BIM技術(shù)在樓宇自動(dòng)化管理中的研究與應(yīng)用
[Abstract]:With the continuous development of science and technology and economy, especially the rapid development of the construction market, the amount of information contained in a project is becoming more and more complex. In the management of building operation and maintenance, it is often necessary to rely on a wealth of experience to make a variety of tests. This resulted in possible miscalculation and wasted a lot of time at the same time. In this paper, BIM technology is used to solve the above problems, and the BIM model established by Revit software is used to analyze the combination of BIM technology and building automation management, so as to improve the emergency efficiency when dealing with emergencies. Therefore, the model is imported into PyroSim for disaster simulation, and the Steering mode and SFPE mode are used to simulate and simulate the evacuation respectively. through the simulation, the feasibility and superiority of the application of BIM technology in building automatic evacuation management are obtained. The simulated experimental data can guide the formulation, optimization, exercise and practice of fire evacuation plan, which provides an important basis for managers and rescue workers. Finally, the energy saving application of BIM technology in building operation and management stage is studied. The energy consumption analysis diagram simulated by BIM model in Ecotect Analysis can guide managers to save energy, and achieve the purpose of quantifying energy consumption in real time. Through the research and application of BIM technology in building automation management, this paper hopes to sublimate it by using BIM technology on the basis of existing building automation management.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TU855;TU17
【參考文獻(xiàn)】
相關(guān)期刊論文 前8條
1 ;Experimental study on fire smoke movement in a multi-floor and multi-room building[J];Science in China(Series E:Technological Sciences);2005年03期
2 過(guò)俊;;BIM在國(guó)內(nèi)建筑全生命周期的典型應(yīng)用[J];建筑技藝;2011年Z1期
3 張曉菲;周寅超;;基于IFC標(biāo)準(zhǔn)的BIM技術(shù)應(yīng)用領(lǐng)域及其前景分析[J];建筑科學(xué);2010年S2期
4 毛路;榮慕寧;姜義力;;Revit在建立建筑信息模型中的應(yīng)用[J];建筑技術(shù);2012年11期
5 張建平;張洋;張新;;基于IFC的BIM三維幾何建模及模型轉(zhuǎn)換[J];土木建筑工程信息技術(shù);2009年01期
6 邱奎寧;張漢義;王靜;王琳;;IFC技術(shù)標(biāo)準(zhǔn)系列文章之一:IFC標(biāo)準(zhǔn)及實(shí)例介紹[J];土木建筑工程信息技術(shù);2010年01期
7 張漢義;邱奎寧;;IFC標(biāo)準(zhǔn)形狀表達(dá)及空間結(jié)構(gòu)實(shí)例介紹[J];土木建筑工程信息技術(shù);2010年02期
8 周宇,
本文編號(hào):2496311
本文鏈接:http://www.sikaile.net/jingjilunwen/jianzhujingjilunwen/2496311.html