萊州市云峰壹號(hào)二期進(jìn)度控制研究
[Abstract]:Project schedule management is a management method that integrates project time and investment control, resource optimization, project schedule planning and management. With the rapid development of domestic economy, the quantity and scale of project construction are increasing. As one of the key contents of project management, the optimization and control of schedule is closely related to the cost, duration and quality of the project. It is also an important measure to ensure the completion of the project on time, to arrange the supply of resources scientifically and to save the cost, which directly affects the smooth construction of the project and relates to the reputation and benefit of the construction unit. At present, the research of project schedule management mainly focuses on the time and cost control and optimization of the project, and seeks a balance between the project construction time and the construction cost. The method of schedule management is to manage the schedule of a single project without the restriction of project resources, but in the actual work, There is a phenomenon of mutual influence and competition for resources among many projects or processes within projects. Therefore, how to coordinate the progress of projects under the condition of limited resources has become a key issue for scholars to study. Based on the comprehensive analysis of the status quo of project schedule management and construction schedule management at home and abroad, this paper aims at the problems existing in the current construction project schedule control. Combined with the actual situation of the second phase of project schedule management in Yunfeng No. 1, Laizhou, mainly from the project schedule planning, schedule optimization to the project and progress control management and implementation of analysis and research, The main research contents of this paper include the following aspects: (1) introduce the background and general situation of the second phase project of Yunfeng No. 1 in Laizhou City, analyze the characteristics and construction difficulties of the project and the risks faced by the project schedule management. This paper puts forward the necessity of the schedule management of the second phase of Yunfeng 1 project. (2) decomposing the WBS task of the second phase of Yunfeng 1 project in Laizhou City, analyzing the logical relationship of the project work, and compiling the horizontal road diagram of the project schedule plan by using the CMP method. The corresponding key routes and duration of Yunfeng 1 Phase II project are preliminarily determined. (3) the theory of critical chain and the optimization of project schedule are analyzed, including the classification of work tasks, the elimination of working procedure safety time, and the identification of project bottleneck resources. The key chain of the construction project, the setting and calculation of the project buffer, the calculation of the working elasticity coefficient and the calculation of the project buffer are determined. For an engineering example, this paper analyzes the second phase project schedule of Yunfeng No. 1 project by using the key chain theory (CMM method) and draws up the progress plan of the project. (4) according to the characteristics of the project, the author analyzes the advantages of the CMM method. (4) according to the characteristics of the project, the organization and technology are introduced. On the basis of contract and management, economy and information, this paper puts forward the guarantee measures, prevention and correction measures for the progress plan of the project. Based on the theory of key chain, the dynamic control and management method of construction schedule is put forward.
【學(xué)位授予單位】:中國(guó)海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU722
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 時(shí)潤(rùn)生;試論監(jiān)理進(jìn)度控制的方式[J];建設(shè)監(jiān)理;2002年01期
2 李永奎,王井祥;結(jié)構(gòu)化集成進(jìn)度控制模式的研究和實(shí)踐[J];基建優(yōu)化;2003年06期
3 裴劍平;淺析施工階段的進(jìn)度控制[J];山西建筑;2005年04期
4 殷照生;;以質(zhì)量?jī)?yōu)化成本 以進(jìn)度控制成本[J];治淮;2006年08期
5 佘榮;;質(zhì)量與進(jìn)度控制在施工中的作用與關(guān)系[J];科技咨詢導(dǎo)報(bào);2007年23期
6 韓少輝;;淺析施工階段的進(jìn)度控制[J];中國(guó)水運(yùn)(下半月);2008年01期
7 林韓龍;;進(jìn)度控制理論和方法的探討[J];廣東建材;2008年10期
8 趙瑞卿;;公路施工成本、質(zhì)量和進(jìn)度控制[J];黑龍江交通科技;2009年09期
9 邵啟德;;淺析如何發(fā)揮進(jìn)度控制的作用[J];山西建筑;2010年06期
10 武強(qiáng);;談項(xiàng)目部進(jìn)度控制的方法和措施[J];山西建筑;2012年04期
相關(guān)會(huì)議論文 前10條
1 毋琨;常中剛;李新莊;;監(jiān)理如何做好工程建設(shè)的進(jìn)度控制工作[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2005)[C];2005年
2 楊利利;屠望;;淺談業(yè)主對(duì)工程項(xiàng)目建設(shè)的進(jìn)度控制[A];土木建筑學(xué)術(shù)文庫(kù)(第16卷)[C];2012年
3 段紅策;;項(xiàng)目計(jì)劃進(jìn)度控制與資源管理[A];河南省土木建筑學(xué)會(huì)2008年學(xué)術(shù)交流會(huì)論文集[C];2008年
4 喬軍;;淺談項(xiàng)目的進(jìn)度控制[A];建材建設(shè)工程優(yōu)秀論文集[C];2011年
5 余應(yīng)厚;;工程建設(shè)施工階段的進(jìn)度控制[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)大會(huì)論文集[C];2010年
6 王鑫;溫紅運(yùn);;談建筑施工項(xiàng)目控制中的進(jìn)度控制[A];土木建筑學(xué)術(shù)文庫(kù)(第9卷)[C];2008年
7 胡曉聰;康汝杰;湛麗;;量化合同進(jìn)度控制體系應(yīng)用研究[A];中國(guó)核科學(xué)技術(shù)進(jìn)展報(bào)告(第二卷)——中國(guó)核學(xué)會(huì)2011年學(xué)術(shù)年會(huì)論文集第10冊(cè)(核情報(bào)(含計(jì)算機(jī)技術(shù))分卷、核技術(shù)經(jīng)濟(jì)與管理現(xiàn)代化分卷)[C];2011年
8 陳友杰;;淺談建設(shè)工程項(xiàng)目的進(jìn)度控制[A];第五屆全國(guó)礦山采選技術(shù)進(jìn)展報(bào)告會(huì)論文集[C];2006年
9 張方良;李健;;P3E/C在石化項(xiàng)目實(shí)施階段進(jìn)度控制中的應(yīng)用[A];2010年石油石化行業(yè)建設(shè)工程總承包與項(xiàng)目管理論壇文集[C];2010年
10 石繼光;張鵬輝;;對(duì)當(dāng)前監(jiān)理進(jìn)度控制工作的幾點(diǎn)思考[A];土木建筑學(xué)術(shù)文庫(kù)(第7卷)[C];2007年
相關(guān)重要報(bào)紙文章 前10條
1 記者 張建平;今年一季度我州安全生產(chǎn)控制指標(biāo)平穩(wěn)運(yùn)行[N];大理日?qǐng)?bào)(漢);2007年
2 記者 張建平;上半年我州安全生產(chǎn)整體運(yùn)行平穩(wěn)[N];大理日?qǐng)?bào)(漢);2007年
3 記者 張建平 通訊員 蘇云;我州一至九月安全生產(chǎn)運(yùn)行平穩(wěn)[N];大理日?qǐng)?bào)(漢);2007年
4 ;常德市安全生產(chǎn)委員會(huì)辦公室關(guān)于2010年1至5月全市生產(chǎn)安全事故及指標(biāo)控制情況的通報(bào)[N];常德日?qǐng)?bào);2010年
5 梁英;淺議進(jìn)度控制和質(zhì)量控制在建筑施工中的作用[N];伊犁日?qǐng)?bào)(漢);2010年
6 記者 張建平;我州1—9月安全生產(chǎn)運(yùn)行平穩(wěn)[N];大理日?qǐng)?bào)(漢);2006年
7 記者 張建平;我州安全生產(chǎn)運(yùn)行平穩(wěn)[N];大理日?qǐng)?bào)(漢);2006年
8 單曉敬;軟包裝企業(yè)如何做好生產(chǎn)與物料控制[N];中國(guó)包裝報(bào);2008年
9 王迪海 龔小忠(作者單位:浙江中聯(lián)建設(shè)集團(tuán)有限公司);淺談施工項(xiàng)目的進(jìn)度控制[N];建筑時(shí)報(bào);2007年
10 記者 謝春陽(yáng);湖南通報(bào)指標(biāo)進(jìn)度[N];中國(guó)安全生產(chǎn)報(bào);2005年
相關(guān)碩士學(xué)位論文 前10條
1 徐鵬;網(wǎng)絡(luò)游戲項(xiàng)目的研發(fā)進(jìn)度控制研究[D];昆明理工大學(xué);2015年
2 毛亞南;A變電站建設(shè)項(xiàng)目進(jìn)度管理研究[D];復(fù)旦大學(xué);2013年
3 魏圣亭;電力工程施工階段的進(jìn)度控制[D];山西大學(xué);2015年
4 宋曉華;基于關(guān)鍵法中小建筑企業(yè)施工項(xiàng)目的進(jìn)度控制研究[D];江西理工大學(xué);2015年
5 王友峰;煤礦企業(yè)項(xiàng)目管理信息系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];電子科技大學(xué);2014年
6 李U,
本文編號(hào):2176750
本文鏈接:http://www.sikaile.net/jingjilunwen/jianzhujingjilunwen/2176750.html