new construction and transformation project, and on the basis of this, the investment estimation and economic comparison are carried out, and the final scheme is determined according to this. In order to solve the problems existing in the distribution network operation of Foshan West Railway Station, and meet the load demand of the new users. The contents of this plan include: analyzing the operation status of 10kV distribution network in Foshan West Railway Station, forecasting the power network load before 2020, determining the technical guidelines of planning and design basis, completing the new construction and rebuilding scheme, and so on. First of all, the operation status of 10kV distribution network in Foshan West Railway Station is analyzed, including the operation and maintenance of 10kV distribution network and key equipment indicators, the statistics of service time of various equipment, the load rate of higher power supply. Superior power supply 10kV cabinets use analysis and other content. Through the statistical analysis of the above indexes, it can be concluded that the grid structure is reasonable, the operation condition of various equipments is good, whether the distribution of power points and the power supply radius meet the requirements, whether the load borne by higher substations is reasonable or not, and so on. In order to determine the direction and thinking of the distribution network planning plan of Foshan West Railway Station. Secondly, according to the loading situation of all the large users such as Foshan West Railway Station, the government forecasts the detailed planning of the area, including the maximum load demand of the 10kV distribution network and its superior power supply, and the forecast of the actual load utilization rate and so on. The total power supply, the position of the power point and the topology of the power supply are determined by the prediction results. Finally, determine the detailed new, reconstruction program. The specific contents include power supply capacity, position and construction time, line direction of 10kV line and transformer capacity, distribution room, switch room and other equipment distribution points, and finally form a complete new construction, transformation scheme, etc. And complete the corresponding project library.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類(lèi)號(hào)】:TM715
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 巴寶華;魏玉仁;;淺談10kV配電網(wǎng)規(guī)劃設(shè)計(jì)方法[J];科技創(chuàng)新與應(yīng)用;2014年33期
2 嚴(yán)誠(chéng);;淺談配電網(wǎng)規(guī)劃存在的問(wèn)題及措施[J];企業(yè)技術(shù)開(kāi)發(fā);2014年33期
3 黃嘉健;鄭文杰;;基于元件失效模型的配電網(wǎng)改造方法研究[J];廣東電力;2014年11期
4 茍育洲;路昕;;110kV及以下配電網(wǎng)建設(shè)規(guī)劃設(shè)計(jì)要素分析[J];科技與企業(yè);2014年22期
5 趙江偉;;基于最大供電能力的智能配電網(wǎng)規(guī)劃與運(yùn)行新思路[J];價(jià)值工程;2014年31期
6 鐘俊輝;;關(guān)于城市配電網(wǎng)規(guī)劃的問(wèn)題及對(duì)策初探[J];科技與創(chuàng)新;2014年19期
7 高涵冰;劉麗君;;有關(guān)配電網(wǎng)規(guī)劃建設(shè)要點(diǎn)探析[J];科技風(fēng);2014年17期
8 王樂(lè);趙海平;;對(duì)10kv配電網(wǎng)供電可靠性的研究[J];科學(xué)中國(guó)人;2014年14期
9 肖裕富;;配電網(wǎng)規(guī)劃中電力負(fù)荷預(yù)測(cè)中的關(guān)鍵問(wèn)題分析[J];科技經(jīng)濟(jì)市場(chǎng);2014年06期
10 劉勝利;陳建華;曹陽(yáng);陳剛國(guó);;基于N-1和負(fù)荷特性的配電網(wǎng)最大接入容量研究[J];電力系統(tǒng)保護(hù)與控制;2014年12期
相關(guān)博士學(xué)位論文 前5條
1 唐慧;區(qū)域電網(wǎng)智能化發(fā)展水平綜合評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2011年
2 楊衛(wèi)紅;城市電網(wǎng)規(guī)劃風(fēng)險(xiǎn)評(píng)價(jià)模型及風(fēng)險(xiǎn)規(guī)避方法研究[D];華北電力大學(xué)(北京);2010年
3 唐躍中;數(shù)字化電網(wǎng)若干關(guān)鍵技術(shù)研究[D];浙江大學(xué);2010年
4 羅鳳章;現(xiàn)代配電系統(tǒng)評(píng)價(jià)理論及其綜合應(yīng)用[D];天津大學(xué);2010年
5 王迎秋;城市電網(wǎng)規(guī)劃項(xiàng)目關(guān)鍵問(wèn)題研究[D];天津大學(xué);2007年
相關(guān)碩士學(xué)位論文 前10條
1 王亞男;配電網(wǎng)運(yùn)行水平和供電能力評(píng)估綜合管理系統(tǒng)研究與開(kāi)發(fā)[D];湖南大學(xué);2013年
2 范文明;地級(jí)電力市場(chǎng)中智能電網(wǎng)發(fā)展研究[D];華北電力大學(xué);2013年
3 馬立芝;10KV及以下配電網(wǎng)線(xiàn)損管理系統(tǒng)改進(jìn)研究[D];華北電力大學(xué);2013年
4 陳志勇;配電網(wǎng)電壓層級(jí)優(yōu)化研究[D];廣東工業(yè)大學(xué);2012年
5 包依平;電網(wǎng)運(yùn)行方式評(píng)估及系統(tǒng)開(kāi)發(fā)[D];湖南大學(xué);2012年
6 黃勇建;城市配電網(wǎng)規(guī)劃及其技術(shù)評(píng)估方法研究[D];南昌大學(xué);2010年
7 金世鑫;配電網(wǎng)接線(xiàn)模式識(shí)別的優(yōu)化與提速[D];天津大學(xué);2010年
8 程璐;基于配電網(wǎng)改造的智能電網(wǎng)投融資模式研究[D];北京交通大學(xué);2010年
9 陶衛(wèi)君;城市電網(wǎng)規(guī)劃風(fēng)險(xiǎn)評(píng)價(jià)與規(guī)避研究[D];華北電力大學(xué)(北京);2010年
10 姚麗;中壓配電網(wǎng)絡(luò)自動(dòng)規(guī)劃的研究[D];天津大學(xué);2009年
,本文編號(hào):2388335
本文鏈接:http://www.sikaile.net/jingjilunwen/jiliangjingjilunwen/2388335.html