PPP模式下地下綜合管廊入廊定價(jià)研究
[Abstract]:Underground integrated pipe gallery is a public tunnel used for centralized laying of electric power, communication, radio and television, water supply, drainage, heat, gas and other municipal pipelines. As a kind of intensive municipal infrastructure, the construction of underground integrated pipe gallery can effectively solve many problems brought by traditional pipeline laying, such as repeated excavation of roads, traffic jam, environmental pollution and so on. However, because of the huge investment and high cost of construction and operation, it has not been widely promoted in our country. Solving the problem of investment and operation charge of underground integrated pipe corridor project has become a necessary condition to promote the construction of underground integrated pipe corridor. Based on this, this paper attempts to introduce the PPP model into the construction of underground integrated pipe gallery, and on the basis of this, makes a reasonable pricing and charging strategy to solve the problem. Based on the research on the theory of PPP model and the related knowledge of underground integrated pipe gallery, this paper demonstrates the feasibility of applying PPP model to the project of underground integrated pipe corridor in policy and economic aspects. Then, by using for reference and perfecting the PPP pattern selection method based on the three-dimensional framework of transaction cooperation, this paper determines the path method of PPP pattern recognition based on ownership, management right, degree of cooperation and risk sharing framework. According to the specific characteristics of the underground integrated pipe corridor project, the PPP model suitable for the underground integrated pipe corridor project is selected. Based on the pertinence of the research direction and the generality of the research object, this paper chooses the current more suitable B-SO-T model as the following research foundation, uses the principal-agent theory as the theoretical support, and analyzes the pricing stakeholders. On the basis of the basic principles of pricing, the composition of pricing costs and the factors affecting pricing, a pricing model of corridor entry is constructed based on the comprehensive consideration of the interests of pipeline units, consumers, government departments and social investors. The applicability and reasonableness of the model are verified by taking the Central Ring Line Project in the North District of Yan'an City as an example. The study on pricing of the underground integrated pipe corridor under PPP mode mainly solves two problems. One is to determine the current development stage of the PPP model more suitable for our country's underground integrated plumbing corridor, B-SO-T mode, the choice of the model for the government to use the PPP model to solve the problem of investment to provide a new way of thinking; Secondly, on the basis of taking into account the interests of multiple participants, a kind of incentive compatible corridor pricing model is constructed. The realization of this model can not only maintain the interests of pipeline units and consumers. On the basis of satisfying the profits of the investors, it can encourage the investors to declare the real cost, reduce the operating cost of the pipe gallery and lighten the financial burden of the government.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F299.24;F283
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張宏;崔啟明;韋翔;;城市綜合管廊投融資模式探討[J];建筑經(jīng)濟(jì);2016年12期
2 譚忠盛;陳雪瑩;王秀英;黃明利;;城市地下綜合管廊建設(shè)管理模式及關(guān)鍵技術(shù)[J];隧道建設(shè);2016年10期
3 吳麗洋;;論P(yáng)PP項(xiàng)目中政府補(bǔ)貼金額的合理確定[J];中國(guó)工程咨詢;2016年08期
4 劉慧慧;孫劍;李飛飛;;城市地下綜合管廊應(yīng)用PPP模式的VFM評(píng)價(jià)[J];土木工程與管理學(xué)報(bào);2016年04期
5 吳德珠;;淺議通風(fēng)系統(tǒng)在城市綜合管廊消防設(shè)計(jì)中工程及技術(shù)要求[J];江西建材;2016年12期
6 ;2016年全國(guó)地下綜合管廊15個(gè)試點(diǎn)城市公布[J];建筑技術(shù)開發(fā);2016年06期
7 鄭傳軍;徐芬;成虎;;基于項(xiàng)目治理視角的PPP治理結(jié)構(gòu)研究[J];建筑經(jīng)濟(jì);2016年04期
8 劉晨晨;楊志強(qiáng);馬驥;李萌;;地下綜合管廊建設(shè)的若干問題研究[J];測(cè)繪通報(bào);2015年S1期
9 蔡新民;;高速公路PPP項(xiàng)目特許定價(jià)機(jī)制研究[J];價(jià)格理論與實(shí)踐;2015年09期
10 史樂峰;吳文建;曾令鶴;任玉瓏;;電動(dòng)汽車充電服務(wù)PPP定價(jià)模型及應(yīng)用[J];價(jià)格理論與實(shí)踐;2015年08期
相關(guān)博士學(xué)位論文 前2條
1 夏芳晨;城市公共資源運(yùn)營(yíng)機(jī)制研究[D];東北財(cái)經(jīng)大學(xué);2011年
2 王鏡;基于博弈分析的城市公共交通定價(jià)及補(bǔ)貼的理論與方法研究[D];北京交通大學(xué);2008年
相關(guān)碩士學(xué)位論文 前10條
1 王金萍;我國(guó)城市基礎(chǔ)設(shè)施PPP項(xiàng)目的政府監(jiān)管問題研究[D];中國(guó)礦業(yè)大學(xué);2016年
2 王海霞;PPP模式應(yīng)用于我國(guó)養(yǎng)老機(jī)構(gòu)建設(shè)的研究[D];財(cái)政部財(cái)政科學(xué)研究所;2014年
3 宋定;PPP模式下公共管廊運(yùn)營(yíng)管理研究[D];北京建筑大學(xué);2014年
4 李川;基于委托代理理論的政府投資項(xiàng)目代建制研究[D];重慶大學(xué);2013年
5 楊亞楠;基于多屬性決策的PPP(Public-Private Partnerships)模式選擇研究[D];大連工業(yè)大學(xué);2013年
6 張秋玲;公共管廊PPP投融資模式研究[D];北京建筑工程學(xué)院;2012年
7 任棟;基于委托—代理理論的政府對(duì)企業(yè)R&D支出激勵(lì)模型與實(shí)證研究[D];山東經(jīng)濟(jì)學(xué)院;2011年
8 謝磊;基于委托—代理理論的供應(yīng)鏈契約協(xié)調(diào)研究[D];江蘇大學(xué);2009年
9 邱玉婷;我國(guó)城市共同溝項(xiàng)目的投融資分析[D];同濟(jì)大學(xué);2008年
10 孫本剛;準(zhǔn)經(jīng)營(yíng)性基礎(chǔ)設(shè)施項(xiàng)目PPP模式研究[D];同濟(jì)大學(xué);2006年
,本文編號(hào):2395492
本文鏈接:http://www.sikaile.net/jingjifazhanlunwen/2395492.html