天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

分布式光伏電站接入配電網(wǎng)優(yōu)化規(guī)劃研究

發(fā)布時(shí)間:2018-01-11 18:19

  本文關(guān)鍵詞:分布式光伏電站接入配電網(wǎng)優(yōu)化規(guī)劃研究 出處:《東南大學(xué)》2017年碩士論文 論文類型:學(xué)位論文


  更多相關(guān)文章: 光伏電站 分布式并網(wǎng) 隨機(jī)優(yōu)化 選址定容 改進(jìn)蒙特卡洛模擬


【摘要】:能源是國民經(jīng)濟(jì)發(fā)展和人民生活水平提高的重要物質(zhì)保證。近年來,由于能源危機(jī)的爆發(fā)和環(huán)境污染的日趨嚴(yán)重,煤炭、石油等常規(guī)能源正逐步被新能源所替代。太陽能以其清潔、環(huán)境友好、不會(huì)枯竭的獨(dú)特優(yōu)勢獲得了極大關(guān)注。然而,太陽能的一大特點(diǎn)是它們具有隨機(jī)性和不可控性,受天氣因素影響較大,這對(duì)光伏電站并網(wǎng)規(guī)劃設(shè)計(jì)工作提出了更高的要求。分布式接入方式能夠最大限度利用太陽能資源,但導(dǎo)致配電網(wǎng)從單電源網(wǎng)絡(luò)變成多電源網(wǎng)絡(luò),引起線路潮流方向的改變。因此,分布式光伏電站接入配電網(wǎng)的規(guī)劃設(shè)計(jì)問題需要更加細(xì)致深入的研究。本文研究了光伏電站出力隨機(jī)性模型,提出了對(duì)其進(jìn)行隨機(jī)模擬的方法;在建立光伏電站仿真模型的基礎(chǔ)上,分析研究了光伏電站并網(wǎng)對(duì)配電網(wǎng)潮流分布、電壓分布以及短路電流和繼電保護(hù)等方面的影響;最后,本文提出了考慮光伏出力隨機(jī)性的并網(wǎng)優(yōu)化規(guī)劃方法,對(duì)分布式光伏電站的并網(wǎng)位置和容量加以優(yōu)化。具體研究內(nèi)容如下:1、分析了太陽能的能源特性,建立了不同時(shí)間的地表光照強(qiáng)度計(jì)算模型,研究了在不同天氣狀態(tài)下地表光強(qiáng)隨時(shí)間變化的分布特點(diǎn)。研究了光電轉(zhuǎn)換模型,建立了以最大出力為基準(zhǔn)值的歸一化光伏電站出力的貝塔分布模型。提出了依據(jù)地區(qū)光照強(qiáng)度統(tǒng)計(jì)數(shù)據(jù)對(duì)貝塔分布概率密度函數(shù)參數(shù)估算,并進(jìn)行隨機(jī)模擬的方法。在實(shí)際算例中驗(yàn)證了該方法的有效性。2、研究了光伏電站并網(wǎng)對(duì)配電網(wǎng)的影響,基于此考慮光伏并網(wǎng)規(guī)劃中需要關(guān)注的安全約束條件。通過分析推導(dǎo),研究了光伏電站并網(wǎng)后線路潮流分布和節(jié)點(diǎn)電壓分布的改變。分析了光伏電站短路電流的特性,研究了包含光伏電站的配電網(wǎng)在發(fā)生短路故障時(shí)線路的短路電流,以及與原有網(wǎng)絡(luò)短路電流的差別,對(duì)繼電保護(hù)系統(tǒng)正常運(yùn)行可能帶來的影響。在建立光伏電站物理仿真模型的基礎(chǔ)上,在IEEE33典型配電網(wǎng)中接入該仿真模型進(jìn)行模擬運(yùn)行,研究了該仿真系統(tǒng)中電網(wǎng)的線路潮流的大小和方向、節(jié)點(diǎn)電壓分布以及系統(tǒng)網(wǎng)絡(luò)損耗等參數(shù)受光伏電站接入的影響。3、考慮光伏電站出力隨機(jī)性特點(diǎn),提出了一種光伏電站并網(wǎng)優(yōu)化規(guī)劃方法。優(yōu)化設(shè)計(jì)光伏電站并網(wǎng)位置和相應(yīng)容量,以降低對(duì)主電網(wǎng)的電能需求、減少碳排放為優(yōu)化目標(biāo),保證斷路器所在線路潮流方向不變,避免并網(wǎng)對(duì)繼電保護(hù)裝置的影響。改進(jìn)了序貫蒙特卡洛模擬概率潮流計(jì)算方法,使之適應(yīng)并網(wǎng)隨機(jī)優(yōu)化問題,并提高了計(jì)算效率。將優(yōu)化約束以罰函數(shù)方式計(jì)入優(yōu)化目標(biāo)形成增廣目標(biāo)函數(shù),并利用粒子群算法求解該優(yōu)化問題。最后通過典型算例驗(yàn)證了該優(yōu)化方法的優(yōu)化效果。
[Abstract]:Energy is an important material guarantee for the development of national economy and the improvement of people's living standard. In recent years, because of the outbreak of energy crisis and the increasingly serious environmental pollution, coal. Conventional energy sources, such as oil, are gradually being replaced by new ones. Solar energy has received great attention because of its unique advantages of cleanliness, environmental friendliness, and undrying up. One of the characteristics of solar energy is their randomness and uncontrollability, which are greatly affected by weather factors. The distributed access mode can maximize the use of solar energy resources, but lead to the distribution network from a single power network to a multi-source network. Therefore, the planning and design of distributed photovoltaic power station access to distribution network needs more detailed and in-depth study. This paper studies the stochastic model of photovoltaic power generation. The method of random simulation is put forward. Based on the simulation model of photovoltaic power station, the influence of grid-connected photovoltaic power station on power flow distribution, voltage distribution, short-circuit current and relay protection is analyzed. Finally, this paper proposes a grid-connected optimal planning method to optimize the grid-connected position and capacity of distributed photovoltaic power plants considering the randomness of photovoltaic power. The specific research contents are as follows: 1. The energy characteristics of solar energy are analyzed, the surface light intensity calculation model at different time is established, the distribution characteristics of surface light intensity with time under different weather conditions are studied, and the photoelectric conversion model is studied. The beta distribution model of normalized photovoltaic power station based on the maximum output force is established, and the parameters of the beta distribution probability density function are estimated based on the regional light intensity statistics data. The effectiveness of the method is verified by a practical example. The effect of grid-connected photovoltaic power station on distribution network is studied. Based on this consideration of photovoltaic grid-connected planning needs to pay attention to the security constraints through analysis and derivation. The changes of power flow distribution and node voltage distribution in photovoltaic power station are studied, and the characteristics of short-circuit current in photovoltaic power station are analyzed. The short-circuit current of the distribution network including photovoltaic power station and the difference between the short-circuit current of the distribution network and the original network are studied. On the basis of establishing the physical simulation model of photovoltaic power station, the simulation model is connected to the typical distribution network of IEEE33 to simulate the operation. In this simulation system, the size and direction of line power flow, node voltage distribution and system network loss are affected by the access of photovoltaic power station. The randomness of photovoltaic power generation is considered. This paper presents an optimal planning method for grid-connected photovoltaic power plants. The optimal design of grid-connected position and corresponding capacity of photovoltaic power plants is aimed at reducing the power demand for the main power grid and reducing carbon emissions. The method of sequential Monte Carlo simulation probabilistic power flow calculation is improved to adapt to the stochastic optimization problem of grid connection. The optimization constraints are taken into account in the form of penalty function to form an augmented objective function. Particle swarm optimization algorithm is used to solve the optimization problem.
【學(xué)位授予單位】:東南大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM615;TM715

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 黎海俊;雪域高原上的光伏電站[J];大眾用電;2000年12期

2 許洪華;深圳1兆瓦并網(wǎng)光伏電站發(fā)電[J];太陽能;2004年05期

3 張躍;馬勇剛;李自應(yīng);;云南德援光伏電站[J];太陽能;2006年04期

4 ;發(fā)改委:中國將建設(shè)首個(gè)大型沙漠光伏電站[J];山東電力技術(shù);2008年06期

5 曾星;;國內(nèi)將興建首座普及型光伏電站[J];發(fā)電設(shè)備;2008年04期

6 章從福;;發(fā)改委稱國家將在甘肅建首個(gè)大型沙漠光伏電站[J];半導(dǎo)體信息;2009年01期

7 ;山東省最大光伏電站將建成[J];山東電力高等專科學(xué)校學(xué)報(bào);2009年05期

8 ;我國第二批光伏電站特許權(quán)招標(biāo)最低價(jià)曝光[J];電源世界;2010年09期

9 ;國內(nèi)規(guī)模最大光伏電站年底發(fā)電[J];華東電力;2010年09期

10 ;國內(nèi)最大光伏電站在濟(jì)寧并網(wǎng)[J];青海電力;2010年03期

相關(guān)會(huì)議論文 前10條

1 楊建;楊宇東;胡會(huì)永;史紅麗;;烏蘭并網(wǎng)光伏電站設(shè)計(jì)體會(huì)[A];2011建筑工程電氣技術(shù)文集[C];2011年

2 顧文;王紅星;徐敦彬;陳士軍;;光伏電站接入電網(wǎng)影響分析[A];第六屆電力工業(yè)節(jié)能減排學(xué)術(shù)研討會(huì)論文集[C];2011年

3 潘捷;任浩翰;戴成鴻;周彬;;上海崇明前衛(wèi)太陽能光伏電站的運(yùn)行實(shí)踐和成果[A];新形勢下長三角能源面臨的新挑戰(zhàn)和新對(duì)策——第八屆長三角能源論壇論文集[C];2011年

4 許穎文;陸成;;分布式光伏電站的數(shù)據(jù)采集研究[A];第七屆電力工業(yè)節(jié)能減排學(xué)術(shù)研討會(huì)論文集[C];2012年

5 劉宏;李田珍;岳興華;;中德財(cái)政合作青海太陽能項(xiàng)目光伏電站設(shè)計(jì)與運(yùn)行[A];第十屆中國太陽能光伏會(huì)議論文集:迎接光伏發(fā)電新時(shí)代[C];2008年

6 陳祥;;基于機(jī)理模型的并網(wǎng)光伏電站實(shí)時(shí)效率分析[A];戰(zhàn)略性新興產(chǎn)業(yè)的培育和發(fā)展——首屆云南省科協(xié)學(xué)術(shù)年會(huì)論文集[C];2011年

7 陳祥;;基于機(jī)理模型的并網(wǎng)光伏電站實(shí)時(shí)效率分析[A];2011年云南電力技術(shù)論壇論文集(入選部分)[C];2011年

8 謝寧;羅安;馬伏軍;陳燕東;帥智康;;光伏電站與配電網(wǎng)諧波交互影響[A];分布式發(fā)電、智能微電網(wǎng)與電能質(zhì)量——第三屆全國電能質(zhì)量學(xué)術(shù)會(huì)議暨電能質(zhì)量行業(yè)發(fā)展論壇論文集[C];2013年

9 王民浩;謝小平;余榮祖;王霽雪;郭雁珩;易躍春;楊存龍;魏顯貴;李偉宏;原向陽;曹海濱;龐秀嵐;;光伏電站信息化管理系統(tǒng)研發(fā)[A];電力行業(yè)信息化優(yōu)秀成果集2013[C];2013年

10 陳祥;;大型并網(wǎng)光伏電站的設(shè)計(jì)與探討[A];2011年云南電力技術(shù)論壇論文集(入選部分)[C];2011年

相關(guān)重要報(bào)紙文章 前10條

1 王東芹 余寬平;大成硅1MW光伏電站項(xiàng)目獲批[N];鎮(zhèn)江日?qǐng)?bào);2010年

2 記者 胡義偉;中利科技光伏電站業(yè)務(wù)快速增長[N];上海證券報(bào);2012年

3 記者 賈明;青海百兆瓦光伏電站集成技術(shù)研究取得新進(jìn)展[N];青海日?qǐng)?bào);2012年

4 王林;西班牙光伏商投資日本光伏電站[N];中國能源報(bào);2012年

5 李偉;中盛光電承建羅馬尼亞最大光伏電站[N];中國能源報(bào);2012年

6 本報(bào)記者 李曉輝;航天機(jī)電“瘦身”聚焦光伏電站建設(shè)[N];中國證券報(bào);2012年

7 記者 李釗;中國企業(yè)進(jìn)軍海外光伏電站市場[N];科技日?qǐng)?bào);2012年

8 記者 周建越;光伏電站建到加拿大[N];蘇州日?qǐng)?bào);2012年

9 記者 張旭東;光伏電站的“春天”也需謹(jǐn)慎[N];第一財(cái)經(jīng)日?qǐng)?bào);2012年

10 李瞧;江西晶科能源與國開行建海外光伏電站[N];中國工業(yè)報(bào);2012年

相關(guān)博士學(xué)位論文 前6條

1 馬聰;大型光伏電站故障檢測與控制技術(shù)[D];山東大學(xué);2016年

2 畢銳;光伏電站有功功率控制相關(guān)關(guān)鍵技術(shù)研究[D];合肥工業(yè)大學(xué);2016年

3 謝寧;大型光伏電站電能質(zhì)量分析與補(bǔ)償系統(tǒng)研究[D];湖南大學(xué);2015年

4 李乃永;電網(wǎng)接納光伏電站并網(wǎng)運(yùn)行的適應(yīng)性及對(duì)策研究[D];山東大學(xué);2012年

5 楊明;大型光伏電站逆變器并網(wǎng)控制策略及穩(wěn)定性分析[D];重慶大學(xué);2014年

6 秦志龍;計(jì)及相關(guān)性的含風(fēng)電場和光伏電站電力系統(tǒng)可靠性評(píng)估[D];重慶大學(xué);2013年

相關(guān)碩士學(xué)位論文 前10條

1 鐘寶華;太陽能發(fā)電隨機(jī)生產(chǎn)模擬及其可信容量評(píng)估[D];華南理工大學(xué);2015年

2 王濤;光伏電站建設(shè)對(duì)靖邊縣土壤、植被的影響研究[D];西北農(nóng)林科技大學(xué);2015年

3 徐曉龍;基于LabVIEW的光伏電站數(shù)據(jù)監(jiān)測系統(tǒng)研究[D];陜西科技大學(xué);2015年

4 戴智慧;并網(wǎng)光伏電站的無功電壓控制研究[D];南京師范大學(xué);2015年

5 楊智琳;大型地面光伏電站發(fā)電系統(tǒng)監(jiān)測的研究[D];河北農(nóng)業(yè)大學(xué);2015年

6 趙蓓;大型光伏電站并網(wǎng)頻率控制策略研究[D];華北電力大學(xué);2015年

7 薛國斌;甘肅某100MW光伏電站接入系統(tǒng)方案研究[D];華北電力大學(xué);2015年

8 武曉寧;光伏電站功率性能分析與研究[D];華北電力大學(xué);2015年

9 扈聰;光伏電站監(jiān)控系統(tǒng)技術(shù)的研究[D];東華大學(xué);2011年

10 楊聰;含光伏電站的配電網(wǎng)可靠性研究[D];南昌大學(xué);2015年

,

本文編號(hào):1410673

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jingjilunwen/jiliangjingjilunwen/1410673.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶6ba6d***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com