電網(wǎng)工程項(xiàng)目全過(guò)程風(fēng)險(xiǎn)識(shí)別與評(píng)價(jià)研究
本文選題:電網(wǎng)工程項(xiàng)目 + 風(fēng)險(xiǎn)識(shí)別 ; 參考:《華北電力大學(xué)》2017年碩士論文
【摘要】:電網(wǎng)是國(guó)家重要基礎(chǔ)設(shè)施,關(guān)系經(jīng)濟(jì)安全和能源安全。電力是重要的生產(chǎn)資料和生活資料,供電服務(wù)覆蓋全社會(huì)每個(gè)行業(yè)、企業(yè)和家庭。電力發(fā)展關(guān)系國(guó)民經(jīng)濟(jì)命脈和國(guó)家能源安全。因此電力工程項(xiàng)目風(fēng)險(xiǎn)管理尤為重要,部分企業(yè)風(fēng)險(xiǎn)意識(shí)不強(qiáng),對(duì)電網(wǎng)工程項(xiàng)目的風(fēng)險(xiǎn)沒(méi)有進(jìn)行全面系統(tǒng)的分析與評(píng)估,從而導(dǎo)致了電網(wǎng)工程項(xiàng)目在實(shí)施過(guò)程中,遭受到本來(lái)可以避免的損失,不僅影響了工程建設(shè)進(jìn)度和實(shí)施效果,也影響了企業(yè)健康可持續(xù)發(fā)展。本文介紹了電網(wǎng)工程項(xiàng)目的一些基本特征,諸如建設(shè)周期長(zhǎng)、投資數(shù)額大、項(xiàng)目復(fù)雜度高,從而說(shuō)明了電網(wǎng)工程項(xiàng)目進(jìn)行風(fēng)險(xiǎn)識(shí)別的必要性。風(fēng)險(xiǎn)識(shí)別就是從系統(tǒng)的角度出發(fā),將項(xiàng)目實(shí)施過(guò)程中面臨的直接風(fēng)險(xiǎn)、潛在風(fēng)險(xiǎn)識(shí)別出來(lái)的過(guò)程,同時(shí)要分析找出導(dǎo)致這些風(fēng)險(xiǎn)的深層次因素,將這些因素進(jìn)行分類,找到產(chǎn)生風(fēng)險(xiǎn)的主要因素,并對(duì)主要因素發(fā)生的概率以及所造成風(fēng)險(xiǎn)的危害進(jìn)行估計(jì)并加以應(yīng)對(duì)。本文將風(fēng)險(xiǎn)識(shí)別與電網(wǎng)工程項(xiàng)目相結(jié)合,介紹了風(fēng)險(xiǎn)識(shí)別的意義和國(guó)內(nèi)外發(fā)展現(xiàn)狀,提出了電網(wǎng)工程項(xiàng)目全過(guò)程風(fēng)險(xiǎn)識(shí)別,將電網(wǎng)工程項(xiàng)目劃分為六個(gè)階段,對(duì)這六個(gè)階段的每個(gè)環(huán)節(jié)進(jìn)行風(fēng)險(xiǎn)識(shí)別,找出引發(fā)風(fēng)險(xiǎn)的因素,以及這些因素之間的聯(lián)系,再?gòu)南到y(tǒng)角度對(duì)這些因素進(jìn)行評(píng)價(jià),從而找到引發(fā)風(fēng)險(xiǎn)的主要因素。本文選用了基于多層次模糊綜合評(píng)價(jià)的方法,對(duì)發(fā)生風(fēng)險(xiǎn)的主要因素進(jìn)行評(píng)價(jià),根據(jù)發(fā)生風(fēng)險(xiǎn)的概率和風(fēng)險(xiǎn)發(fā)生時(shí)對(duì)項(xiàng)目造成的影響大小,判斷出項(xiàng)目存在的風(fēng)險(xiǎn)大小,并在一個(gè)實(shí)例中對(duì)以上方法進(jìn)行了實(shí)際使用,說(shuō)明了方法的可行性。
[Abstract]:Power grid is an important national infrastructure, related to economic security and energy security. Electricity is an important means of production and means of livelihood, power supply services cover all sectors of society, enterprises and households. Electric power development relates to the lifeblood of national economy and national energy security. Therefore, the risk management of electric power engineering project is particularly important, some enterprises are not aware of the risk, and the risk of the power network project is not analyzed and evaluated systematically, which leads to the implementation of the power grid project in the process of implementation. The loss that could have been avoided not only affects the progress and effect of construction, but also affects the healthy and sustainable development of enterprises. This paper introduces some basic characteristics of power grid engineering projects, such as long construction period, large investment amount and high project complexity, thus explaining the necessity of risk identification in power grid engineering projects. Risk identification is the process of identifying the direct risk and potential risk in the implementation of the project from a systematic point of view. At the same time, it is necessary to analyze and find out the deep-seated factors that lead to these risks, and classify these factors. Find out the main risk factors and estimate the probability of the main factors and the hazards caused by the risk. This paper combines the risk identification with the power grid engineering project, introduces the significance of risk identification and the development situation at home and abroad, puts forward the whole process risk identification of the power network engineering project, and divides the power grid engineering project into six stages. To identify the risk in each of the six stages, to find out the factors that lead to the risk, and the relationship between these factors, and then evaluate these factors from the system point of view, and find out the main factors that lead to the risk. In this paper, based on the method of multi-level fuzzy comprehensive evaluation, the main factors of occurrence risk are evaluated. According to the probability of occurrence of risk and the influence of risk on the project, the size of risk is judged. An example is given to illustrate the feasibility of the method.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 高飛;;淺談如何做好建設(shè)項(xiàng)目前期階段的事前審計(jì)[J];江蘇建材;2014年04期
2 何海虹;;項(xiàng)目風(fēng)險(xiǎn)管理及控制[J];石油化工建設(shè);2014年02期
3 邢建浩;;電網(wǎng)建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理分析[J];電子制作;2014年03期
4 丁魯昌;尹東;厲軍;陳亮;;選擇110kV電力電纜線路的設(shè)計(jì)及施工思路思考[J];科技創(chuàng)新導(dǎo)報(bào);2013年34期
5 張永輝;;電網(wǎng)項(xiàng)目工程造價(jià)的風(fēng)險(xiǎn)管理淺析[J];科技創(chuàng)新與應(yīng)用;2013年12期
6 梁猛;;電力工程項(xiàng)目風(fēng)險(xiǎn)管理的幾點(diǎn)創(chuàng)新研究[J];中國(guó)新技術(shù)新產(chǎn)品;2013年08期
7 梅艷巒;吳偉釗;何敏鴻;;電網(wǎng)工程項(xiàng)目投標(biāo)的風(fēng)險(xiǎn)管理研究[J];中國(guó)集體經(jīng)濟(jì);2012年31期
8 姚武;;電網(wǎng)建設(shè)項(xiàng)目風(fēng)險(xiǎn)識(shí)別及評(píng)價(jià)指標(biāo)體系的構(gòu)建[J];科技視界;2012年15期
9 賀彪;朱維政;鄒宏亮;;基于熵權(quán)的臺(tái)州電網(wǎng)建設(shè)項(xiàng)目前期風(fēng)險(xiǎn)控制[J];科技創(chuàng)新導(dǎo)報(bào);2011年26期
10 徐寧;;電力工程項(xiàng)目風(fēng)險(xiǎn)管理實(shí)施方法研究[J];甘肅科技;2009年23期
相關(guān)碩士學(xué)位論文 前10條
1 孔墨淋;電力技改工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué);2014年
2 王其輝;建設(shè)項(xiàng)目施工階段風(fēng)險(xiǎn)管理研究[D];鄭州大學(xué);2014年
3 高佩娜;基于SEM與物元模型的電網(wǎng)項(xiàng)目管理成熟度評(píng)價(jià)研究[D];華北電力大學(xué);2014年
4 張彥輝;電力隧道工程項(xiàng)目質(zhì)量控制研究[D];華北電力大學(xué);2013年
5 任宇新;內(nèi)蒙古電力公司電網(wǎng)建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué);2013年
6 王珊珊;北方聯(lián)合電力公司營(yíng)銷策略研究[D];內(nèi)蒙古大學(xué);2012年
7 楊鯤鵬;西郊110千伏變電站建設(shè)項(xiàng)目風(fēng)險(xiǎn)分析研究[D];華北電力大學(xué);2012年
8 王志文;基于全壽命周期的電力工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué);2012年
9 洪俊;電網(wǎng)建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué)(北京);2011年
10 何曉穎;基于計(jì)量經(jīng)濟(jì)學(xué)的電力投資分析與模型研究[D];北京交通大學(xué);2011年
,本文編號(hào):1871318
本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/1871318.html