基于馬爾科夫排隊(duì)網(wǎng)的逆作法土方施工優(yōu)化研究

發(fā)布時(shí)間:2018-06-03 18:05

  本文選題:馬爾科夫排隊(duì)網(wǎng)模型 + 逆作法。 參考:《成都理工大學(xué)》2017年碩士論文


【摘要】:在逆作法土方施工工程過(guò)程中,土方工程施工較復(fù)雜,各類(lèi)施工機(jī)械、人力物力等排隊(duì)配合不協(xié)調(diào),既影響生產(chǎn)效率,也給現(xiàn)場(chǎng)管理帶來(lái)很多問(wèn)題。本文以成本和時(shí)間優(yōu)化為目標(biāo),將Markov(馬爾科夫)排隊(duì)網(wǎng)絡(luò)應(yīng)用到運(yùn)用逆作法土方工程中,通過(guò)實(shí)地收取調(diào)查數(shù)據(jù),對(duì)結(jié)合A工程基坑開(kāi)挖的逆作法土方施工進(jìn)行數(shù)學(xué)建模和仿真優(yōu)化研究,為逆作法土方工程的機(jī)械設(shè)備組織方案提供了一套思路。其成果如下:(1)通過(guò)對(duì)逆作法土方施工的問(wèn)題描述,以實(shí)際逆作法土方施工過(guò)程中挖掘機(jī)、推土機(jī)、運(yùn)載汽車(chē)等各機(jī)械之間配合度較高的作為研究對(duì)象,分析各機(jī)械之間的時(shí)間、成本等消耗量,以縮短施工工期,減少施工成本為目的,討論各機(jī)械、各節(jié)點(diǎn)關(guān)系之間的排隊(duì)建模條件,建立了優(yōu)化模型。(2)為了驗(yàn)證Markov(馬爾科夫)排隊(duì)網(wǎng)建立的排隊(duì)優(yōu)化模型,將模型應(yīng)用到A工程逆作法土方施工的土方開(kāi)挖過(guò)程中進(jìn)行仿真優(yōu)化,仿真優(yōu)化結(jié)果表明:模型是可行有效的,在逆作法土方施工工程過(guò)程中不僅縮短土方施工工期時(shí)間,而且減少施工成本。(3)運(yùn)用現(xiàn)場(chǎng)管理理論和A工程數(shù)據(jù),從優(yōu)化服務(wù)效率,改善優(yōu)化逆作法土方施工的挖掘現(xiàn)場(chǎng)和卸料現(xiàn)場(chǎng)的視角,提出現(xiàn)場(chǎng)改善、施工優(yōu)化的對(duì)策和建議。本文結(jié)合實(shí)際調(diào)研與理論知識(shí),將Markov(馬爾科夫)排隊(duì)網(wǎng)用于逆作法土方施工中,在保證了逆作法土方施工質(zhì)量與安全的前提下,縮短逆作法土方施工工期,減少逆作法土方施工成本費(fèi)用,為逆作法土方施工效率改善提供了一套方案。
[Abstract]:In the process of reverse earthwork construction, the construction of earthwork is more complicated, and all kinds of construction machinery, manpower and material resources are not coordinated, which not only affects the production efficiency, but also brings a lot of problems to the field management. Aiming at cost and time optimization, this paper applies Markov-Markov queuing network to earthwork engineering using reverse method, and collects survey data on the spot. The mathematical modeling and simulation optimization of the earthwork construction combined with the excavation of foundation pit of engineering A are studied, which provides a set of ideas for the organization of mechanical equipment in the earthwork. The results are as follows: 1) by describing the problem of earthwork construction in reverse practice, taking the higher cooperation between excavators, bulldozers, carrying vehicles and other machinery in the actual reverse construction process as the research object, and analyzing the time between the various machines, In order to shorten the construction period and reduce the construction cost, this paper discusses the queueing modeling conditions between each machine and each node, and establishes the optimization model. 2) in order to verify the queuing optimization model established by Markov-Markov queuing network, The model is applied to the simulation and optimization of earthwork excavation in reverse earthwork construction of engineering A. The simulation and optimization results show that the model is feasible and effective, and not only shortens the time of earthwork construction in the process of reverse earthwork construction, but also reduces the time of earthwork construction. Moreover, using the field management theory and A engineering data, from the perspective of optimizing service efficiency, improving the excavation site and unloading site of the optimized reverse method, the countermeasures and suggestions of site improvement and construction optimization are put forward. Combined with practical investigation and theoretical knowledge, Markov-Markov queuing network is used in reverse earthwork construction. Under the premise of ensuring the quality and safety of reverse earthwork construction, the construction period of reverse earthwork is shortened. Reducing the cost of reverse earthwork construction provides a set of scheme for improving the efficiency of reverse earthwork construction.
【學(xué)位授予單位】:成都理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:TU751

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 祁兵;李忠富;;利用排隊(duì)論確定挖土機(jī)數(shù)量及其在BIM中的應(yīng)用[J];工程管理學(xué)報(bào);2015年05期

2 臧園;;淺談深基坑逆作法施工與順作法施工[J];科教導(dǎo)刊(上旬刊);2014年11期

3 劉佳;;大型深基坑土方開(kāi)挖技術(shù)[J];海峽科學(xué);2010年10期

4 ;SERIES QUEUING NETWORK SCHEDULING APPROACH TO CO-SCHEDULING MODEL OF THREE GORGES-GEZHOU DAM[J];Journal of Systems Science & Complexity;2010年04期

5 黃建彰;韋偉鴻;黃勇;田才煜;;超深基坑土方開(kāi)挖方案的優(yōu)化及現(xiàn)場(chǎng)管理[J];建筑施工;2008年05期

6 趙新;;城市土方工程車(chē)輛運(yùn)輸循環(huán)時(shí)間的研究[J];河南工業(yè)大學(xué)學(xué)報(bào)(自然科學(xué)版);2006年01期

7 高錦林,王永新;軟土地質(zhì)地鐵車(chē)站蓋挖順作法施工實(shí)踐及關(guān)鍵技術(shù)[J];現(xiàn)代城市軌道交通;2005年01期

8 張立輝,王華,錢(qián)濤;地下室基坑圍護(hù)及土方施工技術(shù)[J];浙江建筑;2004年03期

9 黃德中;土方工程機(jī)械選型配套的排隊(duì)論網(wǎng)絡(luò)分析[J];農(nóng)業(yè)機(jī)械學(xué)報(bào);2004年03期

10 鄭小盈,陳德人;Using multi-class queuing network to solve performance models of e-business sites[J];Journal of Zhejiang University Science;2004年01期

相關(guān)碩士學(xué)位論文 前2條

1 高燕;基于排隊(duì)論的A品牌家電企業(yè)售后維修服務(wù)系統(tǒng)的優(yōu)化研究[D];山東大學(xué);2014年

2 李萍;土方工程機(jī)械化施工組織的優(yōu)化研究[D];長(zhǎng)安大學(xué);2001年

,

本文編號(hào):1973699

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/1973699.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶f1143***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com