幸福家園房地產(chǎn)開發(fā)項目成本控制研究
發(fā)布時間:2018-07-02 22:41
本文選題:成本控制 + 成本控制影響因素; 參考:《哈爾濱工程大學(xué)》2014年碩士論文
【摘要】:隨著中國改革進(jìn)程的不斷深化與發(fā)展,我國的房地產(chǎn)業(yè)進(jìn)入高速發(fā)展時期,同時也進(jìn)入競爭激烈的時代,企業(yè)要想獲得利潤,必須要做好成本管理與控制。但是從我國房地產(chǎn)企業(yè)的管理現(xiàn)狀來看,大多數(shù)企業(yè)對成本控制的重要性還沒有足夠的認(rèn)識。因此,在經(jīng)濟競爭持續(xù)激烈的今天,必須加強對企業(yè)成本控制的研究與應(yīng)用,以實現(xiàn)企業(yè)利潤最大化。本文以幸福家園房地產(chǎn)企業(yè)成本控制為研究對象,在介紹幸福家園房地產(chǎn)項目基本情況的基礎(chǔ)上,著重介紹了影響該項目成本控制的各種因素,包括內(nèi)部要素和外部要素。即企業(yè)自身的成本控制制度和方法以及國家政策法規(guī)、經(jīng)濟形勢的影響。以此為基礎(chǔ)發(fā)現(xiàn)該項目成本控制中存在的問題。同時根據(jù)成本控制原則,分析了幸福家園房地產(chǎn)項目各個階段的成本控制,包括投資決策階段、規(guī)劃設(shè)計階段、實施階段、銷售階段的成本控制。對每一個階段的控制重點進(jìn)行了分析,理論與實際結(jié)合,提出該項目的成本管理保障措施。本文通過對幸福家園房地產(chǎn)項目成本控制的研究,詳細(xì)分析了該項目各階段的成本控制要點以及在各個階段需要重點執(zhí)行的工作。希望通過該項目的研究,能及時發(fā)現(xiàn)、糾正工程管理過程中的偏差,控制整個項目的開發(fā)成本,將成本支出控制在預(yù)算范圍內(nèi)。并根據(jù)該項目的實際特征,制定相應(yīng)的成本控制保障方法。
[Abstract]:With the deepening and development of China's reform process, China's real estate industry has entered a period of rapid development, but also entered the era of fierce competition. If enterprises want to obtain profits, they must do a good job of cost management and control. However, from the current management situation of real estate enterprises in China, most enterprises do not have enough understanding of the importance of cost control. Therefore, in order to maximize the profits of enterprises, we must strengthen the research and application of cost control in order to maximize the profits of enterprises when the economic competition continues to be fierce. This paper takes the cost control of the happy home real estate enterprise as the research object. On the basis of introducing the basic situation of the happy home real estate project, this paper emphatically introduces the various factors that affect the cost control of the project, including internal and external factors. That is, the cost control system and method of the enterprise itself, the influence of national policies and regulations, economic situation. Based on this, the problems in cost control of the project are found. At the same time, according to the principle of cost control, this paper analyzes the cost control of each stage of the real estate project of happy home, including the stage of investment decision, the stage of planning and design, the stage of implementation and the stage of sale. This paper analyzes the key points of control in each stage, combines theory with practice, and puts forward the cost management guarantee measures of the project. Through the research on the cost control of the real estate project of happy home, this paper analyzes in detail the key points of cost control in each stage of the project and the work that needs to be carried out in each stage. It is hoped that through the research of the project, the deviation in the process of project management can be found and corrected in time, the development cost of the whole project can be controlled, and the cost expenditure can be controlled within the budget range. According to the actual characteristics of the project, the corresponding cost control methods are developed.
【學(xué)位授予單位】:哈爾濱工程大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F299.233.42
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 江新;張巍;彭振禮;李琦;;基于價值鏈的工程項目群全面成本管理模型研究[J];人民長江;2013年19期
2 賴勝華;;淺析施工企業(yè)項目成本控制與管理[J];現(xiàn)代經(jīng)濟信息;2013年14期
3 萬元林;張賽;;PDCA循環(huán)在建設(shè)項目成本管理中的應(yīng)用[J];施工技術(shù);2013年S1期
4 安庸東;;建筑工程招投標(biāo)管理措施研究[J];門窗;2013年06期
5 ;國外房地產(chǎn)成本控制管理[J];城市開發(fā);2013年06期
6 江開洪;;房建項目成本控制問題探討[J];科技致富向?qū)?2013年05期
7 于楓;;房地產(chǎn)項目責(zé)任成本管理與評價體系研究[J];新視野;2012年06期
8 潘玲霞;;我國現(xiàn)行的房地產(chǎn)稅收政策及其對企業(yè)的影響[J];現(xiàn)代營銷(學(xué)苑版);2012年08期
9 孔宏偉;;我國建設(shè)項目成本管理理論及應(yīng)用分析[J];建筑經(jīng)濟;2012年05期
10 牛立才;;EPC項目成本管理探討[J];工會論壇(山東省工會管理干部學(xué)院學(xué)報);2012年02期
,本文編號:2091174
本文鏈接:http://www.sikaile.net/jingjilunwen/fangdichanjingjilunwen/2091174.html
最近更新
教材專著