逆作法中地下連續(xù)墻與鋼管柱關(guān)鍵施工技術(shù)應(yīng)用研究
[Abstract]:With the continuous development of urban construction, urban traffic has become a difficult and hot issue in our society. Urban traffic is not a municipal engineering problem, but more important is a comprehensive social problem in many aspects. In the next few years, urban rail transit and other new vehicles will develop rapidly with the continuous progress of the society. At present, the urban rail transit in China is still in the initial stage of development. In the process of construction, how to make overall planning, optimize the pattern, allocate resources reasonably, purify the environment and take measures according to local conditions are the problems that should be solved urgently for every constructor. At this point, the common construction method has been difficult to meet the needs of modern production and construction. Therefore, because of its wide applicability, high safety and short construction period, Economical and technical advantages such as saving engineering cost have become one of the new methods widely used in urban construction. This paper gives a detailed overview of the generation, classification, application principle and method of the reverse method. At the same time, based on the construction example of Wanjiali Square Station Project of Changsha Metro Line 5, the complicated geological conditions are analyzed and discussed. Low clearance and how to carry out the reverse construction of the ground connection wall in the urban main road environment; Combined with the construction technology of steel pipe column in Wanjiali Square Station of Changsha Metro Line 5, the original construction scheme was improved, the steel tube was cancelled in the original design, the positioner was not installed on the anti-drawing pile and the cup was chiseled. After analyzing the deformation of soil after excavation and the influence on the surrounding building, the real-time monitoring is adopted, and the monitoring results show that, The construction method of the connecting wall and the improvement of the construction technology of the steel pipe column meet the safety requirements, which provides a good reference for the design and optimization of the construction scheme of similar projects in the future.
【學(xué)位授予單位】:安徽理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU753
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 江鵬;;地鐵施工管理與施工技術(shù)分析[J];四川水泥;2016年12期
2 應(yīng)子水;;關(guān)于地鐵施工技術(shù)要點(diǎn)的具體分析[J];建材與裝飾;2016年33期
3 劉加峰;;卵石及砂巖地質(zhì)條件下的地下連續(xù)墻施工[J];建筑施工;2015年12期
4 喬新生;;日本媒體背后的價(jià)值觀輸出與平衡[J];青年記者;2015年27期
5 宋爭(zhēng)平;;深基坑支護(hù)技術(shù)的現(xiàn)狀與發(fā)展探討[J];科技創(chuàng)新與應(yīng)用;2014年30期
6 姚國(guó)偉;;受既有管線干擾的地下連續(xù)墻施工技術(shù)探討[J];市政技術(shù);2013年06期
7 郭慧;;探析逆作法施工技術(shù)的施工原理及技術(shù)措施[J];科技創(chuàng)新與應(yīng)用;2013年06期
8 游江;;樁基檢測(cè)技術(shù)的現(xiàn)狀與發(fā)展[J];科技創(chuàng)新與應(yīng)用;2012年24期
9 馬海彬;姚傳勤;白蓉;張忠良;;超大截面箱型鋼管混凝土柱施工方案評(píng)價(jià)[J];安徽建筑工業(yè)學(xué)院學(xué)報(bào)(自然科學(xué)版);2012年04期
10 吳銀霞;;周邊有建筑存在環(huán)境下深基坑施工的影響與施工技術(shù)[J];科技創(chuàng)新與應(yīng)用;2012年20期
,本文編號(hào):2380302
本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/2380302.html