沙子口集中供熱工程造價(jià)控制研究
[Abstract]:In recent years, in the construction of central heating project, the shortage and bottleneck of project cost control and development gradually become prominent. The phenomenon of budget exceeding estimate, budget exceeding budget estimate, settlement exceeding budget is still very common. The irregular bidding market causes some heating projects to lose control of investment and have a large fund gap, which restricts the rapid development of central heating project construction. Based on the problems existing in the heating engineering cost control system in our country and the characteristics of the heating project, this paper makes a practical investigation of the whole process of the heating project, based on the theory of engineering cost control. This paper analyzes the current situation and problems of the cost control of central heating engineering, establishes the cost control measures based on the whole life cycle, brings the value engineering method into the implementation process of the Shazikou central heating project, From the point of view of combining technology and economy, the cost control of heating engineering is systematically studied in a unique multidisciplinary team way. Through continuous and innovative activities, the cost of the whole life of the project, product or service can be reduced by optimizing the scheme. Enhance the value of all stakeholders, thus improve the management level of heating project cost control, and then reduce the construction cost, reduce the consumption of resources, and provide assistance for the economic benefits and cash flow of the heating enterprises. The purpose of obtaining greater economic and social benefits is as follows: finally, the application of value engineering in Shazikou central heating cost screw system is summarized on the basis of the above research, and some countermeasures and suggestions are put forward to perfect the project cost.
【學(xué)位授予單位】:中國(guó)海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU995;TU723.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 彭翔;何婷婷;;工程造價(jià)控制策略研析[J];四川建筑;2006年S1期
2 張曉非;;論工程造價(jià)控制不力的原因及對(duì)策[J];科技資訊;2006年11期
3 薛明泰;;試析工程造價(jià)控制不力的原因及對(duì)策[J];科技資訊;2007年31期
4 薛明泰;盧文克;;試析工程造價(jià)控制不力的原因及對(duì)策[J];科技資訊;2007年33期
5 莊榮英;;關(guān)于對(duì)做好公路工程造價(jià)控制的若干探討[J];科技創(chuàng)新導(dǎo)報(bào);2009年01期
6 盧利花;杜金義;;淺談公路工程造價(jià)控制與管理[J];山西建筑;2009年21期
7 于連會(huì);;淺談機(jī)械廠工程造價(jià)控制[J];科技資訊;2009年32期
8 溫才福;;淺析公路工程造價(jià)控制與管理工作[J];價(jià)值工程;2010年06期
9 王天增;;淺議工程造價(jià)控制[J];建筑監(jiān)督檢測(cè)與造價(jià);2011年01期
10 溫明;;對(duì)加強(qiáng)工程造價(jià)控制的幾點(diǎn)看法[J];中國(guó)新技術(shù)新產(chǎn)品;2011年24期
相關(guān)會(huì)議論文 前10條
1 郭建平;;關(guān)于工程造價(jià)控制的幾點(diǎn)思考[A];科學(xué)發(fā)展——七省市第九屆建筑市場(chǎng)與招標(biāo)投標(biāo)優(yōu)秀論文集[C];2009年
2 劉軍陽(yáng);郭超鋒;;施工階段工程造價(jià)控制與管理[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)研討會(huì)論文集[C];2010年
3 薛冰;支慧;;對(duì)加強(qiáng)工程造價(jià)控制的幾點(diǎn)思考[A];土木建筑學(xué)術(shù)文庫(kù)(第13卷)[C];2010年
4 盧s
本文編號(hào):2175950
本文鏈接:http://www.sikaile.net/jingjilunwen/jianzhujingjilunwen/2175950.html